Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 13

1

ASSIGNMENT 1

LAMBTON COLLEGE, TORONTO

TABLE OF CONTEXT

QUESTION 1……………………………………………………………………………………..3

QUESTION 2……………………………………………………………………………………..4

QUESTION 3……………………………………………………………………………………..5

QUESTION 4……………………………………………………………………………………..6

QUESTION 5……………………………………………………………………………………..7

QUESTION 6……………………………………………………………………………………...8

QUESTION 7……………………………………………………………………………………..9

QUESTION 8…………………………………………………………………………………….10

QUESTION 9…………………………………………………………………………………….11

QUESTION 10…………………………………………………………………………………...12

QUESTION 11…………………………………………………………………………………...13
2
ASSIGNMENT 1

QUESTION 1

Q. What are three major divisions in construction industry?

Answer:

The three major divisions are:

1. Building Construction: Building construction includes residential,


commercial, institutional buildings. Work might be a renovation, repair.
These kind of buildings are made from the wood or concrete.
2. Infrastructure Construction: infrastructure type of the construction are
mostly made for the public usage with help of the public funds, highway,
bridges, sewerage such kind of the heavy construction are included in
infrastructure Construction.
3. Industrial Construction: big ware houses and distribution centres are the
example of the industrial Construction. These kind of the construction put
3
ASSIGNMENT 1
big input in the economy of the any country. They are very big in the size
and generally funded by the industrial or governmental organizations.

QUESTION 2

Q. What professionals are responsible for the preparation of construction


documents?

Answer:

The preparation of development document is generally done at the last phase of


the plan. The design expert and architecture are the one who complete this
process. However, sometimes contractor and sub contractor also participate in
the process.
4
ASSIGNMENT 1

QUESTION 3

Q. What is the difference between construction drawing and specification?

Answer:

Construction drawing convey the information of the location, design,


dimensions, and structure detail of the project. This drawing can be a useful for
the contractor to make estimate.

Specification means a kind of the information that cannot be explained in the


drawing so that information is written in the word form, for example procedures,
characteristics and quality of materials used for construction, construction
methods.
5
ASSIGNMENT 1

QUESTION 4

Q. How does the master format help all participants in the industry
communicate?
Answer:

Master format can be a helpful for the communication during construction of the
project which have all the information of the site and that is divided into the 50
total groups, 34 out of 50 are active and remaining 14 are inactive. Remaining
14 groups can be used during the future expansion. Every division has an
identification number that details can be a helpful during the construction.
6
ASSIGNMENT 1

QUESTION 5

Q. What is the difference between general contractors and subcontractors?

Answer:

General contractors are placed at the top level in construction project. They
directly assign the work for the sub contractor. They analyze the plan, make the
payment and do every major work in the project as per the schedule.

Sub contractors are hired by the general contractors; they follow the orders of
the general contractors. They have been divided into the different fields and the
departments. Sub contractor get paid by the general contractor.
7
ASSIGNMENT 1

QUESTION 6

Q. What are the three most commonly used types of project delivery methods?

Answer:

1. Design Bid Build Process: In this process, contractor bid as per his
estimation in which he/she try to set a lowest price. Then contractor get
the project and he/she has to complete it before the end date.
2. Design Build Process: In this process, contractor and consultant agree
upon a one price after the negotiation. So during the work contractor will
be paid as per negotiation price. There is no place of the bid in this
process.
3. Construction Manager: Construction manager is hired by the owner. This
kind of the method is used when project is very big. Construction manager
checks the project work and estimation.
8
ASSIGNMENT 1

QUESTION 7

Q. How are contractors selected to work on a construction project?

Answer:

There are 3 methods for contract selection:

1. Competitive bidding: In this bidding process, there are many contractors


try to get the project and they bid for the one project. Owner select the
one contractor who has set a lowest bid because owner has multiple choice
to select one contractor. In this kind of the process, normally, there is a
huge competition.
2. Invitational bidding: This bidding process is almost similar to the
competitive bidding, only difference is contractors are invited by the
owner, and they are the only who can submit their bid.
9
ASSIGNMENT 1
3. Negotiated bidding: Selected contractor and owner agree upon one price
for the project work. Contractor will be paid as per the negotiated price.

QUESTION 8

Q. What is the purpose of a shop drawing?

Answer:

shop drawing carries the information of the fabrication and installation of the
items. These kind of the details are suggested by the builder that is checked by
the contractor and architectures for the final confirmation.
10
ASSIGNMENT 1

QUESTION 9

Q. When is a punch list generated and what does it contain?

Answer:

Punch list shows the major and minor activities. Major activities like piling,
column casting; and fabrication, plastering are the minor activities.
11
ASSIGNMENT 1

QUESTION 10

Q What purposes are served by OSHA?

Answer:

The purposes include:

1. Provide the guidelines for the signals, signs, barricade required on site.
2. Provide safety to the workers by giving them personal protective and life-
saving equipment.
3. Providing guidelines to use equipments and quality tools.
4. Providing guidelines about how to handle the material and method for
usages.
5. Ensure that workers are following the safety guides.
12
ASSIGNMENT 1

QUESTION 11
Q. What are material data sheets?

Answer:

Material data sheets contain the detailed explanation of the equipments and their
hazards, because in the construction industry there are lots of the heavy
machineries, hard tools and equipments that might cause risk. So for the safety
of the workers material data can guide and warn workers before worker use any
kind of the machinery.