DHAMRA LNG TERMINAL PVT. LTD.

(DLTPL)
Adani House, Nr Mithakhali Circle, Navrangpura, Ahmedabad 380 009, Gujarat, India
Tel +91-79-25555801; Fax + 91-79-2555 6490; www.adani.com

LNG Import, Storage and Regasification Terminal Project


PROJECT
LNG Regas Facilities Package

DOCUMENT NAME Foundation Calculation Sheet for BOG RECONDENSER (210-V-01)

PMC

EPCC CONTRACTOR

EPCC CONTRACTOR
18E3500B
PROJECT NO.:

EPCC CONTRACTOR
XF36-A300-072
DOCUMENT NO.:

DLTPL DOCUMENT NO.: 2340-E-RGF-DRS-DC-C-E-072 Rev. C

PREPARED CHECKED APPROVED


REV. NO. DATE DESCRIPTION
Init. Sign Init. Sign Init. Sign

C 29/10/2019 Issued For Review TUAN DORA LOOMBA

B 25/09/2019 Issued For Review TUAN TUAN DORA DORA LOOMBA LOOMBA

A 07/06/2019 Issued For Review ROHIT ROHIT ARGHYA ARGHYA LOOMBA LOOMBA

This Document is the property of DLTPL. It should not be used, copied or reproduced without their written permission.
CONTENTS
Page
1.0 SCOPE & GENERAL DESCRIPTION 3
2.0 GENERAL DESCRIPTION / DESIGN PHILOSOPHY OF STRUCTURES:- 3
2.1 APPLICABLE SOFTWARE: 3
2.2 STRUCTURE TYPE 3
2.3 STRUCTURAL SYSTEM 3
2.4 FOUNDATION TYPE 3
3.0 DESIGN CRITERIA 4
3.1 DESIGN CODES & STANDARDS 4
3.2 MATERIALS 4
3.3 PILE CAPACITY 4
4.0 OUTLINE OF THE STRUCTURE 5
5.0 LOAD 6
5.1 LOAD CASES DEFINATION 6
5.2 DEAD LOAD 6
5.3 EQUIPMENT EMPTY / OPERATING / TESTING LOAD 6
5.4 SEISMIC LOAD 6
5.5 WIND LOAD 8
5.6 LOAD COMBINATION 10
6.0 FOUNDATION DESIGN 12
6.1 FOUNDATION DESIGN RESULT 12
6.2 CRACK WIDTH CHECK OF THE PEDESTAL FOR UNFACTORED MOMENT 23
6.3 ANCHORAGE FAILURE MODES CHECK 24
ATTACHMENT-1 VENDOR DRAWING
ATTACHMENT-2 OUTPUT DRAWING
ATTACHMENT-3 PILING DATA

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 2 REV. C
1.0 SCOPE & GENERAL DESCRIPTION

SCOPE
ADLTPL (Adani Dhamra LNG Terminal Private Limited) intends to set up a LNG regasification terminal
at Dharma, Odisha, India. The terminal capacity shall be 5 MMTPA with all necessary provision to 10
MMTPA in future.

2.0 GENERAL DESCRIPTION / DESIGN PHILOSOPHY OF STRUCTURES:-

BOG Re-condenser(210-V-01) is a vertical vessel with vaariable diameters. It is situated in Area-300 between BOG
area and HP pump house near to pipe rack-04. Hieght of the vessel is 18.95 m supported on piles.

2.1 APPLICABLE SOFTWARE:

■ Vertical Vessel Foundation Design (Ver 5.3.10)

2.2 STRUCTURE TYPE

■ RC STRUCTURE

□ STEEL STRUCTURE

□ STEEL+RC STRUCTURE

2.3 STRUCTURAL SYSTEM

BOG Re-condenser is placed on a octagon block foundation support on plies.

2.4 FOUNDATION TYPE


□ ON SOIL ■ ON PILE

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 3 REV. C
3.0 DESIGN CRITERIA

3.1 DESIGN CODES & STANDARDS

▪ Dead Loads IS 875 (Part 1) : 1987


▪ Live Loads IS 875 (Part 2) : 1987
▪ Wind Load IS-875 (Part-3) : 2015
▪ Seismic Load
Industrial Structures including Stack-like Structures IS 1893 (Part 4) : 2015
▪ RCC Design IS 456 : 2000
▪ Steel Design IS 800 : 2007

3.2 MATERIALS

3.2.1 Concrete

RCC foundation and structures M30


Lean Concrete M15

3.2.2 Reinforcing Steel Bars

High Strength Deformed (TMT) Steel bars of grade Fe 500D, confirming to IS: 1786 shall be used.

3.2.3 Anchor Bolt

The material of anchor bolts shall be IS:2062 E250 Grade A for general services.

3.3 PILE CAPACITY

Allowable Lateral Capacity


Allowable Allowable
Pile Pile
Compression Tension
Pile Type Diameter Length Free Head Fixed Head
Capacity Capacity
(mm) (m) Lateral Maximum Lateral Maximum
(tons) (tons)
Capacity Moment Capacity Moment
(tons) (ton-m) (tons) (ton-m)

PC Pile 600 50 106 70 5.95 8.71 15.36 26.93

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 4 REV. C
4.0 OUTLINE OF THE STRUCTURE

The BOG Re-condenser is supported on octagon block foundation with piles. The foundation are analyzed
and the designs are attached later in this design document

. 3D View of the Construction/Layout

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 5 REV. C
5.0 LOAD

5.1 LOAD CASES DEFINATION

1) DEAD LOAD

2) EQUIPMENT EMPTY

3) EQUIPMENT OPERATING

4) EQUIPMENT TESTING

5) SEISMIC LOAD +X

6) SEISMIC LOAD +Z

7) WIND LOAD +X

8) WIND LOAD +Z

5.2 DEAD LOAD

RCC Unit Weight : 25 KN/m3 (As per 2340-E-RGF-GEN-DC-S-E-001_R0, CL-5.1.1)


Pedestal diameter L= 7.000 m
Pedestal height H= 1.000 m

40.592 3
Volume= m
Pedestal weight= 1015 KN

5.3 EQUIPMENT EMPTY / OPERATING / TESTING LOAD

(As per EPCC Contractor document No. 18P3500B-F0001-EQ-0001)


KG KN including all fixtures(KN)
EMPTY WEIGHT 121285 1189.8 1524.8
OPERATING WEIGHT 306085 3002.7 3337.7
HYDROTEST WEIGHT(AT FIELD) 393797 3863.1 4198.2

5.4 SEISMIC LOAD

EARTHQUAKE LOAD CALCULATION AS PER IS 1893


(As per EPCC Contractor document No. 18P3500B-F0001-EQ-0001)
Equipement C.O.G to top of foundation ,h = 8.065 m

VESSEL TYPE
1) Horizontal Vessel Support □
2) Verical Vessel Support ■

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 6 REV. C
TIME PERIOD (T)
The fundamental time period
for stack like structures,
T' is given by T = Ct*√{(Wt*h)/(Es*A*g)} (REF:IS1893:2015(PART 4), 14.1)
Ct = 19.6 coefficient depending upon the slenderness ratio of the structure,
(REF:IS1893:2015(PART 4), Table 7)
Wt = 3002.7 KN equipment operating weight
h = 18.9 m height of structure above the base
2
Es = 200000000 KN/m elasticity modulus of material
A = 570765 mm2 area of cross-section at the base of the structural shell
2
g = 9.8 m/s acceleration due to gravity
T = Ct*√{(Wt*h)/(Es*A*g)}
= 0.1396 Sec
Time period in X - dir = 0.1396 Sec
Time period in Z - dir = 0.1396 Sec

SPECTRAL ACCELERATION COEFFICIENT (Sa/g)

For Medium soil Site Sa = 1+ 15T 0 ≤ T ≤ 0.1


g = 2.5 0.1 ≤ T ≤ 0.55
= 1.36/T 0.55 ≤ T ≤ 10
(REF:IS 1893 part 4 :2015,Pg 21)

Therefore,
Spectral acceleration coefficient in X -dir = 2.5
Spectral acceleration coefficient in Z -dir = 2.5

RESPONSE REDUCTION FACTOR (R)


Steel refinery vessels = 2 (REF:IS 1893 :2015(PART 4), Table 10)

ZONE FACTOR FOR DHAMRA


DHAMRA comes under Zone III Z = 0.16

IMPORTANCE FACTOR FOR VARIOUS STRUCTURES


Importance Factor = 1.5 (REF:IS 1893 :2015(PART 4), Table 9)

CALCULATION OF SEISMIC COEFFICIENT ( Ah )

Design Horizontal Seismic Coefficient


Ah, = Z x I x Sa
2xRxg
= 0.16 x 1.5 x 2.5
2x2
= 0.15
Therefore,
01) Seismic Coefficient (Ahx) in X - dir , = 0.15
02) Seismic Coefficient (Ahz) in Z - dir , = 0.15

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 7 REV. C
CALCULATION FOR DESIGN SEISMIC Force at Equipment C.O.G.
Design Seismic force VB = Ah x W
Ah = Design horizontal acceleration spectrum values
W = Equipment Operating Weight

VBx = 450.40 KN
VBz = 450.40 KN

Total moment caused by seismic on Top of pedestal = 3632.51 KN-m

(As per EPCC Contractor document No. 18P3500B-F0001-EQ-0001)


SEISMIC SHEAR FORCE 65549 kgf = 643.04 KN
SEISMIC MOMNET 536434 kgf-m = 5262.42 KN-m

Use the above force to design pedestal & piles

5.5 WIND LOAD

Location: Dhamra
Vb: 55
Category 1

Vb - Basic wind speed


K1 - Probabilty factor
K2 - terrain, height and structure size factor
K3 - topography factor
K4 - Importance factor for cyclonic region

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 8 REV. C
K1 1 IS 875 (Part 3) :2015
K2 1.05 (H <10) IS 875 (Part 3) :2015
K2 1.09 (H <15)
K2 1.12 (H <20)
K3 1 IS 875 (Part 3) :2015
K4 1.15 AS PER 4.8 OF ITB (Doc No.-2351-E-EPC-GEN-BC-N-E-001 )

Height below 10m


Design of wind speed Vz = Vb X K1 X K2 X K3 X K4 = 66.41 m/s
2
Basic Wind Pressure, Pz = 0.6 X Vz = 2646.37 N/mm2
2
Design wind pressure,Pd = 2646.37 N/mm = 2.65 kN/m2

Height from 10m to 15m


Design of wind speed Vz = Vb X K1 X K2 X K3 X K4 = 68.94 m/s
Basic Wind Pressure, Pz = 0.6 X Vz2 = 2851.84 N/mm2
Design wind pressure,Pd = 2851.84 N/mm2 = 2.85 kN/m2

Height from 15m to 20m


Design of wind speed Vz = Vb X K1 X K2 X K3 X K4 = 70.84 m/s
2
Basic Wind Pressure, Pz = 0.6 X Vz = 3010.98 N/mm2
Design wind pressure,Pd = 3010.98 N/mm2 = 3.01 kN/m2

Ka 1 area averaging factor As per clause 7.2.2 of IS 875 (part-3) - 2015


Kc 1 Combination factor As per clause 7.3.3.13 of IS 875 (part-3) - 2015
Kd 1 Wind directionality factor As per clause 7.2.1 of IS 875 (part-3) - 2015

Design wind pressure height below 10m , Pd = P z x Ka x Kc x Kd = 2.650 kN/m2


Design wind pressure height from 10m to 15m ,Pd = P z x Ka x Kc x Kd = 2.850 kN/m2
Design wind pressure height from 15m to 20m ,Pd = P z x Ka x Kc x Kd = 3.010 kN/m2
As per clause 7.2 of IS 875 (part-3) - 2015

Windward Area
2
Width(m) Height(m) Area(m )
Height below 10m 6.546 9.8 64.151
Height from 10m to 15m 6.086 3.12 18.988
Height from 15m to 20m 3.506 5.98 20.966

Wind force F= Cf x Ae x Pd
Height below 10m
2
pd = Design wind pressure = 2.65 kN/m
2
Ae = Effective frontal Area = 64.151 m
Cf = force coefficient = 0.7

Height from 10m to 15m


pd = Design wind pressure = 2.85 kN/m2

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 9 REV. C
Ae = Effective frontal Area = 18.988 m2
Cf = Frictional drag coefficient = 0.7

Height from 15m to 20m


2
pd = Design wind pressure = 3.01 kN/m
2
Ae = Effective frontal Area = 20.966 m
Cf = Frictional drag coefficient = 0.7

the surface area of the equipment(vessel/column) exposed to wind shall be increased by 20%
(As per 2340-E-RGF-GEN-DC-S-E-001_R0, CL-5.1.5)
2
Ae1 = Effective windward Area (Height below 10m) = 76.981 m
2
Ae2 = Effective windward Area (Height from 10m to 15m) = 22.786 m
2
Ae3 = Effective windward Area (Height from 15m to 20m) = 25.159 m

Wind action poistion of BOG Recondenser (Height below 10m) H= 4.9 m


Wind action poistion of BOG Recondenser (Height from 10m to 15m) H= 11.36 m
Wind action poistion of BOG Recondenser (Height form 15m to 20m) H= 15.52 m

Total shear force caused by wind on Top of pedestal = 241.27 kN


Total moment caused by wind on Top of pedestal = 2038.8 KN-m

5.6 LOAD COMBINATION

1 Load_Comb_101
1.00*DL + 1.00*EE
2 Load_Comb_102
1.00*DL + 1.00*EE + 1.00*WL
3 Load_Comb_103
1.00*DL + 1.00*EO
4 Load_Comb_104
1.00*DL + 1.00*EO + 1.00*WL
5 Load_Comb_105
1.00*DL + 1.00*EO + 1.00*SL
6 Load_Comb_106
1.00*DL + 1.00*ET
7 Load_Comb_107
1.00*DL + 1.00*ET + 0.25*WL
8 Load_Comb_201
1.50*DL + 1.50*EE
9 Load_Comb_202
1.50*DL + 1.50*EE + 1.50*WL
10 Load_Comb_203
0.90*DL + 0.90*EE + 1.50*WL
11 Load_Comb_204
1.50*DL + 1.50*EO
12 Load_Comb_205
1.50*DL + 1.50*EO + 1.50*WL

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 10 REV. C
13 Load_Comb_206
1.50*DL + 1.50*EO + 1.50*SL
14 Load_Comb_207
0.90*DL + 0.90*EO + 1.50*WL
15 Load_Comb_208
0.90*DL + 0.90*EO + 1.50*SL
16 Load_Comb_209
1.50*DL + 1.50*ET
17 Load_Comb_210
1.50*DL + 1.50*ET + 0.38*WL
18 Load_Comb_211
0.90*DL + 0.90*ET + 0.38*WL

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 11 REV. C
6.0 FOUNDATION DESIGN

Design Summary of Pile


Maximum Ratio of Piles
Load Combination
Comp. Tension Shear
Load_Comb_101 0.231 0 0
Load_Comb_102 0.421 0 0.307
Load_Comb_103 0.449 0 0
Load_Comb_104 0.638 0 0.307
Load_Comb_105 0.939 0.067 0.819
Load_Comb_106 0.553 0 0
Load_Comb_107 0.6 0 0.077

Design Summary of Pedestal


Size Reinforcement
(Oct. mm x mm) Main bar Stirrups Top bar bottom bar
7000 x 1000 200-20ψ 16ψ Tie Set @ 300mm c/c 12ψ @ 250 mm c/c16ψ @ 200 mm c/c

Using horizontal bar at top of pedestal : 12φ @ 250 mm c/c 2-way


Using horizontal bar at bottom of pedestal : 16φ @ 200 mm c/c 2-way

Design Summary of Anchor Bolt


Maximum Ratio of
Load Combination
Anchor Bolt
Load_Comb_201 0.000
Load_Comb_202 0.022
Load_Comb_203 0.073
Load_Comb_204 0.000
Load_Comb_205 0.020
Load_Comb_206 0.162
Load_Comb_207 0.020
Load_Comb_208 0.511
Load_Comb_209 0.000
Load_Comb_210 0.001
Load_Comb_211 0.001

6.1 FOUNDATION DESIGN RESULT

VERTICAL EQUIPMENT FOUNDATION DESIGN (IS Code)

CONTENT

1. DESIGN DATA ---

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 12 REV. C
2. FOUNDATION SIZE ---

3. LOADING DATA ---

4. ANCHOR BOLT CAPACITY CHECK ---

5. BUOYANCY CHECK ---

6. PILE CAPACITY CHECK ---

7. PEDESTAL DESIGN ---

1. DESIGN DATA

1.1 General Data

Project Name = 18E3500A


Plant Name = ADANI
Equipment Name = 210-V-01
Shape of Pedestal = Oct
Support Type of Pedestal = OnPile
Concrete
Pedestal = M30 (f_ck=30.0 N/mm2)
Rebar
Pedestal Main bar = Fe 500 grade (fy=500.0 N/mm2)
Tie bar = Fe 500 grade (fy=500.0 N/mm2)
Unit Wt.
Concrete = 25.0 kN/m3
Soil = 18.0 kN/m3
Ground Water = 9.8 kN/m3
El.
Ground = 0.000 m
Ground Water = 0.000 m

1.2 Equipment Data

Section 1
Height 18.900 m
Inside Diameter 6.000 m
Wall Thickness 43.000 mm
Insulation Thickness 230.000 mm
Projected Area 123.719 m2
Empty Weight 1189.800 kN
Operation Weight 3002.700 kN

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 13 REV. C
Test Weight 3863.100 kN
Centroid 8.065 m

1.3 Anchor Bolt Data

Type = Type 3
Size = M45
Quantity = 12
Nut Number = 2
Material = E250
W/O Sleeve = No
Diameter = 45.0 mm
B.C.D = 6.226 m
Min. Edge = 150.0 mm
Length = 1255.0 mm
Grip Len. = 300.0 mm
Grout Thk. = 25.0 mm
Projection = 444.5 mm
Proj.(Use) = 445.0 mm

2. FOUNDATION SIZE

2.1 Pedestal Data

Size :
Flat-dir = 7.000 m
Dgnl-dir = 7.577 m
Height = 1.000 m
Height above ground = 0.300 m
Eq. Width = 6.371 m
Cover = 75.0 mm
Main Bar : 20φ
Diameter = 20.0 mm
Area = 314.3 mm2
Tie bar : 16φ
Diameter = 16.0 mm
Area = 201.2 mm2
Elevation of T.O.P = 0.300 m

3. LOADING DATA

3.1 Load name definition(User)

Empty Wt. Operation Wt. Test Wt. Hor. Wind Hor. Wind(Test)
EE EO ET WL WL

Hor. Seismic Hor. Seismic Self Wt Soil Wt.


(Operation) (Test) (Include G.W.)
SL SL DL DLs

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 14 REV. C
3.2 Load combination name definition

Definition Status

Service+LongTerm SLS

Service+ShortTerm SLS

Collapse+LongTerm CLS

Collapse+ShortTerm CLS

3.3 Load combination definition

Com. Name Work Status Com. Definition Over/Slide/Buoy(OSF)


+ Com. Content
1 Load_Comb_101 Empty Service+LongTerm No
1.00*DL + 1.00*EE
2 Load_Comb_102 Empty Service+ShortTerm No
1.00*DL + 1.00*EE + 1.00*WL
3 Load_Comb_103 Operation Service+LongTerm No
1.00*DL + 1.00*EO
4 Load_Comb_104 Operation Service+ShortTerm No
1.00*DL + 1.00*EO + 1.00*WL
5 Load_Comb_105 Operation Service+ShortTerm No
1.00*DL + 1.00*EO + 1.00*SL
6 Load_Comb_106 Test Service+LongTerm No
1.00*DL + 1.00*ET
7 Load_Comb_107 Test Service+ShortTerm No
1.00*DL + 1.00*ET + 0.25*WL
8 Load_Comb_201 Empty Collapse+LongTerm No
1.50*DL + 1.50*EE
9 Load_Comb_202 Empty Collapse+ShortTerm No
1.50*DL + 1.50*EE + 1.50*WL
10 Load_Comb_203 Empty Collapse+ShortTerm No
0.90*DL + 0.90*EE + 1.50*WL
11 Load_Comb_204 Operation Collapse+LongTerm No
1.50*DL + 1.50*EO
12 Load_Comb_205 Operation Collapse+ShortTerm No
1.50*DL + 1.50*EO + 1.50*WL
13 Load_Comb_206 Operation Collapse+ShortTerm No
1.50*DL + 1.50*EO + 1.50*SL
14 Load_Comb_207 Operation Collapse+ShortTerm No
0.90*DL + 0.90*EO + 1.50*WL
15 Load_Comb_208 Operation Collapse+ShortTerm No
0.90*DL + 0.90*EO + 1.50*SL
16 Load_Comb_209 Test Collapse+LongTerm No

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 15 REV. C
1.50*DL + 1.50*ET
17 Load_Comb_210 Test Collapse+ShortTerm No
1.50*DL + 1.50*ET + 0.38*WL
18 Load_Comb_211 Test Collapse+ShortTerm No
0.90*DL + 0.90*ET + 0.38*WL

3.4 Loading value for each load name

At Bottom of Vessel(Equipment)

User Define
WL WL SL SL
H(kN ) 241.270 241.270 643.000 643.000
M(kN-m ) 2038.800 2038.800 5262.000 5262.000

Result
EE EO ET WL WL SL SL
H(kN ) 0.000 0.000 0.000 241.270 241.270 643.000 643.000
V(kN ) 1189.800 3002.700 3863.100 0.000 0.000 0.000 0.000
M(kN-m ) 0.000 0.000 0.000 2038.800 2038.800 5262.000 5262.000

At Bottom of Pedestal

DL DLs EE EO ET WL WL SL SL
H(kN ) 0.000 0.000 0.000 0.000 0.000 241.270 241.270 643.000 643.000
V(kN ) 1014.823 -278.752 1189.800 3002.700 3863.100 0.000 0.000 0.000 0.000
M(kN-m ) 0.000 0.000 0.000 0.000 0.000 2280.070 2280.070 5905.000 5905.000

3.5 Loading Combination for each Object

Anchor Bolt Check(Equipment)

Com. Name Work State Com. Definition OSF H(kN) V(kN) M(kN-m)
+ Com. Content
1 Load_Comb_201 Empty Collapse+LongTerm No 0.000 1784.700 0.000
1.50*DL + 1.50*EE
2 Load_Comb_202 Empty Collapse+ShortTerm No 361.905 1784.700 3058.200
1.50*DL + 1.50*EE + 1.50*WL
3 Load_Comb_203 Empty Collapse+ShortTerm No 361.905 1070.820 3058.200
0.90*DL + 0.90*EE + 1.50*WL
4 Load_Comb_204 Operation Collapse+LongTerm No 0.000 4504.050 0.000
1.50*DL + 1.50*EO
5 Load_Comb_205 Operation Collapse+ShortTerm No 361.905 4504.050 3058.200
1.50*DL + 1.50*EO + 1.50*WL
6 Load_Comb_206 Operation Collapse+ShortTerm No 964.500 4504.050 7893.000
1.50*DL + 1.50*EO + 1.50*SL
7 Load_Comb_207 Operation Collapse+ShortTerm No 361.905 2702.430 3058.200
0.90*DL + 0.90*EO + 1.50*WL
8 Load_Comb_208 Operation Collapse+ShortTerm No 964.500 2702.430 7893.000

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 16 REV. C
0.90*DL + 0.90*EO + 1.50*SL
9 Load_Comb_209 Test Collapse+LongTerm No 0.000 5794.650 0.000
1.50*DL + 1.50*ET
10 Load_Comb_210 Test Collapse+ShortTerm No 90.476 5794.650 764.550
1.50*DL + 1.50*ET + 0.38*WL
11 Load_Comb_211 Test Collapse+ShortTerm No 90.476 3476.790 764.550
0.90*DL + 0.90*ET + 0.38*WL

Pedestal Design

Com. Name Work State Com. Definition OSF H(kN) V(kN) M(kN-m)
+ Com. Content
1 Load_Comb_201 Empty Collapse+LongTerm No 0.000 2888.807 0.000
1.50*DL + 1.50*EE
2 Load_Comb_202 Empty Collapse+ShortTerm No 361.905 2888.807 3420.105
1.50*DL + 1.50*EE + 1.50*WL
3 Load_Comb_203 Empty Collapse+ShortTerm No 361.905 1733.284 3420.105
0.90*DL + 0.90*EE + 1.50*WL
4 Load_Comb_204 Operation Collapse+LongTerm No 0.000 5608.157 0.000
1.50*DL + 1.50*EO
5 Load_Comb_205 Operation Collapse+ShortTerm No 361.905 5608.157 3420.105
1.50*DL + 1.50*EO + 1.50*WL
6 Load_Comb_206 Operation Collapse+ShortTerm No 964.500 5608.157 8857.500
1.50*DL + 1.50*EO + 1.50*SL
7 Load_Comb_207 Operation Collapse+ShortTerm No 361.905 3364.894 3420.105
0.90*DL + 0.90*EO + 1.50*WL
8 Load_Comb_208 Operation Collapse+ShortTerm No 964.500 3364.894 8857.500
0.90*DL + 0.90*EO + 1.50*SL
9 Load_Comb_209 Test Collapse+LongTerm No 0.000 6898.757 0.000
1.50*DL + 1.50*ET
10 Load_Comb_210 Test Collapse+ShortTerm No 90.476 6898.757 855.026
1.50*DL + 1.50*ET + 0.38*WL
11 Load_Comb_211 Test Collapse+ShortTerm No 90.476 4139.254 855.026
0.90*DL + 0.90*ET + 0.38*WL

Pile Capacity

Com. Name Work State Com. Definition OSF H(kN) V(kN) M(kN-m)
+ Com. Content
1 Load_Comb_101 Empty Service+LongTerm No 0.000 1925.872 0.000
1.00*DL + 1.00*EE
2 Load_Comb_102 Empty Service+ShortTerm No 241.270 1925.872 2280.070
1.00*DL + 1.00*EE + 1.00*WL
3 Load_Comb_103 Operation Service+LongTerm No 0.000 3738.772 0.000
1.00*DL + 1.00*EO
4 Load_Comb_104 Operation Service+ShortTerm No 241.270 3738.772 2280.070
1.00*DL + 1.00*EO + 1.00*WL
5 Load_Comb_105 Operation Service+ShortTerm No 643.000 3738.772 5905.000
1.00*DL + 1.00*EO + 1.00*SL

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 17 REV. C
6 Load_Comb_106 Test Service+LongTerm No 0.000 4599.172 0.000
1.00*DL + 1.00*ET
7 Load_Comb_107 Test Service+ShortTerm No 60.318 4599.172 570.018
1.00*DL + 1.00*ET + 0.25*WL

4. ANCHOR BOLT CAPACITY CHECK

4.1 Anchor Bolt Capacity check for each case

Load at Bottom of Vessel


P : Vertical load
H : Horizontal load
M : Moment

Tu : Anchor Tension Force = 4*Mu/(N*BCD) - Pu/N


Vu : Anchor Shear Force = Hu/N
B.C.D : Anchor Bolt Circle Diameter = 6.226 m
N : Number of Anchor Bolt = 12
Tn : Anchor Bolt Tension Capacity = 324.250 kN
Vn : Anchor Bolt Shear Capacity = 214.170 kN

The following conditions should be met:


Tu <= Tn
Vu <= Vn
Ratio = (Tu/Tn)^2.0 + (Vu/Vn)^2.0 <= 1.00 (IS 800:2007 Clause 10.3.6)

Name Hu(kN) Pu(kN) Mu(kN-m) Tu(kN) Tn(kN) Vu(kN) Vn(kN) Ratio


1 Load_Comb_201 0.000 1784.700 0.000 0.000 324.250 0.000 214.170 0.000 OK
2 Load_Comb_202 361.905 1784.700 3058.200 15.008 324.250 30.159 214.170 0.022 OK
3 Load_Comb_203 361.905 1070.820 3058.200 74.498 324.250 30.159 214.170 0.073 OK
4 Load_Comb_204 0.000 4504.050 0.000 0.000 324.250 0.000 214.170 0.000 OK
5 Load_Comb_205 361.905 4504.050 3058.200 0.000 324.250 30.159 214.170 0.020 OK
6 Load_Comb_206 964.500 4504.050 7893.000 47.245 324.250 80.375 214.170 0.162 OK
7 Load_Comb_207 361.905 2702.430 3058.200 0.000 324.250 30.159 214.170 0.020 OK
8 Load_Comb_208 964.500 2702.430 7893.000 197.380 324.250 80.375 214.170 0.511 OK
9 Load_Comb_209 0.000 5794.650 0.000 0.000 324.250 0.000 214.170 0.000 OK
10 Load_Comb_210 90.476 5794.650 764.550 0.000 324.250 7.540 214.170 0.001 OK
11 Load_Comb_211 90.476 3476.790 764.550 0.000 324.250 7.540 214.170 0.001 OK

5. BUOYANCY CHECK

5.1 Given data

V : Vertical load
H : Horizontal load
M : Moment
All load apply at bottom of pedestal

Name V(kN) H(kN) M(kN-m)

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 18 REV. C
1 Load_Comb_101 2204.623 0.000 0.000
2 Load_Comb_102 2204.623 241.270 2280.070
3 Load_Comb_103 4017.523 0.000 0.000
4 Load_Comb_104 4017.523 241.270 2280.070
5 Load_Comb_105 4017.523 643.000 5905.000
6 Load_Comb_106 4877.923 0.000 0.000
7 Load_Comb_107 4877.923 60.318 570.018

5.2 Solution

BR : Buoyancy Ratio(= Resistant load / Buoyancy force)


Resistant load = External load + Pedestal wt.
(Neglect the summation of all piles allowable tension capacity)
Minimum BR = 1.500

Find min. resistant(downward) load = 1014.79 kN (Pedestal self weight)


Buoyancy(upward) force = 278.752 kN

BR = 3.640 > 1.500 OK

6. PILE CAPACITY CHECK

6.1 Pile Properties

Name = PC600
Diameter = 600.0 mm
Length = 50.000 m
Pile arrangement = Circle

Total Number of pile circle = 1


Circle 1
Number = 8
Radius = 2.900 m
Angle w/ 12 clock = 0.0 Degree

Long term capacity


Allow. down load = 1039.900 kN
Allow. uplift load = 686.700 kN
Allow. shear load = 98.100 kN

Short term capacity


Allow. down load = 1039.900 kN
Allow. uplift load = 686.700 kN
Allow. shear load = 98.100 kN

6.2 Pile spacing and side clearance


Spacing check by IS 2911(Part I/Sec 1):1979 5.6.2
Project DB(ITB)
Side clearance check by IS 2911(Part I/Sec 1):1979 5.12.5 = 150 mm

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 19 REV. C
Project DB(ITB)

Pt : No of Pile
X : X coordinate of Pile
Y : Y coordinate of Pile
Spc : Pile Spacing
Spc_min : Allowable Pile Spacing = 1.800 m
Ratio = Spc/Spc_min

Circle 1
Pt X(m) Y(m) Spc(m) Ratio
1 0.000 2.900 2.220 1.233 OK
2 2.051 2.051 2.220 1.233 OK
3 2.900 0.000 2.220 1.233 OK
4 2.051 -2.051 2.220 1.233 OK
5 0.000 -2.900 2.220 1.233 OK
6 -2.051 -2.051 2.220 1.233 OK
7 -2.900 0.000 2.220 1.233 OK
8 -2.051 2.051 2.220 1.233 OK

Allowable clearance = Max(0.150, 0.300) = 0.300 m


The minimum clearance measured from the side of any pile to the edge of pedestal = 0.300 m OK

6.3 Pile Capacity check for each case

Load at bottom of Pedestal


V : Vertical load
H : Horizontal load
M : Moment

Total number of pile NTP = 8


Arrangement : Circle
Ir : Moment inertia of pile = 33640000.0 mm4
C : Max. pile distance = 2.900 m

Nmax (Pile down load) = V/NTP + (M x C/I).Ap


Ntmax(Pile uplift load) = V/NTP - (M x C/I).Ap
Nh (Pile shear load) = H/NTP
R (Allowable pile down load)
Rt (Allowable pile uplift load)
Rh (Allowable pile shear load)
RtoNmax = Nmax/R
RtoNtmax = Ntmax/Rt
RtoNh = Nh/Rh

Name V(kN) H(kN) M(kN-m)


Nmax(kN) Ntmax(kN) Nh(kN)
R(kN) Rt(kN) Rh(kN) RtoNmax RtoNtmax RtoNh
1 Load_Comb_101 1925.872 0.000 0.000

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 20 REV. C
240.734 0.000 0.000
1039.900 686.700 150.680 0.231 0.000 0.000 OK
2 Load_Comb_102 1925.872 241.270 2280.070
437.292 0.000 30.159
1039.900 686.700 150.680 0.421 0.000 0.200 OK
3 Load_Comb_103 3738.772 0.000 0.000
467.346 0.000 0.000
1039.900 686.700 150.680 0.449 0.000 0.000 OK
4 Load_Comb_104 3738.772 241.270 2280.070
663.904 0.000 30.159
1039.900 686.700 150.680 0.638 0.000 0.200 OK
5 Load_Comb_105 3738.772 643.000 5905.000
976.398 41.705 80.375
1039.900 686.700 150.680 0.939 0.061 0.533 OK
6 Load_Comb_106 4599.172 0.000 0.000
574.896 0.000 0.000
1039.900 686.700 150.680 0.553 0.000 0.000 OK
7 Load_Comb_107 4599.172 60.318 570.018
624.036 0.000 7.540
1039.900 686.700 150.680 0.600 0.000 0.050 OK

7. PEDESTAL DESIGN

7.1 Symbol

Gamma_ms : Partial safety factor for steel = 1.15


(IS 456:2000 36.4.2.1)
At top of pedestal
Vt : Vertical force
Ht : Horizontal force
Mt : Moment
Ast : Main bar required area
At bottom of pedestal
Vb : Vertical force
Hb : Horizontal force
Mb : Moment
Asb : Main bar required area

Rho_min : Minimum main bar ratio


Asv : Area of links at the top set
Sreq : Ties required spacing
Smax : Ties maximum spacing
RCD : Main rebar circle diameter

L : Width(Flat side)
c : Cover thickness
dt : Diameter of Ties
dm : Diameter of main bar
NB : Number of anchor bolt

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 21 REV. C
7.2 Formula in calculation of longitudinal and transverse reinforcement

RCD = L - 2 * (c + dt) - dm
Ast = (4 * Mt/RCD - Vt) / (fy/Gamma_ms)
Asb = (4 * Mb/RCD - Vb) / (fy/Gamma_ms)
Asv = (Ht/NB)/(f_yv/Gamma_ms)
Rho_min : Defined by IS 456:2000 26.5.3.1 c,g/Project File
Sreq : IS 456:2000 40.4
Smax : IS 456:2000 26.5.1.5

7.3 Pedestal design for each case

Gamma_ms : Partial safety factor(Steel) = 1.15


Gamma_mc : Partial safety factor(Concrete) = 1.50
(IS 456:2000 36.4.2.1)
dm = 20.0 mm
Am = 314.3 mm2
dt = 16.0 mm
At = 201.2 mm2
fy(Main bar) = 500.0 N/mm2
fy(Tie bar) = 500.0 N/mm2
fck = 30.0 N/mm2
RCD = 6798.0 mm

Name Vt(kN) Ht(kN) Mt(kN-m) Vb(kN) Hb(kN) Mb(kN-m)


Ast(mm2) Asb(mm2) Asv(mm2) Sreq(mm)
1 Load_Comb_201 1784.700 0.000 0.000 2888.807 0.000 0.000
0.000 0.000 0.000 ***
2 Load_Comb_202 1784.700 361.905 3058.200 2888.807 361.905 3420.105
33.972 0.000 69.365 ***
3 Load_Comb_203 1070.820 361.905 3058.200 1733.284 361.905 3420.105
1675.896 642.008 69.365 ***
4 Load_Comb_204 4504.050 0.000 0.000 5608.157 0.000 0.000
0.000 0.000 0.000 ***
5 Load_Comb_205 4504.050 361.905 3058.200 5608.157 361.905 3420.105
0.000 0.000 69.365 ***
6 Load_Comb_206 4504.050 964.500 7893.000 5608.157 964.500 8857.500
322.591 0.000 184.863 ***
7 Load_Comb_207 2702.430 361.905 3058.200 3364.894 361.905 3420.105
0.000 0.000 69.365 ***
8 Load_Comb_208 2702.430 964.500 7893.000 3364.894 964.500 8857.500
4466.317 4247.945 184.863 ***
9 Load_Comb_209 5794.650 0.000 0.000 6898.757 0.000 0.000
0.000 0.000 0.000 ***
10 Load_Comb_210 5794.650 90.476 764.550 6898.757 90.476 855.026
0.000 0.000 17.341 ***
11 Load_Comb_211 3476.790 90.476 764.550 4139.254 90.476 855.026
0.000 0.000 17.341 ***

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 22 REV. C
7.4 Pedestal design result

A) Main bar :

The minimum ratio of main bar = 0.0015


As(req) = 4466.317 mm2 (Load_Comb_208)
As(min) = 60889.394 mm2
As(use) = 60889.394 mm2
Final use : 200-20φ
Provide As = 62860.000 mm2

B) Ties :

Spacing(req) = *** (Load_Comb_201)


Spacing(max) = 300.0 mm
Spacing(use) = 300.0 mm
Final use : 16φ @ 300.0 mm

C) Area check for the top set of ties :

Asv(max) = 184.9 mm2 (Load_Comb_206)


Asv(Provide 1-16φ) = 201.2 mm2 >= Asv(max) OK

D) Additional bar :

Using horizontal bar at top of pedestal : 12φ @ 250 mm c/c E.W.


Using horizontal bar at bottom of pedestal : 16φ @ 200 mm c/c E.W.

6.2 CRACK WIDTH CHECK OF THE PEDESTAL FOR UNFACTORED MOMENT

Bolt Circle Diameter = 6226 mm


Pile Circle Diameter = 5800 mm
Pile Diameter = 600 mm

The equipment support type is skirt, the equipment load is directly transferred to piles.

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 23 REV. C
The area surrounded by piles is only affected by the weight of the concrete.

rc = 25 KN
B = 1m (take unit width)
D = PCD = 5.80 m
t = 1m

W = rcx(BxDxt) = 145.00 KN

Ms = W x PCD = 210.25 KN-m


4

S= bh2
6

σ= Ms = 1.26 N/mm2
S

3.83 2
fcr = 0.7 √fck = N/mm

Because σ< fcr , concrete won't crack at bottom of pedestal.

6.3 ANCHORAGE FAILURE MODES CHECK


.

6.3.1 Given
• Anchor Circle Dia. (Dbc): 6226 mm
Anchors : 12 Qty 45 mm Dia. With Heavy Hex Nuts
Material : ASTM F1554 Grade 36
f'c : 30 Mpa

• Face to Face of Pedestal (Dp): 7000 mm

• Factored Wind loads (Strength Level)


Mu : 3058 kN-m
Vu : 362 kN
• Vessel weight (Unfactored)
Empty Weight, W e : 1189.8 kN
Operating Weight Weight, W o : 3002.7 kN

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 24 REV. C
6.3.2 Anchor general information
Anchor Length, L = 1275 mm
Grout, G = 25 mm
Grip Length, Lg = 280 mm
Thread Length at Bottom, Lt = 90 mm
Nut Allowance (2 nuts) = 160 mm
Effective Embedment Length, hef = 720 mm
Anchor Circle Dia., Dbc = 6226 mm
Number of Anchors, na = 12 Nos.
Effective C/S Area, Ase,N = 1225 mm2
Bearing Area of Head/Stud, Abrg = 6510 mm2
Specified Tensile Strength, f uta = 400 MPa
Specified Tield Stress, fya = 248 MPa

6.3.3 Determine the factored shear force applied to single anchor (V ua)
• Check for shear due to wind under empty condition
Empty Weight, W e = 1189.8 kN
Factored wind moment, Mu = 3058 kN-m
Factored wind base shear, Vua = 362 kN

Factored Comp. Force,

Due to gravity load and couple force from overturning moment

Pu = 3058 x 1000 / ( 0.67 x 6226 ) + ( 0.9 x 1189.8 ) / 2


Thus, Pu = 1272 kN

Determine if shear is taken 100% by shear friction or 100% by the anchorage

Friction @ Base Vf = μ Pu where μ = 0.55


Vf = 0.55 x 1272 = 700 kN

No supplementary reinforcement provided thus, for shear f = 0.7 ACI 318M - D.4.3c
Ф Vf = 0.7 x 700
Thus, Ф Vf = 490 kN
which is ≥ V ua = 362 kN, Thus, no shear on the anchors

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 25 REV. C
6.3.4 Determine the maximum factored tensile load on single anchor (N ua)

Unfactored Empty Weight, W e = 1190 kN


Factored wind moment, Mu = 3058 kN-m (Strength Level)
Maximum factored tensile load on the anchors (Nua)

Nua = 4 x 3058 x 1000 / ( 12 x 6226 ) - 0.9 x 1190 / 12 = 74 kN

6.3.5 Determining the strength of anchorage in tension and shear


• Steel strength for anchor in tension (ФNsa) ACI 318M - D.5.1
Supplementary reinforcement provided (Condition A)
Tension Resustance Factor Ф = 0.75 ACI 318M - D.4.3a
Anchor governed by strength of ductile steel element
Nominal Tensile Strength Nsa = na Ase,N futa ACI 318M - Eq. D-3
where, na = 1 for single anchor
Nsa = 1 x 1225 x 400 / 1000 = 490 kN
ФNsa = 0.75 x 490 = 368 kN

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 26 REV. C
• Steel strength for anchor in shear (ФVsa)
Shear is taken 100% by shear friction as shown in Part 6.3.3 above

• Concrete breakout strength of a single anchor in tension (ФN cb) ACI 318M - D.5.2
Using the Saw-Cut Method for calculating Ncb [Ref : Wey et al (2010-1) Saw Cut Method 2]

Pedestal side, Sp = Dp / 2.414 =7000 / 2.414 = 2900 mm


Pedestal area, Ap 0.8284
= x ( 7000 / 1000)^2 = 40.59 m2

(1) Embedment Length, hef


Edge distances :
Ca1 = ( Dp - Dbc ) / 2 = ( 7000 - 6226 ) / 2 = 387 mm 1

Ca2 = = 6226 / 2 x tan ( 15 ) = 834 mm 1

Ca2 = Ca4 = 834 mm 1

(2) Limited Effective Embedment Length, h'ef


3 edgedistances are less than 1.5hef, therefore;
Ca,max = max ( 387 , 834 , 834 ) = 834 mm
h'ef = min ( hef , Ca,max / 1.5) = 556 mm ACI 318M - D.5.2.3
Ca3 = min ( 1.5 h'ef , 0.5 Dbc) = 834 mm
Ca,min = min ( 387 , 834 , 834 , 834 ) = 387 mm

(3) Projected Concrete Failure Area, ANco


2
ANco = 9 h'ef = 9 x ( 556 / 1000 ) ^ 2 = 2.78 m2 ACI 318M - Eq. D-5

(4) Effective Concrete Failure Area, Anc

ANc = { 40.59 - π/4 [ ( 6226 - min( 1668.25167207617 , 6226 ) ) / 1000 ] ^ 2 } / 12


= 2.02 m2

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 27 REV. C
For a single anchor, ANc shall not exceed naANco
ANc = min ( Calculated ANc , na ANco ) ACI 318M - D.5.2.1
ANc = 2
min ( 2.02 , 2.78 ) = 2.02 m
ANc / ANco = 0.73

(5) Basic Concrete Breakout Strength, Nb

ACI 318M - Eq. D-6


kc = 10 (for cast-in anchors)
λa = 1.0 λ (Cast-in and undercut anchor concrete failure) ACI 318M - D.3.6
λ= 1.0 (Reduction factor for normal weight concrete) ACI 318M - 8.6

For cast-in headed studs and headed bolts with 280 mm ≤ hef ≤ 635 mm,
Nb shall be checked by ACI 318M - Eq. D-7
Nb = 10 x 1 x 1 x 30 ^ 0.5 x 556 ^ 1.5 / 1000 = 718 kN ≤ 803 kN

(6) Modification Factors, Ψ


For Ca,min ≥ 1.5h'ef = 834 mm, ACI 318M - Eq. D-9

For Ca,min < 1.5h'ef = 834 mm, ACI 318M - Eq. D-10

Ψed,N = 0.84
Ψc,N = 1.25 (for cast-in anchors) ACI 318M - D.5.2.6
Ψcp,N = 1 (for all cases, including cast-in anchors) ACI 318M - D.5.2.7

(7) Concrete Breakout Strength of Anchor in Tension

ACI 318M - Eq. D-4


Ncb = 0.73 x 0.84 x 1.25 x 1 x 718 = 548 kN
ФNcb = 0.75 x Ncb = 411 kN

• Concrete breakout strength in shear (φVcb)


Shear is taken 100% by shear friction as shown in Part 6.3.3 above

• Pullout strength of anchor in tension, ФNpn

ACI 318M - Eq. D-13


Ψc,P = 1.4 (Analysis indicates no cracking at service loads)
Pullout strength in tension of a single anchor, Np
Np = 8 Abrg f'c = 8 x 6510 x 30 / 1000 = 1562 kN ACI 318M - Eq. D-14
ФNpn = 0.7 x 1.4 x 1562 = 1531 kN

• Concrete side-face blowout strength of anchor in tension (ФN sb)

ACI 318M - Eq. D-16

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 28 REV. C
As calculated, Ca1 = 387 mm
Ca2 = 834 mm
Effective Embedment Length, hef = 720 mm
Factor = ( 1 + Ca2 / Ca1 ) / 4, if Ca2 < 3Ca1, where 1 ≤ Ca2 / Ca1 ≤ 3 ACI 318M - D.5.4.1
Factor = 0.79
Nsb = 0.79 x ( 13 x 387 x 6510^0.5 x 1 x 30^0.5 ) / 1000 = 1754 kN
ФNsb = 0.7 x Nsb = 1228 kN

• Concrete prayout strength of anchor in shear


Shear is taken 100% by shear friction as shown in Part 6.3.3 above

6.3.6 Calculate the lowest design tensile strength of anchorage


ФNn = min ( ФNsa, ФNcb, ФNpn, ФNsb ) ACI 318M - D.4.1.1
ФNn = min ( 368 , 411 , 1531 , 1228 ) = 368 kN

6.3.7 Conclusion
ФNn = 368 kN ≥ Nua = 74 kN

Thus, OK. Anchorage adequate for tensile failure modes.


No need to add extra reinforcement to take anchor bolt tensile force.

CTCI & CINDA CONSORTIUM DLTPL Doc. No. 2340-E-RGF-DRS-DC-C-E-072

Foundation Calculation Sheet Contractor Doc. No. XF36-A300-072


for BOG RECONDENSER (210-
Contractor Prj. No.
V-01) 18E3500B
Date:29-10-'19
CINDA Engineering & Construction Pvt. Ltd.
Page No. - 29 REV. C
Document Number Rev. Sht No.
Package P.O discipline Serial No.
18P3500B M0042 EQ 0001 2 1 of 2

LNG Import, Storage and Regasification Terminal Project


LNG Regas Facilities Package

ATTACHMENT-1 VENDOR DRAWING

GENERAL ASSEMBLY & DETAILS

GODREJ Proj. No. : PBL000084

FOR Review

VENDOR INFORMATION ACCEPTANCE CODE


PO No 18P3500B-M0042  A: Approved
PO Description BOG RECONDENSER  AC: Approved with Comments
 RC: Return with Comment
Vendor Name GODREJ & BOYCE MFG. CO. LTD
 R: Reject
Attention / title Mr. Tarun Rathod
Telephone No 022-67964593 Submit / Resubmit with Days
Email Address trathod@godrej.com THIS REVIEW DOES NOT RELIEVE THE CONTRACTOR OF
HIS RESPONSIBILITY FOR ERRORS IN DESIGN
Doc. Class 2 By: Date :

2 20-SEP-19 IFR – Issued For Review RAM TR MP


1 07-AUG-19 IFR – Issued For Review KRK TR MP
0 08-JUNE-19 IFR – Issued For Review KRK TR MP
DATE WRITTEN BY CHECKED BY APPROVED BY
REV. STATUS – REVISION MEMO
DD-MMM-YY (name & signature) (name & signature) (name & signature)

Sections changed in last revision are identified by a vertical line in the right margin.
N

PLANT NORTH

NOTES:

FA MAX. ALLOWABLE NOZZLE LOADS


MT

MC
ML
FL

FC

Godrej & Boyce Mfg. Co. Ltd.


Process Equipment Division
ATTACHMENT-2 OUTPUT DRAWING

90°
T.N.
20°
P.N.0° 180°

270°

ISSUED FOR REVIEW

CTCI & CINDA CONSORTIUM

CINDA Engineering &


Construction Private Limited
ATTACHMENT-3 PILING DATA
PACKAGES EQUIPMENT LIST
EQUIPMENT TAG NO. DESCRIPTION GRID EQUIPMENT TAG NO. DESCRIPTION GRID
Pile Pile Estimated Allowable Estimated Estimated Allowable Lateral Capacity
200-Z-01 EMERGENCY POWER GENERATION PACKAGE (EDG) 3F 100-P-01A/B/C LNG IN TANK PUMPS(TANK T-01)(BY OTHER) 3D
WIND SPEED
(m/s)

Pile Pile 320-Z-01A/B/C NITROGEN GENERATION PACKAGE 6F 100-P-02A/B/C LNG IN TANK PUMPS(TANK T-02)(BY OTHER) 4D

E
Pile Top Tip Compression Capacity Allowable 340-Z-01 RO PLANT 6F 100-T-01 LNG STORAGE TANK (BY OTHER) 3D
>= 11.1

T.N.
90° 8.8 - 11.1
5.7 - 8.8
3.6 - 5.7
2.1 - 3.6
Diameter Length Area ( d = 5 mm, ton) 400-E-02A/B/C
400-G-01A/B/C(GEG)
COGENERATION HEAT EXCHANGER
GAS ENGINE GENERATION (GEG)
5F
5F
100-T-02
200-F-01
LNG STORAGE TANK (BY OTHER)
DIESEL UNLOADING FILTER
4D
2F

N
Type Elevation Elevation Tension
0.5 - 2.1

20°
Calms: 8.06%

(ton) Free Head Fixed Head


200-F-02
200-HO-01
DIESEL FILTER
EOT CRANE FOR WORKSHOP
2F
8E
P.N. 0° 180° (mm) (m) 200-HO-02 EOT CRANE FOR WAREHOUSE 8E
(m) (m) Capacity 200-P-01A/B DIESEL UNLOADING PUMP 2F

S
200-P-02A/B DIESEL TRANSFER PUMP 2F
w/o w/ w/o w/ 200-P-03 WATER / OIL REMOVAL PUMP 2F
270° w/ NSF1 w/o NSF1 (ton) 200-P-04 LNG DRAIN DRUM PUMP 4E
Soil Replacement Soil Replacement Soil Replacement Soil Replacement 200-P-07 LNG DRAIN PIT WATER REMOVAL PUMP 4E

W
200-T-01 DIESEL STORAGE TANK 2F
200-V-01 LNG DRAIN DRUM 4E
200-X-01 DIESEL COALESCER 2F
210-HO-01 EOT CRANE FOR HP SEND OUT PUMPS 4E

10
210-P-01A/B/C/D/E HP SEND OUT PUMP 5E
210-P-02 DEWATERING PUMP FOR HP PUMP PIT 5E
Area-1 106 193 70 0.3 4.5 0.9 11.9 210-V-01
220-K-01A/B/C
BOG RECONDENSER
BOG COMPRESSOR
4E
3E
220-K-02 MINIMUM SEND OUT COMPRESSOR PACKAGE 4E
220-K-03 BOG COMPRESSOR FOR BLACK STARTUP 3E
220-HO-01 EOT CRANE FOR BOG & MSO COMPRESSER 3E
220-V-01 BOG COMPRESSOR SUCTION DRUM 4E
220-V-02 BOG COMPRESSOR SUCTION DRAIN POT 4E
220-V-04 MSO COMPRESSOR SUCTION DRAIN POT 3E
220-X-01 BOG COMPRESSOR DESUPERHEATER 4E
230-E-01A/B/C/D/E LNG VAPORISER 3E
Area-2 45 155 70 0.8 4.5 2.1 11.9
PC pile 600 50 + 6.5 - 45.5
10
230-E-02A/B/C/D/E
230-E-03
230-P-02
240-Z-01A/B
240-Z-02A/B
GW AIR HEATER
SUBMERGED COMBUSTION VAPORISER (SCV)
SCV OVERFLOW WATER TRANSFER PUMP
GAS METERING STATION 1
GAS METERING STATION 2
3F
4E
4E
2E
2E
240-Z-03A/B GAS METERING STATION 3 2E
260-E-01 CHW-GW EXCHANGER 3E
260-P-01A/B/C/D/E/F/G/H/I/J GW CIRCULATION PUMP 3E
TIE-IN POINT FOR ROAD E=495725.308 260-P-02 GW DRAIN PUMP 3E
(IP-C-RGF/MFC-1006) N=2304870.085 260-P-04A/B CHW(CHILLED WATER) PUMP 6F
Area-3 156 227 70 0.7 4.5 1.8 11.9 260-P-05
260-P-06
GLYCOL TRANSFER PUMP
CHEMICAL REMOVAL PUMP
3E
4E
STP COORDINATE MATCH POINT
E=495727.673
N=2304863.588
ISBL, OSBL AND MARINE CONTRACTOR
HOLD 3
10
260-P-07A/B/C
260-P-08A/B
260-SU-01
260-SU-02
CONDENSATE TRANSFER PUMP
CONDENSATE TRANSFER PUMP
AIR HEATER CONDENSATE WATER
COLLECTION PIT
AIR HEATER CONDENSATE WATER
2C
2F
2C

COLLECTION PIT 2F
E=495501.288 INTERFACE LINE FOR UNLOADING PIPELINE
N=2305453.412 Note : 1. NSF : Negative Skin Friction CIVIL FOUNDATION WORK. 260-T-01
260-V-01
CHILLED WATER EXPANSION TANK
GW DRAIN DRUM
4F
3E
260-V-02A/B/C/D/E GLYCOL WATER EXPANSION DRUM 3E
MARINE (SEE DWG. NO. 2340-RGF-AFWIPL-CTCI-E-003) 260-Z-01A/B/C/D/E CORROSION INHIBITOR/BIOCIDE DOSING 3E
PACKAGE FOR GW LOOP
260-Z-02 CORROSION INHIBITOR/BIOCIDE DOSING 6F
E=495709.313 CCC (SEE DWG. NO. 2340-E-RGF-PIP-DX-L-E-004) PACKAGE CHILLED WATER LOOP
JETTY 280-L-01A/B/C LNG TRUCK LOADING FACILITY
E = 495475.724 TIE-IN POINT FOR C-WATER E=495549.986
(IP-X-RGF/MFC-1004) N=2305323.175
N=2304914.032 APPROACH
ROAD GATE
280-L-02A/B/C LNG TRUCK LOADING FACILITY
2D
2D
HOLD 6 280-Z-01 WEIGHBRIDGE 1E
N = 2305379.607 TIE-IN POINT FOR WATER
(IP-X-RGF/MFC-1002)
E=495550.328
N=2305322.235
TE=495595.710
TN=2305179.061
TE=495601.451
TN=2305173.492 E=495698.976 310-K-01A/B/C
310-V-01
AIR COMPRESSOR
PLANT AIR RECIEVER
6F
6F
TIE-IN POINT FOR SEWAGE E=495550.673 PE=611.000 PE=614.500 N=2304910.270 310-V-02 INSTRUMENT AIR RECIEVER 6F
PN=766.400 PN=759.200 310-V-04 GEG INSTRUMENT AIR BUFFER DRUM 5F
LEGEND
(IP-X-RGF/MFC-2001) N=2305321.286
310-Z-01A/B INSTRUMENT AIR DRYERS 6F
380-SU-05 320-V-01 6F
WATCH TOWER 380-P-05A/B NITROGEN RECIEVER
330-E-01A/B FUEL GAS AMBIENT AIR HEATER 4E
DN
4M ACCESSWAY 8.5M RD-14 330-E-02A/B ELECTRICAL FG HEATER 4E
PE 604.000 SECURITY CABIN
WATCH TOWER 6Mx11M 330-V-01 FUEL GAS KO DRUM 4E

DN
340-P-01A/B POTABLE WATER PUMPS 6F

PR-004-07
8.5M RD-14
PE 591.000
2600L02 (P) 340-T-01
340-T-02 Test Pile Location
POTABLE WATER OVER HEAD TANK
POTABLE WATER STORAGE TANK
6F
6F
16m
260-P-07A/B/C
Date : 5/21 E = 495678.718 350-P-01A/B SERVICE WATER PUMP 6F
5.0 M WIDE STORM WATER DRAIN

Depth : 51.5 m 350-T-01 SERVICE WATER STORAGE TANK 6F

BY RE-GAS CONTRACOTR

BY RE-GAS CONTRACOTR
N = 2304836.481
10.M WIDE EXTERNAL ROAD

BY TANK CONTRACTOR

BY TANK CONTRACTOR
360-P-01A/B MOTOR DRIVEN FIRE WATER PUMPS 8F

DN
2600C01-2 (C)
5.0 M WIDE CCPL LINE

PR-004-06
AIR HEATER CONDENSATE TE=495471.789 TE=495530.275 360-P-01C/D/E/F ENGINE DRIVEN FIRE WATER PUMPS 8F
Date : 4/23 2600T02 (L) 10m Soil Replacement Area

WATCH TOWER
WATER COLLECTION PIT 360-P-02A/B MOTOR DRIVEN JOCKEY PUMPS 8F
FUTURE (40Mx55Mx2M) TN=2305224.519 HOLD 6 TN=2305063.831
Date : 5/22 DIESEL STORAGE TANK FOR ENGINE DRIVEN 8F
RESERVOIR CONDENSATE WATER Depth260-SU-01
: 51.4 m 360-T-01C/D/E/F
16m PE=510.100 PE=510.100
Depth : 41.5 m
FIRE WATER PUMP
PN=851.500 PN=680.500 10m 360-T-02A/B FIRE WATER STORAGE TANK 9F
2600L01 (L) 370-C-01 COOLING TOWER 6F
2600C02 (C) CHILLED WATER/COOLING WATER HEAT
Date : 4/25
Date : 5/23 ...
370-E-01
Test Pile Information
EXCHANGER 6F

PR-004-05
Depth : 51.5 m 370-P-01A/B COOLING WATER PUMPS 6F
Depth : 51.5 m 370-T-01 COOLING WATER EXPANSION TANK 6F

DROPOUT
CORROSION INHIBITOR/BIOCIDE DOSING

PN. 759.000
PN. 772.000
2600T01 (P) 370-Z-01
INN

PACKAGE

8.5M RD-06
PN. 622.500
ER

8.5M RD-07
0

PN. 430.000
0
WEIGH BRIDGES

Date : 4/26 SANITARY SUMP PUMPS


20

380-P-02A/B 1F
...
WA

Test Pile Coordinate


R4
LL

380-P-03A/B SANITARY SUMP PUMPS 4F


280-L-02A
280-L-02B
280-L-02C

280-L-01A
280-L-01B
280-L-01C

Depth : 49.0 m
280-Z-01

380-P-04A/B SANITARY SUMP PUMPS 6F


PR-004-04
HOLD 11 380-P-05A/B SANITARY SUMP PUMPS 7C
PR-04

PR-05
380-P-06A/B SANITARY SUMP PUMPS 8F
380-P-07A/B SANITARY SUMP PUMPS 8G
8.5M RD-02

380-SU-02 SANITARY SUMP 1F


...
PN. 909.500

380-SU-03 Uncompleted Pile No.


SANITARY SUMP 4F

00

00
TRUCK LOADING SHED

INN

INN
20

20
DROPOUT

380-SU-04 SANITARY SUMP 6F

R4

R4
ER

ER
PR-009

WA

WA
380-SU-05 SANITARY SUMP 7C
8.5M RD-03

PR-004-03
PN. 793.500

8.5M RD-04

L
PN. 738.500
10Mx35Mx2.7M(H)

L
380-SU-06 SANITARY SUMP 8F
380-SU-07 SANITARY SUMP 8G
390-T-01
PR-002-03

LNG TANKER LOADING GANTRY 390-T-01 RCC TANK FOR RAIN WATER 4D
E = 495387.665 LNG TANK 100-T-01
LNG TANK 100-T-02
FUTURE LNG TANK (C)
390-P-01A/B
400-E-01
Compression Test
RAIN WATER HARVESTING LIFT PUMP
HOT WATER/GLYCOL WATER EXCHANGER
4D
4E
N = 2305225.753 390-P-01A/B
E=495530.656 400-P-01A/B
400-P-02
HOT WATER PUMP
HOT WATER DRAIN PUMP
5F
5F
GATE 5
N=2304777.733 400-SU-01 HOT WATER DRAIN COLLECTION PIT 5F
400-V-01 HOT WATER EXPANSION DRUM
8m (P) Pull-out Test
5F
PR-004-02
PR-002-02

E = 495330.802 1600T01 (L) 8.5M RD-13 400-Z-01 CHEMICAL ADDITIVES PKG FOR
HOT WATER LOOP 5F
210-P-01B

210-P-01D
210-P-01C

210-P-01E
210-P-01A

PE. 447.000
210-P-02
220-K-02 Date
220-K-03 :220-K-01C
3/20 220-K-01B 220-K-01A
N = 2305219.997
HOLD 10 METERING STATION
Depth : 39.5m
200-P-07
FUTURE HP PUMP FUTURE SCV
220-V-02

8Mx8M
MSO COMPRESSOR

200-V-01
220-HO-01

C.G.

MSO METERING SYSTEM 200-P-04 ELECTRIC METERING ROOM


(L)
PR-004-01
220-X-01

E = 495310.153 1600T01-2 (C)


(THROW-3)
(THROW-4)

AND IT/COMMUNICATION TIE-INS


Lateral Test
AIR COOLER

(THROW-1)
(THROW-2)

240-Z-03A/B 10m PSV


GAUGE BOARD
WITH CANOPY.

210-HO-01
E=495551.319
Date : 4/12
TI

TE TI
AIR COOLER 2 X 100% AIR COOLER AIR COOLER AIR COOLER
OUTLET OUTLET OUTLET
DUPLEX FILTER

TCV

F1 F2 F1 F2 F1 F2

COOLER
COOLER
INLET
OUTLET
N=2305333.204

N=2305330.742

HOT AIR OUTLET


N=2305328.279

AIR INLET
COOLER AIR INLET
COOLER AIR INLET
COOLER

210-V-01
PR-002-01
E=495343.532

E=495336.766

E=495330.000

HP PUMP N=2304720.957
N = 2305311.788 240-Z-02A/B

240-Z-01A/B PR-003-01
220-V-04 BOG COMPRESSOR AREA
Depth : 51.5 m
220-V-01
PR-003-04 PR-003-05
PR-003-02 PR-003-03
1600C03 (L)
260-E-01 1600C01 (P)
Add. Test Pile Location
PR-005-04
400-E-01
PR-001

FUTURE STV
8m 330-E-01B 330-E-02B
260-V-02B

4M ACCESSWAY
260-V-02D

260-V-02C

Date : 5/13
330-V-01

Date : 3/28
260-P-02
260-V-01

260-P-05
TIE-IN POINT FOR 240-Z-02A/B
TIE-IN POINT FOR 240-Z-03A/B

230-E-01C 230-E-01B 230-E-01A


TIE-IN POINT FOR 240-Z-01A/B

230-E-01E230-E-01D

GATE 1
FUTURE GAS
METERING
METERING STATION 6M ACCESSWAY
Depth : 42.4m 330-E-01A 330-E-02A Depth : 51.5 m
6M ACCESSWAY

PANEL
260-V-02E

1600C02-3 (L)
6M ACCESSWAY
260-V-02A

200-HO-01
ROOM

UP
230-E-03
(IP-X-RGF/MFC-1009)

LNG WORKSHOP
1600T03 (P)
(IP-X-RGF/MFC-1001)

(IP-X-RGF/MFC-1010)

Date : 4/20 16m


260-P-06

35Mx20M
260-Z-01D TRENCH

6M ACCESSWAY

230-P-02

Depth : 51.5 m STV AREA Date : 5/8


PR-008

16m

UP
PR-006
PR-007

Depth : 51.5 m
260-Z-01B
260-Z-01C
260-Z-01E

UP
200-HO-02
1600L02-2 (C)

CABLE TRENCH
260-P-01D
260-P-01F
260-P-01E

260-P-01C
260-P-01H
260-P-01G
260-P-01J

260-Z-01A
260-P-01A
260-P-01B
260-P-01I

PR-005-03

ASSEMBLY
LNG WAREHOUSE

POINT
1600L03 (C)

UP

PARKING
8.5M RD-12

AREA
35Mx20M
Date : 4/18 1600L04 PE. 360.500
16m
Date : 5/14
PN. 1006.500
8.5M RD-01

UP
Depth : 51.5 m Date : -/- Depth : 51.8 m

MA
LN
1600L02 (P) Depth : - m G

IN
260-P-08A/B Be

GA
6M RD-11 MD
1 rth
(Lateral) PE. 341.000 -1

TE
BD
AIR HEATER
Date : 3/13
MD 1
2
BD
2

1
MD
8.5M RD-05

3
PN. 693.500

BD
3
PR-005-02

SMOKING AREA
DROP AREA

DROP AREA

Depth : 48.3m SECURITY 90°


BD
4

AIR HEATER CONDENSATE


WATER COLLECTION PIT 230-E-02E 230-E-02D 230-E-02C 230-E-02B 230-E-02A CABIN E = 495469.712 T.N.
5.0 M WIDE STORM WATER DRAIN

PN. 406.000
6M RD-08
MD

(44Mx47Mx2M) 12.5Mx15M 4
MD

1600L06 (L)
5 Ber
ADMIN. BUILDING 20°
TO
LPG
JETT thin

P.N. 0° 180°
Y
(FUT
g Li
260-SU-02
URE)
10.M WIDE EXTERNAL ROAD

MD ne

N = 2304756.994
6
/CANTEEN & FIRST AID PARKING Moo
ring
5.0 M WIDE CCPL LINE

Line

Date : 5/6
PARKI
NG
BAY

40Mx20M AREA PARKI 380-S


NG 380-P U-01
BAY -01A/

GATE 7
3600C03 (C)ASSEMBLY
B

JETTY SUB-STATION &

270°
CONTROL ROOM
(22Mx22M)

1600L05 (L) Depth : 51.5 m AMBULANCE


PARKING
POINT
E=495483.492
AREA Date : -/-
Date : 4/30 3600C01 (C) 380-SU-06
N=2304626.454
PR-005-01

3600C02 (C) 380-P-06A/B Depth : - m

GATE 2
GATE 6

PR-010

380-SU-02
380-P-02A/B Depth : 48.5 m Date : -/- 8.5M RD-10 6M RD-10
(Compression)
PE. 292.500 Date : -/- PE. 292.500 GATE 3 GATE 4
Depth : - m
200-P-03
200-X-01
200-F-02
200-F-01

FUTURE TRANSFORMER BY RE-GAS CONTRACOTR 360-T-01C/D/E/F


ASSEMBLY SWGR ROOM BY GEG CONTRACTOR Depth : - m 360-P-01A 360-P-01B E=495463.927
FUTURE RAIL ROAD
CROSSING

E = 495273.827 (Compression)
SECURITY CABIN

POINT
& DOCUMENT

PR-011-01 PR-011-02 PR-011-03 PR-011-04 PR-011-05 PR-011-06 PR-011-07 PR-011-08 PR-011-09


(Compression)
400-P-01A/B

UP
4M ACCESSWAY

N=2304528.346
370-Z-01

260-T-01
370-C-01
370-P-01A370-T-01
400-SU-01

400-V-01
310-V-04

370-E-01

LNG 380-SU-03 310-K-01A/B/C 260-Z-02260-P-04B


400-P-02

N = 2305267.620 LNG 380-P-03A/B 400-G-01A/B/C


4M ACCESSWAY

200-T-01 SUBSTATION 400-E-02A/B/C 260-P-04A


EDG ROOM 80.5Mx33.5M 360-P-02A 360-P-01C/D/E/F 360-P-02B
4M ACCESSWAY

4M ACCESSWAY

70MX35M
380-P-04A/B

200-Z-01 350-T-01
370-P-01B

FUTURE LNG 350-P-01B


380-SU-04

LNG
CABLE TRENCH
200-P-01A SUBSTATION
HOLD 4 350-P-01A CENTRAL CONTROL BUILDING LNG FIRE
400-Z-01

WATCH TOWER
4M ACCESSWAY

200-P-01B 65Mx30M 310-V-01 310-V-02 STATION


UP
& LABORATORY
200-P-02A 37Mx14M
6M ACCESSWAY

DN

340-Z-01

2
200-P-02B 53Mx24M FIRE WATER TANK
GATE 5

1
310-Z-01A/B

E=495149.792
TRUCK ENTERING GATE SECURITY GATE-2
CABIN HEAVY
6Mx11M VEHICLE
6M RD-09
PE. 240.105
4M ACCESSWAY
NITROGEN
GENERATION
PACKAGE 320-V-01
340-T-02340-P-01B
340-T-01
320-Z-01A/B/C
340-P-01A
WATCH TOWER
DN
PARKING
AREA
ASSEMBLY
POINT
FIRE JEEP &
FIRE TRUCK
PARKING
AREA
360-T-02B
3
360-T-02A

90M
E=496170.596
N=2305203.962

LNG FLARE STAKE

N=2305325.478 380-SU-07
380-P-07A/B
E=495210.204 6M RD-09
PE. 219.613
N=2305133.461 SECURITY CABIN
4Mx4M
4M ACCESSWAY THIS AREA
DN

E=495306.711 EMERGENCY
GATE
WATCH TOWER
N=2304819.855
OTHER PLANT

E = 495235.384
LNG PLANT

TIE-IN POINT FOR ROAD E=495725.308

E = 495362.421
(IP-C-RGF/MFC-1006) N=2304870.085

STP COORDINATE MATCH POINT


E=495727.673
N=2304863.588
ISBL, OSBL AND MARINE CONTRACTOR
E=495501.288 INTERFACE LINE FOR UNLOADING PIPELINE

N = 2305099.654
N=2305453.412 CIVIL FOUNDATION WORK.

MARINE (SEE DWG. NO. 2340-RGF-AFWIPL-CTCI-E-003)

E=495709.313 CCC (SEE DWG. NO. 2340-E-RGF-PIP-DX-L-E-004)

E = 495418.330
TIE-IN POINT FOR C-WATER E=495549.986 JETTY
(IP-X-RGF/MFC-1004) N=2305323.175
N=2304914.032 APPROACH
ROAD GATE
TIE-IN POINT FOR WATER E=495550.328 TE=495595.710 TE=495601.451
TN=2305173.492 E=495698.976
AREA

(IP-X-RGF/MFC-1002) N=2305322.235 TN=2305179.061


TIE-IN POINT FOR SEWAGE E=495550.673 PE=611.000 PE=614.500 N=2304910.270
PN=766.400 PN=759.200
AREA

(IP-X-RGF/MFC-2001) N=2305321.286

380-SU-05
WATCH TOWER 380-P-05A/B
DN 4M ACCESSWAY 8.5M RD-14

N = 2304744.907
PE 604.000 SECURITY CABIN
WATCH TOWER DN 6Mx11M

PR-004-07
8.5M RD-14
260-P-07A/B/C PE 591.000

5.0 M WIDE STORM WATER DRAIN

BY RE-GAS CONTRACOTR

BY RE-GAS CONTRACOTR
10.M WIDE EXTERNAL ROAD

BY TANK CONTRACTOR

BY TANK CONTRACTOR
DN

5.0 M WIDE CCPL LINE

PR-004-06
AIR HEATER CONDENSATE TE=495471.789 TE=495530.275

WATCH TOWER
WATER COLLECTION PIT
FUTURE (40Mx55Mx2M) TN=2305224.519 TN=2305063.831
RESERVOIR CONDENSATE WATER 260-SU-01
PE=510.100 PE=510.100
PN=851.500 PN=680.500

PR-004-05
N = 2304641.127

DROPOUT
PN. 759.000
PN. 772.000
INNE

8.5M RD-06
PN. 622.500
00

8.5M RD-07
R

PN. 430.000
WEIGH BRIDGES

R420
WAL
E = 495227.925

L
280-L-02A
280-L-02B
280-L-02C

280-L-01A
280-L-01B
280-L-01C

280-Z-01

PR-004-04
E = 495344.121

PR-04

PR-05
8.5M RD-02
PN. 909.500

00
000
TRUCK LOADING SHED

INNE

INNE

R420
DROPOUT

R42
DATUM POINT
PR-009

R
WAL

WAL
8.5M RD-03

PR-004-03
PN. 793.500

8.5M RD-04
PN. 738.500
10Mx35Mx2.7M(H)

L
390-T-01
PR-002-03
LNG TANKER LOADING GANTRY
LNG TANK 100-T-02
LNG TANK 100-T-01 FUTURE LNG TANK

E=495530.656
390-P-01A/B
N=2304777.733

The location of this compression load


GATE 5

PR-002-02

PR-004-02
8.5M RD-13

210-P-01A
210-P-01B

210-P-01D
PE. 447.000

210-P-01C

210-P-01E

210-P-02
METERING STATION 220-K-02 220-K-03 220-K-01C 220-K-01B 220-K-01A 200-P-07
FUTURE HP PUMP FUTURE SCV

TE=495403.217

220-V-02
8Mx8M

MSO COMPRESSOR
200-V-01

220-HO-01
C.G.

MSO METERING SYSTEM

PR-004-01
200-P-04 ELECTRIC METERING ROOM

220-X-01
(THROW-3) (THROW-4)

AND IT/COMMUNICATION TIE-INS

AIR COOLER
(THROW-1) (THROW-2)

240-Z-03A/B PSV

TI
GAUGECANOPY.
WITH BOARD

E=495551.319
TE TI TCV COOLER AIR COOLER 2 XCOOLER
100% F1 F2 AIR COOLER
OUTLET F1 F2 AIR COOLER
OUTLET F1 F2 AIR COOLER
OUTLET

210-HO-01

DUPLEX FILTER
N=2305333.204

N=2305330.742
OUTLET HOT AIR OUTLET INLET

N=2305328.279
AIR COOLER
INLET AIR COOLER
INLET AIR COOLER
INLET

210-V-01

E=495343.532

PR-002-01
E=495336.766

E=495330.000
N=2304720.957

N = 2305174.271
240-Z-02A/B 220-V-04 BOG COMPRESSOR AREA 220-V-01 HP PUMP

240-Z-01A/B PR-003-01 PR-003-04 PR-003-05


PR-003-02 PR-003-03

N = 2304900.418
260-E-01

PR-005-04
PR-001

400-E-01
4M ACCESSWAY 330-E-01B 330-E-02B FUTURE STV

260-V-02D

260-V-02B

330-V-01
260-V-02C
260-V-01

260-P-02
260-P-05
TIE-IN POINT FOR 240-Z-03A/B

TIE-IN POINT FOR 240-Z-02A/B


230-E-01E230-E-01D 230-E-01C 230-E-01B 230-E-01A

TIE-IN POINT FOR 240-Z-01A/B

GATE 1
FUTURE GAS
METERING STATION METERING 6M ACCESSWAY 330-E-01A 330-E-02A

6M ACCESSWAY
260-V-02E
PANEL

6M ACCESSWAY
260-V-02A

200-HO-01
ROOM

UP
230-E-03
LNG WORKSHOP

(IP-X-RGF/MFC-1009)
(IP-X-RGF/MFC-1001)

(IP-X-RGF/MFC-1010)

260-P-06
35Mx20M

260-Z-01D TRENCH

6M ACCESSWAY

230-P-02
STV AREA

test needs to be shifted towards location

PR-008

UP
PR-007

PR-006
260-Z-01B
260-Z-01E

260-Z-01C

UP
200-HO-02
CABLE TRENCH
TN=2304506.249

260-P-01F
260-P-01E

260-P-01C
260-P-01J

260-P-01H
260-P-01G

260-P-01D

260-P-01B
260-P-01A
260-Z-01A
260-P-01I

PR-005-03

ASSEMBLY
POINT
LNG WAREHOUSE

UP

PARKING
8.5M RD-12

AREA
PE. 360.500 35Mx20M

PN. 1006.500
8.5M RD-01
UP

MAIN
260-P-08A/B 6M RD-11

GAT
AIR HEATER PE. 341.000

E1
8.5M RD-05
PN. 693.500
PR-005-02
DROP AREA

DROP AREA

SMOKING AREA
AIR HEATER CONDENSATE SECURITY
WATER COLLECTION PIT 230-E-02E 230-E-02D 230-E-02C 230-E-02B 230-E-02A CABIN

5.0 M WIDE STORM WATER DRAIN

6M RD-08
PN. 406.000
(44Mx47Mx2M) 12.5Mx15M
260-SU-02 ADMIN. BUILDING

10.M WIDE EXTERNAL ROAD


/CANTEEN & FIRST AID PARKING

5.0 M WIDE CCPL LINE


40Mx20M AREA
GATE 7 ASSEMBLY
AMBULANCE POINT
PARKING
AREA E=495483.492

PE=200,000
380-SU-06 N=2304626.454

PR-005-01
380-P-06A/B

GATE 2
GATE 6

PR-010
of Borehole BP-15
380-SU-02 8.5M RD-10 6M RD-10
380-P-02A/B PE. 292.500 PE. 292.500 GATE 3 GATE 4

200-P-03
200-F-02
200-X-01
200-F-01
FUTURE TRANSFORMER BY RE-GAS CONTRACOTR 360-T-01C/D/E/F
ASSEMBLY BY GEG CONTRACTOR 360-P-01B
SWGR ROOM 360-P-01A E=495463.927

SECURITY CABIN
POINT PR-011-01 PR-011-02 PR-011-03 PR-011-04 PR-011-05 PR-011-06 PR-011-07 PR-011-08 PR-011-09

& DOCUMENT

400-P-01A/B
UP

4M ACCESSWAY
N=2304528.346

370-P-01A370-T-01

370-Z-01
260-T-01

400-SU-01

370-E-01

370-P-01B 370-C-01
400-V-01
310-V-04
380-SU-03

400-P-02
LNG LNG 380-P-03A/B 310-K-01A/B/C 260-Z-02 260-P-04B

4M ACCESSWAY
SUBSTATION 400-G-01A/B/C
200-T-01 EDG ROOM 400-E-02A/B/C 260-P-04A 360-P-02A 360-P-01C/D/E/F 360-P-02B
80.5Mx33.5M

4M ACCESSWAY
70MX35M

4M ACCESSWAY
380-P-04A/B
200-Z-01 350-T-01
FUTURE LNG 350-P-01B

380-SU-04
LNG
200-P-01A CABLE TRENCH SUBSTATION 350-P-01A CENTRAL CONTROL BUILDING LNG FIRE

400-Z-01
WATCH TOWER 65Mx30M

4M ACCESSWAY
200-P-01B UP
310-V-01 310-V-02 & LABORATORY STATION
200-P-02A 37Mx14M

6M ACCESSWAY
DN

200-P-02B 340-Z-01 53Mx24M FIRE WATER TANK

GATE 5
310-Z-01A/B
4M ACCESSWAY
340-T-02340-P-01B FIRE JEEP & 360-T-02B 360-T-02A
6M RD-09 NITROGEN 340-P-01A
TRUCK ENTERING GATE SECURITY GATE-2 PE. 240.105 GENERATION 340-T-01 WATCH TOWER ASSEMBLY
FIRE TRUCK

PN=200,000
CABIN HEAVY PACKAGE 320-V-01 PARKING PARKING
6Mx11M VEHICLE POINT AREA
E=495149.792 320-Z-01A/B/C AREA DN

N=2305325.478 380-SU-07
380-P-07A/B
E=495210.204 6M RD-09
PE. 219.613
N=2305133.461 SECURITY CABIN 4M ACCESSWAY

CCC Reply:
4Mx4M DN

E=495306.711 EMERGENCY
GATE
WATCH TOWER
N=2304819.855

OTHER PLANT

LNG PLANT
AREA
AREA
DATUM POINT
TE=495403.217
TN=2304506.249
PE=200,000
PN=200,000

Revised, please refer to the latest DWG.

CTCI & CINDA CONSORTIUM

C:\Users\54530\Desktop\SI.jpg
PACKAGES EQUIPMENT LIST
EQUIPMENT TAG NO. DESCRIPTION GRID EQUIPMENT TAG NO. DESCRIPTION GRID
200-Z-01 EMERGENCY POWER GENERATION PACKAGE (EDG) 3F 100-P-01A/B/C LNG IN TANK PUMPS(TANK T-01)(BY OTHER) 3D
320-Z-01A/B/C NITROGEN GENERATION PACKAGE 6F 100-P-02A/B/C LNG IN TANK PUMPS(TANK T-02)(BY OTHER) 4D
340-Z-01 RO PLANT 6F 100-T-01 LNG STORAGE TANK (BY OTHER) 3D
400-E-02A/B/C COGENERATION HEAT EXCHANGER 5F 100-T-02 LNG STORAGE TANK (BY OTHER) 4D
400-G-01A/B/C(GEG) GAS ENGINE GENERATION (GEG) 5F 200-F-01 DIESEL UNLOADING FILTER 2F
200-F-02 DIESEL FILTER 2F

Legend 200-HO-01
200-HO-02
200-P-01A/B
200-P-02A/B
EOT CRANE FOR WORKSHOP
EOT CRANE FOR WAREHOUSE
DIESEL UNLOADING PUMP
DIESEL TRANSFER PUMP
8E
8E
2F
2F
200-P-03 WATER / OIL REMOVAL PUMP 2F
200-P-04 LNG DRAIN DRUM PUMP 4E
200-P-07 LNG DRAIN PIT WATER REMOVAL PUMP 4E
200-T-01 DIESEL STORAGE TANK 2F
Borehole Location 200-V-01
200-X-01
LNG DRAIN DRUM
DIESEL COALESCER
4E
2F
210-HO-01 EOT CRANE FOR HP SEND OUT PUMPS 4E
210-P-01A/B/C/D/E HP SEND OUT PUMP 5E
Borehole Number 210-P-02
210-V-01
DEWATERING PUMP FOR HP PUMP PIT
BOG RECONDENSER
5E
4E
220-K-01A/B/C BOG COMPRESSOR 3E
220-K-02 MINIMUM SEND OUT COMPRESSOR PACKAGE 4E
220-K-03 BOG COMPRESSOR FOR BLACK STARTUP 3E
Bearing Stratum Depth 220-HO-01
220-V-01
EOT CRANE FOR BOG & MSO COMPRESSER
BOG COMPRESSOR SUCTION DRUM
3E
4E
220-V-02
(Per Final Finished Grade Level, FGL 220-V-04
220-X-01
BOG COMPRESSOR SUCTION DRAIN POT
MSO COMPRESSOR SUCTION DRAIN POT
4E
3E
BOG COMPRESSOR DESUPERHEATER 4E
EL +100.000 m = CD +6.0 m) 230-E-01A/B/C/D/E
230-E-02A/B/C/D/E
LNG VAPORISER
GW AIR HEATER
3E
3F
230-E-03 SUBMERGED COMBUSTION VAPORISER (SCV) 4E
230-P-02 SCV OVERFLOW WATER TRANSFER PUMP 4E
240-Z-01A/B GAS METERING STATION 1 2E
240-Z-02A/B GAS METERING STATION 2 2E
240-Z-03A/B GAS METERING STATION 3 2E
260-E-01 CHW-GW EXCHANGER 3E
260-P-01A/B/C/D/E/F/G/H/I/J GW CIRCULATION PUMP 3E
TIE-IN POINT FOR ROAD E=495725.308 260-P-02 GW DRAIN PUMP 3E
(IP-C-RGF/MFC-1006) N=2304870.085 260-P-04A/B CHW(CHILLED WATER) PUMP 6F
260-P-05 GLYCOL TRANSFER PUMP 3E
260-P-06 CHEMICAL REMOVAL PUMP 4E
STP COORDINATE MATCH POINT HOLD 3 260-P-07A/B/C CONDENSATE TRANSFER PUMP 2C
E=495727.673 260-P-08A/B CONDENSATE TRANSFER PUMP 2F
N=2304863.588 260-SU-01 AIR HEATER CONDENSATE WATER 2C
COLLECTION PIT
ISBL, OSBL AND MARINE CONTRACTOR 260-SU-02 AIR HEATER CONDENSATE WATER 2F
E=495501.288 INTERFACE LINE FOR UNLOADING PIPELINE COLLECTION PIT
CIVIL FOUNDATION WORK. 260-T-01 CHILLED WATER EXPANSION TANK 4F
N=2305453.412 260-V-01 GW DRAIN DRUM 3E
260-V-02A/B/C/D/E GLYCOL WATER EXPANSION DRUM 3E
MARINE (SEE DWG. NO. 2340-RGF-AFWIPL-CTCI-E-003) 260-Z-01A/B/C/D/E CORROSION INHIBITOR/BIOCIDE DOSING 3E
PACKAGE FOR GW LOOP
260-Z-02 CORROSION INHIBITOR/BIOCIDE DOSING 6F
E=495709.313 CCC (SEE DWG. NO. 2340-E-RGF-PIP-DX-L-E-004) PACKAGE CHILLED WATER LOOP
TIE-IN POINT FOR C-WATER E=495549.986 JETTY 280-L-01A/B/C LNG TRUCK LOADING FACILITY 2D
N=2304914.032 APPROACH 280-L-02A/B/C LNG TRUCK LOADING FACILITY
(IP-X-RGF/MFC-1004) N=2305323.175 2D
TIE-IN POINT FOR WATER E=495550.328 HOLD 6 TE=495595.710 TE=495601.451
ROAD GATE 280-Z-01
310-K-01A/B/C
WEIGHBRIDGE
AIR COMPRESSOR
1E
6F
(IP-X-RGF/MFC-1002) N=2305322.235 TN=2305179.061 TN=2305173.492 E=495698.976
310-V-01 PLANT AIR RECIEVER 6F
TIE-IN POINT FOR SEWAGE E=495550.673 PE=611.000 PE=614.500 N=2304910.270 310-V-02 INSTRUMENT AIR RECIEVER 6F
(IP-X-RGF/MFC-2001) N=2305321.286 PN=766.400 PN=759.200 310-V-04 GEG INSTRUMENT AIR BUFFER DRUM 5F
310-Z-01A/B INSTRUMENT AIR DRYERS 6F
WATCH TOWER
380-SU-05
380-P-05A/B 320-V-01 NITROGEN RECIEVER 6F
330-E-01A/B FUEL GAS AMBIENT AIR HEATER 4E
4M ACCESSWAY 8.5M RD-14
SECURITY CABIN
330-E-02A/B ELECTRICAL FG HEATER 4E
PE 604.000
WATCH TOWER 6Mx11M 330-V-01 FUEL GAS KO DRUM 4E
340-P-01A/B POTABLE WATER PUMPS 6F

PR-004-07
8.5M RD-14 340-T-01 POTABLE WATER OVER HEAD TANK 6F
260-P-07A/B/C PE 591.000 54.70 m 340-T-02 POTABLE WATER STORAGE TANK 6F
350-P-01A/B SERVICE WATER PUMP 6F
350-T-01 SERVICE WATER STORAGE TANK 6F
5.0 M WIDE STORM WATER DRAIN

BY RE-GAS CONTRACOTR

BY RE-GAS CONTRACOTR
360-P-01A/B MOTOR DRIVEN FIRE WATER PUMPS 8F

BY TANK CONTRACTOR

BY TANK CONTRACTOR
10.M WIDE EXTERNAL ROAD

TE=495471.789 TE=495530.275 360-P-01C/D/E/F ENGINE DRIVEN FIRE WATER PUMPS 8F

PR-004-06
5.0 M WIDE CCPL LINE

AIR HEATER CONDENSATE


WATER COLLECTION PIT 360-P-02A/B MOTOR DRIVEN JOCKEY PUMPS 8F
HOLD 6

WATCH TOWER
FUTURE (40Mx55Mx2M) TN=2305224.519 TN=2305063.831
RESERVOIR CONDENSATE WATER 260-SU-01 360-T-01C/D/E/F DIESEL STORAGE TANK FOR ENGINE DRIVEN 8F
PE=510.100 PE=510.100 FIRE WATER PUMP
PN=851.500 PN=680.500 360-T-02A/B FIRE WATER STORAGE TANK 9F
370-C-01 COOLING TOWER 6F
370-E-01 CHILLED WATER/COOLING WATER HEAT 6F
EXCHANGER
370-P-01A/B COOLING WATER PUMPS 6F

PR-004-05
370-T-01 COOLING WATER EXPANSION TANK 6F

DROPOUT
PN. 772.000
370-Z-01 CORROSION INHIBITOR/BIOCIDE DOSING

PN. 759.000
54.55 m PACKAGE
I NN

8.5M RD-06
PN. 622.500
ER

8.5M RD-07
380-P-02A/B SANITARY SUMP PUMPS 1F

PN. 430.000
WEIGH BRIDGES

WA

380-P-03A/B SANITARY SUMP PUMPS 4F


LL
280-L-02A
280-L-02B
280-L-02C

280-L-01A
280-L-01B
280-L-01C

380-P-04A/B SANITARY SUMP PUMPS 6F


280-Z-01

HOLD 11
PR-004-04

380-P-05A/B SANITARY SUMP PUMPS 7C


PR-04

PR-05
380-P-06A/B SANITARY SUMP PUMPS 8F
380-P-07A/B SANITARY SUMP PUMPS 8G
380-SU-02 SANITARY SUMP 1F
8.5M RD-02
PN. 909.500

380-SU-03 SANITARY SUMP 4F

INN

INN
380-SU-04 SANITARY SUMP 6F
DROPOUT

PR-009

ER

ER
380-SU-05 SANITARY SUMP 7C

WA

WA
8.5M RD-03

PR-004-03

8.5M RD-04
PN. 793.500

LL

LL
380-SU-06 SANITARY SUMP 8F
PN. 738.500
10Mx35Mx2.7M(H)

380-SU-07 SANITARY SUMP 8G


390-T-01

390-T-01 RCC TANK FOR RAIN WATER


PR-002-03

LNG TANK 100-T-01


LNG TANK 100-T-02 4D
FUTURE LNG TANK 390-P-01A/B RAIN WATER HARVESTING LIFT PUMP 4D
400-E-01 HOT WATER/GLYCOL WATER EXCHANGER 4E
E=495530.656 400-P-01A/B HOT WATER PUMP 5F
390-P-01A/B 400-P-02 HOT WATER DRAIN PUMP 5F
GATE 5
N=2304777.733 400-SU-01 HOT WATER DRAIN COLLECTION PIT 5F
400-V-01 HOT WATER EXPANSION DRUM 5F
PR-004-02
PR-002-02

8.5M RD-13 400-Z-01 CHEMICAL ADDITIVES PKG FOR 5F


PE. 447.000 HOT WATER LOOP
210-P-01B

210-P-01D
210-P-01A

210-P-01C

210-P-01E

HOLD 10
210-P-02

METERING STATION 220-K-02 220-K-03 220-K-01C 220-K-01B 220-K-01A 200-P-07


FUTURE HP PUMP FUTURE SCV 8Mx8M
220-V-02
MSO COMPRESSOR

200-V-01
220-HO-01

MSO METERING SYSTEM 200-P-04 ELECTRIC METERING ROOM


PR-004-01
220-X-01

AND IT/COMMUNICATION TIE-INS


AIR COOLER

240-Z-03A/B E=495551.319
210-HO-01
210-V-01
N=2305333.204

N=2305330.742

N=2304720.957
N=2305328.279

HP PUMP
PR-002-01

240-Z-02A/B
E=495343.532

E=495336.766

E=495330.000

220-V-04 BOG COMPRESSOR AREA 220-V-01


49.39 m
240-Z-01A/B PR-003-01 49.39 m PR-003-04 PR-003-05
PR-003-02 PR-003-03
260-E-01
PR-005-04

FUTURE STV
PR-001

400-E-01

4M ACCESSWAY 330-E-01B 330-E-02B


260-V-02B
260-V-02D

260-V-02C

330-V-01

230-E-01C 230-E-01B 230-E-01A


260-V-01

230-E-01E 230-E-01D
260-P-02
260-P-05
TIE-IN POINT FOR 240-Z-03A/B

TIE-IN POINT FOR 240-Z-02A/B

TIE-IN POINT FOR 240-Z-01A/B

FUTURE GAS

GATE 1
METERING STATION METERING 6M ACCESSWAY
48.50 m 50.10
PANEL m 51.65 m 330-E-01A 330-E-02A
48.60 m 46.75 m 49.05 m 55.00 m
6M ACCESSWAY
260-V-02E

6M ACCESSWAY
260-V-02A

ROOM

200-HO-01
230-E-03

LNG WORKSHOP
(IP-X-RGF/MFC-1009)
(IP-X-RGF/MFC-1001)

(IP-X-RGF/MFC-1010)

35Mx20M
260-P-06
260-Z-01D TRENCH

6M ACCESSWAY

46.40 m
230-P-02

47.88 m STV AREA


PR-008

PR-007

PR-006
260-Z-01B
260-Z-01C
260-Z-01E

200-HO-02
CABLE TRENCH
260-P-01D
260-P-01F
260-P-01E

260-P-01C
260-P-01H
260-P-01G
260-P-01J

260-Z-01A
260-P-01A
260-P-01B
260-P-01I

LNG WAREHOUSE
PR-005-03

ASSEMBLY
POINT
8.5M RD-12

PARKING
35Mx20M

AREA
PE. 360.500
PN. 1006.500
8.5M RD-01

MA
IN
260-P-08A/B 6M RD-11

GA
AIR HEATER PE. 341.000

TE
1
8.5M RD-05
PN. 693.500
PR-005-02
DROP AREA

DROP AREA

SMOKING AREA
AIR HEATER CONDENSATE SECURITY
WATER COLLECTION PIT 230-E-02E 230-E-02D 230-E-02C 230-E-02B 230-E-02A CABIN

PN. 406.000
6M RD-08
12.5Mx15M
5.0 M WIDE STORM WATER DRAIN

(44Mx47Mx2M)
260-SU-02 ADMIN. BUILDING
/CANTEEN & FIRST AID PARKING
10.M WIDE EXTERNAL ROAD

51.70 m 51.70 m 41.10 m 40Mx20M AREA


5.0 M WIDE CCPL LINE

GATE 7 ASSEMBLY
AMBULANCE POINT
PARKING
AREA E=495483.492
380-SU-06
N=2304626.454
PR-005-01

380-P-06A/B

GATE 2
GATE 6

380-SU-02
PR-010

380-P-02A/B 8.5M RD-10 6M RD-10


PE. 292.500 PE. 292.500 GATE 3 GATE 4
BY RE-GAS CONTRACOTR
200-P-03

360-T-01C/D/E/F
200-X-01
200-F-02

FUTURE TRANSFORMER
200-F-01

ASSEMBLY BY GEG CONTRACTOR


POINT
SWGR ROOM 360-P-01A 360-P-01B E=495463.927
SECURITY CABIN

PR-011-01 PR-011-02 PR-011-03 PR-011-04 PR-011-05 PR-011-06 PR-011-07 PR-011-08 PR-011-09


& DOCUMENT

400-P-01A/B

N=2304528.346
4M ACCESSWAY

260-T-01 380-SU-03
370-C-01

370-Z-01

LNG 310-K-01A/B/C 260-Z-02 260-P-04B


310-V-04
400-SU-01

370-E-01

370-P-01A370-T-01
400-V-01
400-P-02

LNG SUBSTATION 380-P-03A/B 400-G-01A/B/C


4M ACCESSWAY

200-T-01 EDG ROOM 400-E-02A/B/C 260-P-04A


80.5Mx33.5M 70MX35M 360-P-02A 360-P-01C/D/E/F 360-P-02B
4M ACCESSWAY

4M ACCESSWAY

200-Z-01 350-T-01
380-P-04A/B

FUTURE LNG 350-P-01B


370-P-01B

LNG
380-SU-04

200-P-01A CABLE TRENCH


WATCH TOWER
SUBSTATION
HOLD 4 350-P-01A CENTRAL CONTROL BUILDING LNG FIRE
400-Z-01

200-P-01B 65Mx30M 310-V-01 310-V-02 STATION


4M ACCESSWAY

& LABORATORY
200-P-02A 340-Z-01 37Mx14M
6M ACCESSWAY

200-P-02B 53Mx24M FIRE WATER TANK


310-Z-01A/B
GATE 5

49.38 m4M ACCESSWAY 340-T-02340-P-01B 360-T-02B 360-T-02A


6M RD-09 NITROGEN FIRE JEEP &
56.40 m
TRUCK ENTERING GATE SECURITY GATE-2
CABIN
51.90 m 48.70
PE. 240.105 m 51.60 m 48.60 m 51.55 m
GENERATION 340-T-01
340-P-01A
WATCH TOWER 39.60 m
ASSEMBLY
FIRE TRUCK
PARKING
HEAVY PACKAGE 320-V-01 PARKING POINT AREA
6Mx11M VEHICLE
E=495149.792 320-Z-01A/B/C AREA

N=2305325.478 380-SU-07
380-P-07A/B
E=495210.204 6M RD-09
PE. 219.613
N=2305133.461 SECURITY CABIN 4M ACCESSWAY
4Mx4M
E=495306.711 EMERGENCY
GATE
WATCH TOWER
N=2304819.855
OTHER PLANT

LNG PLANT
AREA
AREA

DATUM POINT
TE=495403.217
TN=2304506.249
PE=200,000
PN=200,000