Professional Documents
Culture Documents
Assignment 1
Assignment 1
ASSIGNMENT 1
TABLE OF CONTEXT
QUESTION 1……………………………………………………………………………………..3
QUESTION 2……………………………………………………………………………………..4
QUESTION 3……………………………………………………………………………………..5
QUESTION 4……………………………………………………………………………………..6
QUESTION 5……………………………………………………………………………………..7
QUESTION 6……………………………………………………………………………………...8
QUESTION 7……………………………………………………………………………………..9
QUESTION 8…………………………………………………………………………………….10
QUESTION 9…………………………………………………………………………………….11
QUESTION 10…………………………………………………………………………………...12
QUESTION 11…………………………………………………………………………………...13
2
ASSIGNMENT 1
QUESTION 1
Answer:
QUESTION 2
Answer:
QUESTION 3
Answer:
QUESTION 4
Q. How does the master format help all participants in the industry
communicate?
Answer:
Master format can be a helpful for the communication during construction of the
project which have all the information of the site and that is divided into the 50
total groups, 34 out of 50 are active and remaining 14 are inactive. Remaining
14 groups can be used during the future expansion. Every division has an
identification number that details can be a helpful during the construction.
6
ASSIGNMENT 1
QUESTION 5
Answer:
General contractors are placed at the top level in construction project. They
directly assign the work for the sub contractor. They analyze the plan, make the
payment and do every major work in the project as per the schedule.
Sub contractors are hired by the general contractors; they follow the orders of
the general contractors. They have been divided into the different fields and the
departments. Sub contractor get paid by the general contractor.
7
ASSIGNMENT 1
QUESTION 6
Q. What are the three most commonly used types of project delivery methods?
Answer:
1. Design Bid Build Process: In this process, contractor bid as per his
estimation in which he/she try to set a lowest price. Then contractor get
the project and he/she has to complete it before the end date.
2. Design Build Process: In this process, contractor and consultant agree
upon a one price after the negotiation. So during the work contractor will
be paid as per negotiation price. There is no place of the bid in this
process.
3. Construction Manager: Construction manager is hired by the owner. This
kind of the method is used when project is very big. Construction manager
checks the project work and estimation.
8
ASSIGNMENT 1
QUESTION 7
Answer:
QUESTION 8
Answer:
shop drawing carries the information of the fabrication and installation of the
items. These kind of the details are suggested by the builder that is checked by
the contractor and architectures for the final confirmation.
10
ASSIGNMENT 1
QUESTION 9
Answer:
Punch list shows the major and minor activities. Major activities like piling,
column casting; and fabrication, plastering are the minor activities.
11
ASSIGNMENT 1
QUESTION 10
Answer:
1. Provide the guidelines for the signals, signs, barricade required on site.
2. Provide safety to the workers by giving them personal protective and life-
saving equipment.
3. Providing guidelines to use equipments and quality tools.
4. Providing guidelines about how to handle the material and method for
usages.
5. Ensure that workers are following the safety guides.
12
ASSIGNMENT 1
QUESTION 11
Q. What are material data sheets?
Answer:
Material data sheets contain the detailed explanation of the equipments and their
hazards, because in the construction industry there are lots of the heavy
machineries, hard tools and equipments that might cause risk. So for the safety
of the workers material data can guide and warn workers before worker use any
kind of the machinery.