Adani House, NR Mithakhali Circle, Navrangpura, Ahmedabad 380 009, Gujarat, India
Adani House, NR Mithakhali Circle, Navrangpura, Ahmedabad 380 009, Gujarat, India
(DLTPL)
Adani House, Nr Mithakhali Circle, Navrangpura, Ahmedabad 380 009, Gujarat, India
Tel +91-79-25555801; Fax + 91-79-2555 6490; www.adani.com
PMC
EPCC CONTRACTOR
EPCC CONTRACTOR
18E3500B
PROJECT NO.:
EPCC CONTRACTOR
XF36-A300-072
DOCUMENT NO.:
B 25/09/2019 Issued For Review TUAN TUAN DORA DORA LOOMBA LOOMBA
A 07/06/2019 Issued For Review ROHIT ROHIT ARGHYA ARGHYA LOOMBA LOOMBA
This Document is the property of DLTPL. It should not be used, copied or reproduced without their written permission.
CONTENTS
Page
1.0 SCOPE & GENERAL DESCRIPTION 3
2.0 GENERAL DESCRIPTION / DESIGN PHILOSOPHY OF STRUCTURES:- 3
2.1 APPLICABLE SOFTWARE: 3
2.2 STRUCTURE TYPE 3
2.3 STRUCTURAL SYSTEM 3
2.4 FOUNDATION TYPE 3
3.0 DESIGN CRITERIA 4
3.1 DESIGN CODES & STANDARDS 4
3.2 MATERIALS 4
3.3 PILE CAPACITY 4
4.0 OUTLINE OF THE STRUCTURE 5
5.0 LOAD 6
5.1 LOAD CASES DEFINATION 6
5.2 DEAD LOAD 6
5.3 EQUIPMENT EMPTY / OPERATING / TESTING LOAD 6
5.4 SEISMIC LOAD 6
5.5 WIND LOAD 8
5.6 LOAD COMBINATION 10
6.0 FOUNDATION DESIGN 12
6.1 FOUNDATION DESIGN RESULT 12
6.2 CRACK WIDTH CHECK OF THE PEDESTAL FOR UNFACTORED MOMENT 23
6.3 ANCHORAGE FAILURE MODES CHECK 24
ATTACHMENT-1 VENDOR DRAWING
ATTACHMENT-2 OUTPUT DRAWING
ATTACHMENT-3 PILING DATA
SCOPE
ADLTPL (Adani Dhamra LNG Terminal Private Limited) intends to set up a LNG regasification terminal
at Dharma, Odisha, India. The terminal capacity shall be 5 MMTPA with all necessary provision to 10
MMTPA in future.
BOG Re-condenser(210-V-01) is a vertical vessel with vaariable diameters. It is situated in Area-300 between BOG
area and HP pump house near to pipe rack-04. Hieght of the vessel is 18.95 m supported on piles.
■ RC STRUCTURE
□ STEEL STRUCTURE
□ STEEL+RC STRUCTURE
3.2 MATERIALS
3.2.1 Concrete
High Strength Deformed (TMT) Steel bars of grade Fe 500D, confirming to IS: 1786 shall be used.
The material of anchor bolts shall be IS:2062 E250 Grade A for general services.
The BOG Re-condenser is supported on octagon block foundation with piles. The foundation are analyzed
and the designs are attached later in this design document
1) DEAD LOAD
2) EQUIPMENT EMPTY
3) EQUIPMENT OPERATING
4) EQUIPMENT TESTING
5) SEISMIC LOAD +X
6) SEISMIC LOAD +Z
7) WIND LOAD +X
8) WIND LOAD +Z
40.592 3
Volume= m
Pedestal weight= 1015 KN
VESSEL TYPE
1) Horizontal Vessel Support □
2) Verical Vessel Support ■
Therefore,
Spectral acceleration coefficient in X -dir = 2.5
Spectral acceleration coefficient in Z -dir = 2.5
VBx = 450.40 KN
VBz = 450.40 KN
Location: Dhamra
Vb: 55
Category 1
Windward Area
2
Width(m) Height(m) Area(m )
Height below 10m 6.546 9.8 64.151
Height from 10m to 15m 6.086 3.12 18.988
Height from 15m to 20m 3.506 5.98 20.966
Wind force F= Cf x Ae x Pd
Height below 10m
2
pd = Design wind pressure = 2.65 kN/m
2
Ae = Effective frontal Area = 64.151 m
Cf = force coefficient = 0.7
the surface area of the equipment(vessel/column) exposed to wind shall be increased by 20%
(As per 2340-E-RGF-GEN-DC-S-E-001_R0, CL-5.1.5)
2
Ae1 = Effective windward Area (Height below 10m) = 76.981 m
2
Ae2 = Effective windward Area (Height from 10m to 15m) = 22.786 m
2
Ae3 = Effective windward Area (Height from 15m to 20m) = 25.159 m
1 Load_Comb_101
1.00*DL + 1.00*EE
2 Load_Comb_102
1.00*DL + 1.00*EE + 1.00*WL
3 Load_Comb_103
1.00*DL + 1.00*EO
4 Load_Comb_104
1.00*DL + 1.00*EO + 1.00*WL
5 Load_Comb_105
1.00*DL + 1.00*EO + 1.00*SL
6 Load_Comb_106
1.00*DL + 1.00*ET
7 Load_Comb_107
1.00*DL + 1.00*ET + 0.25*WL
8 Load_Comb_201
1.50*DL + 1.50*EE
9 Load_Comb_202
1.50*DL + 1.50*EE + 1.50*WL
10 Load_Comb_203
0.90*DL + 0.90*EE + 1.50*WL
11 Load_Comb_204
1.50*DL + 1.50*EO
12 Load_Comb_205
1.50*DL + 1.50*EO + 1.50*WL
CONTENT
1. DESIGN DATA
Section 1
Height 18.900 m
Inside Diameter 6.000 m
Wall Thickness 43.000 mm
Insulation Thickness 230.000 mm
Projected Area 123.719 m2
Empty Weight 1189.800 kN
Operation Weight 3002.700 kN
Type = Type 3
Size = M45
Quantity = 12
Nut Number = 2
Material = E250
W/O Sleeve = No
Diameter = 45.0 mm
B.C.D = 6.226 m
Min. Edge = 150.0 mm
Length = 1255.0 mm
Grip Len. = 300.0 mm
Grout Thk. = 25.0 mm
Projection = 444.5 mm
Proj.(Use) = 445.0 mm
2. FOUNDATION SIZE
Size :
Flat-dir = 7.000 m
Dgnl-dir = 7.577 m
Height = 1.000 m
Height above ground = 0.300 m
Eq. Width = 6.371 m
Cover = 75.0 mm
Main Bar : 20φ
Diameter = 20.0 mm
Area = 314.3 mm2
Tie bar : 16φ
Diameter = 16.0 mm
Area = 201.2 mm2
Elevation of T.O.P = 0.300 m
3. LOADING DATA
Empty Wt. Operation Wt. Test Wt. Hor. Wind Hor. Wind(Test)
EE EO ET WL WL
Definition Status
Service+LongTerm SLS
Service+ShortTerm SLS
Collapse+LongTerm CLS
Collapse+ShortTerm CLS
At Bottom of Vessel(Equipment)
User Define
WL WL SL SL
H(kN ) 241.270 241.270 643.000 643.000
M(kN-m ) 2038.800 2038.800 5262.000 5262.000
Result
EE EO ET WL WL SL SL
H(kN ) 0.000 0.000 0.000 241.270 241.270 643.000 643.000
V(kN ) 1189.800 3002.700 3863.100 0.000 0.000 0.000 0.000
M(kN-m ) 0.000 0.000 0.000 2038.800 2038.800 5262.000 5262.000
At Bottom of Pedestal
DL DLs EE EO ET WL WL SL SL
H(kN ) 0.000 0.000 0.000 0.000 0.000 241.270 241.270 643.000 643.000
V(kN ) 1014.823 -278.752 1189.800 3002.700 3863.100 0.000 0.000 0.000 0.000
M(kN-m ) 0.000 0.000 0.000 0.000 0.000 2280.070 2280.070 5905.000 5905.000
Com. Name Work State Com. Definition OSF H(kN) V(kN) M(kN-m)
+ Com. Content
1 Load_Comb_201 Empty Collapse+LongTerm No 0.000 1784.700 0.000
1.50*DL + 1.50*EE
2 Load_Comb_202 Empty Collapse+ShortTerm No 361.905 1784.700 3058.200
1.50*DL + 1.50*EE + 1.50*WL
3 Load_Comb_203 Empty Collapse+ShortTerm No 361.905 1070.820 3058.200
0.90*DL + 0.90*EE + 1.50*WL
4 Load_Comb_204 Operation Collapse+LongTerm No 0.000 4504.050 0.000
1.50*DL + 1.50*EO
5 Load_Comb_205 Operation Collapse+ShortTerm No 361.905 4504.050 3058.200
1.50*DL + 1.50*EO + 1.50*WL
6 Load_Comb_206 Operation Collapse+ShortTerm No 964.500 4504.050 7893.000
1.50*DL + 1.50*EO + 1.50*SL
7 Load_Comb_207 Operation Collapse+ShortTerm No 361.905 2702.430 3058.200
0.90*DL + 0.90*EO + 1.50*WL
8 Load_Comb_208 Operation Collapse+ShortTerm No 964.500 2702.430 7893.000
Pedestal Design
Com. Name Work State Com. Definition OSF H(kN) V(kN) M(kN-m)
+ Com. Content
1 Load_Comb_201 Empty Collapse+LongTerm No 0.000 2888.807 0.000
1.50*DL + 1.50*EE
2 Load_Comb_202 Empty Collapse+ShortTerm No 361.905 2888.807 3420.105
1.50*DL + 1.50*EE + 1.50*WL
3 Load_Comb_203 Empty Collapse+ShortTerm No 361.905 1733.284 3420.105
0.90*DL + 0.90*EE + 1.50*WL
4 Load_Comb_204 Operation Collapse+LongTerm No 0.000 5608.157 0.000
1.50*DL + 1.50*EO
5 Load_Comb_205 Operation Collapse+ShortTerm No 361.905 5608.157 3420.105
1.50*DL + 1.50*EO + 1.50*WL
6 Load_Comb_206 Operation Collapse+ShortTerm No 964.500 5608.157 8857.500
1.50*DL + 1.50*EO + 1.50*SL
7 Load_Comb_207 Operation Collapse+ShortTerm No 361.905 3364.894 3420.105
0.90*DL + 0.90*EO + 1.50*WL
8 Load_Comb_208 Operation Collapse+ShortTerm No 964.500 3364.894 8857.500
0.90*DL + 0.90*EO + 1.50*SL
9 Load_Comb_209 Test Collapse+LongTerm No 0.000 6898.757 0.000
1.50*DL + 1.50*ET
10 Load_Comb_210 Test Collapse+ShortTerm No 90.476 6898.757 855.026
1.50*DL + 1.50*ET + 0.38*WL
11 Load_Comb_211 Test Collapse+ShortTerm No 90.476 4139.254 855.026
0.90*DL + 0.90*ET + 0.38*WL
Pile Capacity
Com. Name Work State Com. Definition OSF H(kN) V(kN) M(kN-m)
+ Com. Content
1 Load_Comb_101 Empty Service+LongTerm No 0.000 1925.872 0.000
1.00*DL + 1.00*EE
2 Load_Comb_102 Empty Service+ShortTerm No 241.270 1925.872 2280.070
1.00*DL + 1.00*EE + 1.00*WL
3 Load_Comb_103 Operation Service+LongTerm No 0.000 3738.772 0.000
1.00*DL + 1.00*EO
4 Load_Comb_104 Operation Service+ShortTerm No 241.270 3738.772 2280.070
1.00*DL + 1.00*EO + 1.00*WL
5 Load_Comb_105 Operation Service+ShortTerm No 643.000 3738.772 5905.000
1.00*DL + 1.00*EO + 1.00*SL
5. BUOYANCY CHECK
V : Vertical load
H : Horizontal load
M : Moment
All load apply at bottom of pedestal
5.2 Solution
Name = PC600
Diameter = 600.0 mm
Length = 50.000 m
Pile arrangement = Circle
Pt : No of Pile
X : X coordinate of Pile
Y : Y coordinate of Pile
Spc : Pile Spacing
Spc_min : Allowable Pile Spacing = 1.800 m
Ratio = Spc/Spc_min
Circle 1
Pt X(m) Y(m) Spc(m) Ratio
1 0.000 2.900 2.220 1.233 OK
2 2.051 2.051 2.220 1.233 OK
3 2.900 0.000 2.220 1.233 OK
4 2.051 -2.051 2.220 1.233 OK
5 0.000 -2.900 2.220 1.233 OK
6 -2.051 -2.051 2.220 1.233 OK
7 -2.900 0.000 2.220 1.233 OK
8 -2.051 2.051 2.220 1.233 OK
7. PEDESTAL DESIGN
7.1 Symbol
L : Width(Flat side)
c : Cover thickness
dt : Diameter of Ties
dm : Diameter of main bar
NB : Number of anchor bolt
RCD = L - 2 * (c + dt) - dm
Ast = (4 * Mt/RCD - Vt) / (fy/Gamma_ms)
Asb = (4 * Mb/RCD - Vb) / (fy/Gamma_ms)
Asv = (Ht/NB)/(f_yv/Gamma_ms)
Rho_min : Defined by IS 456:2000 26.5.3.1 c,g/Project File
Sreq : IS 456:2000 40.4
Smax : IS 456:2000 26.5.1.5
A) Main bar :
B) Ties :
D) Additional bar :
The equipment support type is skirt, the equipment load is directly transferred to piles.
rc = 25 KN
B = 1m (take unit width)
D = PCD = 5.80 m
t = 1m
W = rcx(BxDxt) = 145.00 KN
S= bh2
6
σ= Ms = 1.26 N/mm2
S
3.83 2
fcr = 0.7 √fck = N/mm
6.3.1 Given
• Anchor Circle Dia. (Dbc): 6226 mm
Anchors : 12 Qty 45 mm Dia. With Heavy Hex Nuts
Material : ASTM F1554 Grade 36
f'c : 30 Mpa
6.3.3 Determine the factored shear force applied to single anchor (V ua)
• Check for shear due to wind under empty condition
Empty Weight, W e = 1189.8 kN
Factored wind moment, Mu = 3058 kN-m
Factored wind base shear, Vua = 362 kN
No supplementary reinforcement provided thus, for shear f = 0.7 ACI 318M - D.4.3c
Ф Vf = 0.7 x 700
Thus, Ф Vf = 490 kN
which is ≥ V ua = 362 kN, Thus, no shear on the anchors
• Concrete breakout strength of a single anchor in tension (ФN cb) ACI 318M - D.5.2
Using the Saw-Cut Method for calculating Ncb [Ref : Wey et al (2010-1) Saw Cut Method 2]
For cast-in headed studs and headed bolts with 280 mm ≤ hef ≤ 635 mm,
Nb shall be checked by ACI 318M - Eq. D-7
Nb = 10 x 1 x 1 x 30 ^ 0.5 x 556 ^ 1.5 / 1000 = 718 kN ≤ 803 kN
For Ca,min < 1.5h'ef = 834 mm, ACI 318M - Eq. D-10
Ψed,N = 0.84
Ψc,N = 1.25 (for cast-in anchors) ACI 318M - D.5.2.6
Ψcp,N = 1 (for all cases, including cast-in anchors) ACI 318M - D.5.2.7
6.3.7 Conclusion
ФNn = 368 kN ≥ Nua = 74 kN
FOR Review
Sections changed in last revision are identified by a vertical line in the right margin.
N
PLANT NORTH
NOTES:
MC
ML
FL
FC
90°
T.N.
20°
P.N.0° 180°
270°
Pile Pile 320-Z-01A/B/C NITROGEN GENERATION PACKAGE 6F 100-P-02A/B/C LNG IN TANK PUMPS(TANK T-02)(BY OTHER) 4D
E
Pile Top Tip Compression Capacity Allowable 340-Z-01 RO PLANT 6F 100-T-01 LNG STORAGE TANK (BY OTHER) 3D
>= 11.1
T.N.
90° 8.8 - 11.1
5.7 - 8.8
3.6 - 5.7
2.1 - 3.6
Diameter Length Area ( d = 5 mm, ton) 400-E-02A/B/C
400-G-01A/B/C(GEG)
COGENERATION HEAT EXCHANGER
GAS ENGINE GENERATION (GEG)
5F
5F
100-T-02
200-F-01
LNG STORAGE TANK (BY OTHER)
DIESEL UNLOADING FILTER
4D
2F
N
Type Elevation Elevation Tension
0.5 - 2.1
20°
Calms: 8.06%
S
200-P-02A/B DIESEL TRANSFER PUMP 2F
w/o w/ w/o w/ 200-P-03 WATER / OIL REMOVAL PUMP 2F
270° w/ NSF1 w/o NSF1 (ton) 200-P-04 LNG DRAIN DRUM PUMP 4E
Soil Replacement Soil Replacement Soil Replacement Soil Replacement 200-P-07 LNG DRAIN PIT WATER REMOVAL PUMP 4E
W
200-T-01 DIESEL STORAGE TANK 2F
200-V-01 LNG DRAIN DRUM 4E
200-X-01 DIESEL COALESCER 2F
210-HO-01 EOT CRANE FOR HP SEND OUT PUMPS 4E
10
210-P-01A/B/C/D/E HP SEND OUT PUMP 5E
210-P-02 DEWATERING PUMP FOR HP PUMP PIT 5E
Area-1 106 193 70 0.3 4.5 0.9 11.9 210-V-01
220-K-01A/B/C
BOG RECONDENSER
BOG COMPRESSOR
4E
3E
220-K-02 MINIMUM SEND OUT COMPRESSOR PACKAGE 4E
220-K-03 BOG COMPRESSOR FOR BLACK STARTUP 3E
220-HO-01 EOT CRANE FOR BOG & MSO COMPRESSER 3E
220-V-01 BOG COMPRESSOR SUCTION DRUM 4E
220-V-02 BOG COMPRESSOR SUCTION DRAIN POT 4E
220-V-04 MSO COMPRESSOR SUCTION DRAIN POT 3E
220-X-01 BOG COMPRESSOR DESUPERHEATER 4E
230-E-01A/B/C/D/E LNG VAPORISER 3E
Area-2 45 155 70 0.8 4.5 2.1 11.9
PC pile 600 50 + 6.5 - 45.5
10
230-E-02A/B/C/D/E
230-E-03
230-P-02
240-Z-01A/B
240-Z-02A/B
GW AIR HEATER
SUBMERGED COMBUSTION VAPORISER (SCV)
SCV OVERFLOW WATER TRANSFER PUMP
GAS METERING STATION 1
GAS METERING STATION 2
3F
4E
4E
2E
2E
240-Z-03A/B GAS METERING STATION 3 2E
260-E-01 CHW-GW EXCHANGER 3E
260-P-01A/B/C/D/E/F/G/H/I/J GW CIRCULATION PUMP 3E
TIE-IN POINT FOR ROAD E=495725.308 260-P-02 GW DRAIN PUMP 3E
(IP-C-RGF/MFC-1006) N=2304870.085 260-P-04A/B CHW(CHILLED WATER) PUMP 6F
Area-3 156 227 70 0.7 4.5 1.8 11.9 260-P-05
260-P-06
GLYCOL TRANSFER PUMP
CHEMICAL REMOVAL PUMP
3E
4E
STP COORDINATE MATCH POINT
E=495727.673
N=2304863.588
ISBL, OSBL AND MARINE CONTRACTOR
HOLD 3
10
260-P-07A/B/C
260-P-08A/B
260-SU-01
260-SU-02
CONDENSATE TRANSFER PUMP
CONDENSATE TRANSFER PUMP
AIR HEATER CONDENSATE WATER
COLLECTION PIT
AIR HEATER CONDENSATE WATER
2C
2F
2C
COLLECTION PIT 2F
E=495501.288 INTERFACE LINE FOR UNLOADING PIPELINE
N=2305453.412 Note : 1. NSF : Negative Skin Friction CIVIL FOUNDATION WORK. 260-T-01
260-V-01
CHILLED WATER EXPANSION TANK
GW DRAIN DRUM
4F
3E
260-V-02A/B/C/D/E GLYCOL WATER EXPANSION DRUM 3E
MARINE (SEE DWG. NO. 2340-RGF-AFWIPL-CTCI-E-003) 260-Z-01A/B/C/D/E CORROSION INHIBITOR/BIOCIDE DOSING 3E
PACKAGE FOR GW LOOP
260-Z-02 CORROSION INHIBITOR/BIOCIDE DOSING 6F
E=495709.313 CCC (SEE DWG. NO. 2340-E-RGF-PIP-DX-L-E-004) PACKAGE CHILLED WATER LOOP
JETTY 280-L-01A/B/C LNG TRUCK LOADING FACILITY
E = 495475.724 TIE-IN POINT FOR C-WATER E=495549.986
(IP-X-RGF/MFC-1004) N=2305323.175
N=2304914.032 APPROACH
ROAD GATE
280-L-02A/B/C LNG TRUCK LOADING FACILITY
2D
2D
HOLD 6 280-Z-01 WEIGHBRIDGE 1E
N = 2305379.607 TIE-IN POINT FOR WATER
(IP-X-RGF/MFC-1002)
E=495550.328
N=2305322.235
TE=495595.710
TN=2305179.061
TE=495601.451
TN=2305173.492 E=495698.976 310-K-01A/B/C
310-V-01
AIR COMPRESSOR
PLANT AIR RECIEVER
6F
6F
TIE-IN POINT FOR SEWAGE E=495550.673 PE=611.000 PE=614.500 N=2304910.270 310-V-02 INSTRUMENT AIR RECIEVER 6F
PN=766.400 PN=759.200 310-V-04 GEG INSTRUMENT AIR BUFFER DRUM 5F
LEGEND
(IP-X-RGF/MFC-2001) N=2305321.286
310-Z-01A/B INSTRUMENT AIR DRYERS 6F
380-SU-05 320-V-01 6F
WATCH TOWER 380-P-05A/B NITROGEN RECIEVER
330-E-01A/B FUEL GAS AMBIENT AIR HEATER 4E
DN
4M ACCESSWAY 8.5M RD-14 330-E-02A/B ELECTRICAL FG HEATER 4E
PE 604.000 SECURITY CABIN
WATCH TOWER 6Mx11M 330-V-01 FUEL GAS KO DRUM 4E
DN
340-P-01A/B POTABLE WATER PUMPS 6F
PR-004-07
8.5M RD-14
PE 591.000
2600L02 (P) 340-T-01
340-T-02 Test Pile Location
POTABLE WATER OVER HEAD TANK
POTABLE WATER STORAGE TANK
6F
6F
16m
260-P-07A/B/C
Date : 5/21 E = 495678.718 350-P-01A/B SERVICE WATER PUMP 6F
5.0 M WIDE STORM WATER DRAIN
BY RE-GAS CONTRACOTR
BY RE-GAS CONTRACOTR
N = 2304836.481
10.M WIDE EXTERNAL ROAD
BY TANK CONTRACTOR
BY TANK CONTRACTOR
360-P-01A/B MOTOR DRIVEN FIRE WATER PUMPS 8F
DN
2600C01-2 (C)
5.0 M WIDE CCPL LINE
PR-004-06
AIR HEATER CONDENSATE TE=495471.789 TE=495530.275 360-P-01C/D/E/F ENGINE DRIVEN FIRE WATER PUMPS 8F
Date : 4/23 2600T02 (L) 10m Soil Replacement Area
WATCH TOWER
WATER COLLECTION PIT 360-P-02A/B MOTOR DRIVEN JOCKEY PUMPS 8F
FUTURE (40Mx55Mx2M) TN=2305224.519 HOLD 6 TN=2305063.831
Date : 5/22 DIESEL STORAGE TANK FOR ENGINE DRIVEN 8F
RESERVOIR CONDENSATE WATER Depth260-SU-01
: 51.4 m 360-T-01C/D/E/F
16m PE=510.100 PE=510.100
Depth : 41.5 m
FIRE WATER PUMP
PN=851.500 PN=680.500 10m 360-T-02A/B FIRE WATER STORAGE TANK 9F
2600L01 (L) 370-C-01 COOLING TOWER 6F
2600C02 (C) CHILLED WATER/COOLING WATER HEAT
Date : 4/25
Date : 5/23 ...
370-E-01
Test Pile Information
EXCHANGER 6F
PR-004-05
Depth : 51.5 m 370-P-01A/B COOLING WATER PUMPS 6F
Depth : 51.5 m 370-T-01 COOLING WATER EXPANSION TANK 6F
DROPOUT
CORROSION INHIBITOR/BIOCIDE DOSING
PN. 759.000
PN. 772.000
2600T01 (P) 370-Z-01
INN
PACKAGE
8.5M RD-06
PN. 622.500
ER
8.5M RD-07
0
PN. 430.000
0
WEIGH BRIDGES
380-P-02A/B 1F
...
WA
280-L-01A
280-L-01B
280-L-01C
Depth : 49.0 m
280-Z-01
PR-05
380-P-06A/B SANITARY SUMP PUMPS 8F
380-P-07A/B SANITARY SUMP PUMPS 8G
8.5M RD-02
00
00
TRUCK LOADING SHED
INN
INN
20
20
DROPOUT
R4
R4
ER
ER
PR-009
WA
WA
380-SU-05 SANITARY SUMP 7C
8.5M RD-03
PR-004-03
PN. 793.500
8.5M RD-04
L
PN. 738.500
10Mx35Mx2.7M(H)
L
380-SU-06 SANITARY SUMP 8F
380-SU-07 SANITARY SUMP 8G
390-T-01
PR-002-03
LNG TANKER LOADING GANTRY 390-T-01 RCC TANK FOR RAIN WATER 4D
E = 495387.665 LNG TANK 100-T-01
LNG TANK 100-T-02
FUTURE LNG TANK (C)
390-P-01A/B
400-E-01
Compression Test
RAIN WATER HARVESTING LIFT PUMP
HOT WATER/GLYCOL WATER EXCHANGER
4D
4E
N = 2305225.753 390-P-01A/B
E=495530.656 400-P-01A/B
400-P-02
HOT WATER PUMP
HOT WATER DRAIN PUMP
5F
5F
GATE 5
N=2304777.733 400-SU-01 HOT WATER DRAIN COLLECTION PIT 5F
400-V-01 HOT WATER EXPANSION DRUM
8m (P) Pull-out Test
5F
PR-004-02
PR-002-02
E = 495330.802 1600T01 (L) 8.5M RD-13 400-Z-01 CHEMICAL ADDITIVES PKG FOR
HOT WATER LOOP 5F
210-P-01B
210-P-01D
210-P-01C
210-P-01E
210-P-01A
PE. 447.000
210-P-02
220-K-02 Date
220-K-03 :220-K-01C
3/20 220-K-01B 220-K-01A
N = 2305219.997
HOLD 10 METERING STATION
Depth : 39.5m
200-P-07
FUTURE HP PUMP FUTURE SCV
220-V-02
8Mx8M
MSO COMPRESSOR
200-V-01
220-HO-01
C.G.
(THROW-1)
(THROW-2)
210-HO-01
E=495551.319
Date : 4/12
TI
TE TI
AIR COOLER 2 X 100% AIR COOLER AIR COOLER AIR COOLER
OUTLET OUTLET OUTLET
DUPLEX FILTER
TCV
F1 F2 F1 F2 F1 F2
COOLER
COOLER
INLET
OUTLET
N=2305333.204
N=2305330.742
AIR INLET
COOLER AIR INLET
COOLER AIR INLET
COOLER
210-V-01
PR-002-01
E=495343.532
E=495336.766
E=495330.000
HP PUMP N=2304720.957
N = 2305311.788 240-Z-02A/B
240-Z-01A/B PR-003-01
220-V-04 BOG COMPRESSOR AREA
Depth : 51.5 m
220-V-01
PR-003-04 PR-003-05
PR-003-02 PR-003-03
1600C03 (L)
260-E-01 1600C01 (P)
Add. Test Pile Location
PR-005-04
400-E-01
PR-001
FUTURE STV
8m 330-E-01B 330-E-02B
260-V-02B
4M ACCESSWAY
260-V-02D
260-V-02C
Date : 5/13
330-V-01
Date : 3/28
260-P-02
260-V-01
260-P-05
TIE-IN POINT FOR 240-Z-02A/B
TIE-IN POINT FOR 240-Z-03A/B
230-E-01E230-E-01D
GATE 1
FUTURE GAS
METERING
METERING STATION 6M ACCESSWAY
Depth : 42.4m 330-E-01A 330-E-02A Depth : 51.5 m
6M ACCESSWAY
PANEL
260-V-02E
1600C02-3 (L)
6M ACCESSWAY
260-V-02A
200-HO-01
ROOM
UP
230-E-03
(IP-X-RGF/MFC-1009)
LNG WORKSHOP
1600T03 (P)
(IP-X-RGF/MFC-1001)
(IP-X-RGF/MFC-1010)
35Mx20M
260-Z-01D TRENCH
6M ACCESSWAY
230-P-02
16m
UP
PR-006
PR-007
Depth : 51.5 m
260-Z-01B
260-Z-01C
260-Z-01E
UP
200-HO-02
1600L02-2 (C)
CABLE TRENCH
260-P-01D
260-P-01F
260-P-01E
260-P-01C
260-P-01H
260-P-01G
260-P-01J
260-Z-01A
260-P-01A
260-P-01B
260-P-01I
PR-005-03
ASSEMBLY
LNG WAREHOUSE
POINT
1600L03 (C)
UP
PARKING
8.5M RD-12
AREA
35Mx20M
Date : 4/18 1600L04 PE. 360.500
16m
Date : 5/14
PN. 1006.500
8.5M RD-01
UP
Depth : 51.5 m Date : -/- Depth : 51.8 m
MA
LN
1600L02 (P) Depth : - m G
IN
260-P-08A/B Be
GA
6M RD-11 MD
1 rth
(Lateral) PE. 341.000 -1
TE
BD
AIR HEATER
Date : 3/13
MD 1
2
BD
2
1
MD
8.5M RD-05
3
PN. 693.500
BD
3
PR-005-02
SMOKING AREA
DROP AREA
DROP AREA
PN. 406.000
6M RD-08
MD
(44Mx47Mx2M) 12.5Mx15M 4
MD
1600L06 (L)
5 Ber
ADMIN. BUILDING 20°
TO
LPG
JETT thin
P.N. 0° 180°
Y
(FUT
g Li
260-SU-02
URE)
10.M WIDE EXTERNAL ROAD
MD ne
N = 2304756.994
6
/CANTEEN & FIRST AID PARKING Moo
ring
5.0 M WIDE CCPL LINE
Line
Date : 5/6
PARKI
NG
BAY
GATE 7
3600C03 (C)ASSEMBLY
B
270°
CONTROL ROOM
(22Mx22M)
GATE 2
GATE 6
PR-010
380-SU-02
380-P-02A/B Depth : 48.5 m Date : -/- 8.5M RD-10 6M RD-10
(Compression)
PE. 292.500 Date : -/- PE. 292.500 GATE 3 GATE 4
Depth : - m
200-P-03
200-X-01
200-F-02
200-F-01
E = 495273.827 (Compression)
SECURITY CABIN
POINT
& DOCUMENT
UP
4M ACCESSWAY
N=2304528.346
370-Z-01
260-T-01
370-C-01
370-P-01A370-T-01
400-SU-01
400-V-01
310-V-04
370-E-01
4M ACCESSWAY
70MX35M
380-P-04A/B
200-Z-01 350-T-01
370-P-01B
LNG
CABLE TRENCH
200-P-01A SUBSTATION
HOLD 4 350-P-01A CENTRAL CONTROL BUILDING LNG FIRE
400-Z-01
WATCH TOWER
4M ACCESSWAY
DN
340-Z-01
2
200-P-02B 53Mx24M FIRE WATER TANK
GATE 5
1
310-Z-01A/B
E=495149.792
TRUCK ENTERING GATE SECURITY GATE-2
CABIN HEAVY
6Mx11M VEHICLE
6M RD-09
PE. 240.105
4M ACCESSWAY
NITROGEN
GENERATION
PACKAGE 320-V-01
340-T-02340-P-01B
340-T-01
320-Z-01A/B/C
340-P-01A
WATCH TOWER
DN
PARKING
AREA
ASSEMBLY
POINT
FIRE JEEP &
FIRE TRUCK
PARKING
AREA
360-T-02B
3
360-T-02A
90M
E=496170.596
N=2305203.962
N=2305325.478 380-SU-07
380-P-07A/B
E=495210.204 6M RD-09
PE. 219.613
N=2305133.461 SECURITY CABIN
4Mx4M
4M ACCESSWAY THIS AREA
DN
E=495306.711 EMERGENCY
GATE
WATCH TOWER
N=2304819.855
OTHER PLANT
E = 495235.384
LNG PLANT
E = 495362.421
(IP-C-RGF/MFC-1006) N=2304870.085
N = 2305099.654
N=2305453.412 CIVIL FOUNDATION WORK.
E = 495418.330
TIE-IN POINT FOR C-WATER E=495549.986 JETTY
(IP-X-RGF/MFC-1004) N=2305323.175
N=2304914.032 APPROACH
ROAD GATE
TIE-IN POINT FOR WATER E=495550.328 TE=495595.710 TE=495601.451
TN=2305173.492 E=495698.976
AREA
(IP-X-RGF/MFC-2001) N=2305321.286
380-SU-05
WATCH TOWER 380-P-05A/B
DN 4M ACCESSWAY 8.5M RD-14
N = 2304744.907
PE 604.000 SECURITY CABIN
WATCH TOWER DN 6Mx11M
PR-004-07
8.5M RD-14
260-P-07A/B/C PE 591.000
BY RE-GAS CONTRACOTR
BY RE-GAS CONTRACOTR
10.M WIDE EXTERNAL ROAD
BY TANK CONTRACTOR
BY TANK CONTRACTOR
DN
PR-004-06
AIR HEATER CONDENSATE TE=495471.789 TE=495530.275
WATCH TOWER
WATER COLLECTION PIT
FUTURE (40Mx55Mx2M) TN=2305224.519 TN=2305063.831
RESERVOIR CONDENSATE WATER 260-SU-01
PE=510.100 PE=510.100
PN=851.500 PN=680.500
PR-004-05
N = 2304641.127
DROPOUT
PN. 759.000
PN. 772.000
INNE
8.5M RD-06
PN. 622.500
00
8.5M RD-07
R
PN. 430.000
WEIGH BRIDGES
R420
WAL
E = 495227.925
L
280-L-02A
280-L-02B
280-L-02C
280-L-01A
280-L-01B
280-L-01C
280-Z-01
PR-004-04
E = 495344.121
PR-04
PR-05
8.5M RD-02
PN. 909.500
00
000
TRUCK LOADING SHED
INNE
INNE
R420
DROPOUT
R42
DATUM POINT
PR-009
R
WAL
WAL
8.5M RD-03
PR-004-03
PN. 793.500
8.5M RD-04
PN. 738.500
10Mx35Mx2.7M(H)
L
390-T-01
PR-002-03
LNG TANKER LOADING GANTRY
LNG TANK 100-T-02
LNG TANK 100-T-01 FUTURE LNG TANK
E=495530.656
390-P-01A/B
N=2304777.733
PR-002-02
PR-004-02
8.5M RD-13
210-P-01A
210-P-01B
210-P-01D
PE. 447.000
210-P-01C
210-P-01E
210-P-02
METERING STATION 220-K-02 220-K-03 220-K-01C 220-K-01B 220-K-01A 200-P-07
FUTURE HP PUMP FUTURE SCV
TE=495403.217
220-V-02
8Mx8M
MSO COMPRESSOR
200-V-01
220-HO-01
C.G.
PR-004-01
200-P-04 ELECTRIC METERING ROOM
220-X-01
(THROW-3) (THROW-4)
AIR COOLER
(THROW-1) (THROW-2)
240-Z-03A/B PSV
TI
GAUGECANOPY.
WITH BOARD
E=495551.319
TE TI TCV COOLER AIR COOLER 2 XCOOLER
100% F1 F2 AIR COOLER
OUTLET F1 F2 AIR COOLER
OUTLET F1 F2 AIR COOLER
OUTLET
210-HO-01
DUPLEX FILTER
N=2305333.204
N=2305330.742
OUTLET HOT AIR OUTLET INLET
N=2305328.279
AIR COOLER
INLET AIR COOLER
INLET AIR COOLER
INLET
210-V-01
E=495343.532
PR-002-01
E=495336.766
E=495330.000
N=2304720.957
N = 2305174.271
240-Z-02A/B 220-V-04 BOG COMPRESSOR AREA 220-V-01 HP PUMP
N = 2304900.418
260-E-01
PR-005-04
PR-001
400-E-01
4M ACCESSWAY 330-E-01B 330-E-02B FUTURE STV
260-V-02D
260-V-02B
330-V-01
260-V-02C
260-V-01
260-P-02
260-P-05
TIE-IN POINT FOR 240-Z-03A/B
GATE 1
FUTURE GAS
METERING STATION METERING 6M ACCESSWAY 330-E-01A 330-E-02A
6M ACCESSWAY
260-V-02E
PANEL
6M ACCESSWAY
260-V-02A
200-HO-01
ROOM
UP
230-E-03
LNG WORKSHOP
(IP-X-RGF/MFC-1009)
(IP-X-RGF/MFC-1001)
(IP-X-RGF/MFC-1010)
260-P-06
35Mx20M
260-Z-01D TRENCH
6M ACCESSWAY
230-P-02
STV AREA
PR-008
UP
PR-007
PR-006
260-Z-01B
260-Z-01E
260-Z-01C
UP
200-HO-02
CABLE TRENCH
TN=2304506.249
260-P-01F
260-P-01E
260-P-01C
260-P-01J
260-P-01H
260-P-01G
260-P-01D
260-P-01B
260-P-01A
260-Z-01A
260-P-01I
PR-005-03
ASSEMBLY
POINT
LNG WAREHOUSE
UP
PARKING
8.5M RD-12
AREA
PE. 360.500 35Mx20M
PN. 1006.500
8.5M RD-01
UP
MAIN
260-P-08A/B 6M RD-11
GAT
AIR HEATER PE. 341.000
E1
8.5M RD-05
PN. 693.500
PR-005-02
DROP AREA
DROP AREA
SMOKING AREA
AIR HEATER CONDENSATE SECURITY
WATER COLLECTION PIT 230-E-02E 230-E-02D 230-E-02C 230-E-02B 230-E-02A CABIN
6M RD-08
PN. 406.000
(44Mx47Mx2M) 12.5Mx15M
260-SU-02 ADMIN. BUILDING
PE=200,000
380-SU-06 N=2304626.454
PR-005-01
380-P-06A/B
GATE 2
GATE 6
PR-010
of Borehole BP-15
380-SU-02 8.5M RD-10 6M RD-10
380-P-02A/B PE. 292.500 PE. 292.500 GATE 3 GATE 4
200-P-03
200-F-02
200-X-01
200-F-01
FUTURE TRANSFORMER BY RE-GAS CONTRACOTR 360-T-01C/D/E/F
ASSEMBLY BY GEG CONTRACTOR 360-P-01B
SWGR ROOM 360-P-01A E=495463.927
SECURITY CABIN
POINT PR-011-01 PR-011-02 PR-011-03 PR-011-04 PR-011-05 PR-011-06 PR-011-07 PR-011-08 PR-011-09
& DOCUMENT
400-P-01A/B
UP
4M ACCESSWAY
N=2304528.346
370-P-01A370-T-01
370-Z-01
260-T-01
400-SU-01
370-E-01
370-P-01B 370-C-01
400-V-01
310-V-04
380-SU-03
400-P-02
LNG LNG 380-P-03A/B 310-K-01A/B/C 260-Z-02 260-P-04B
4M ACCESSWAY
SUBSTATION 400-G-01A/B/C
200-T-01 EDG ROOM 400-E-02A/B/C 260-P-04A 360-P-02A 360-P-01C/D/E/F 360-P-02B
80.5Mx33.5M
4M ACCESSWAY
70MX35M
4M ACCESSWAY
380-P-04A/B
200-Z-01 350-T-01
FUTURE LNG 350-P-01B
380-SU-04
LNG
200-P-01A CABLE TRENCH SUBSTATION 350-P-01A CENTRAL CONTROL BUILDING LNG FIRE
400-Z-01
WATCH TOWER 65Mx30M
4M ACCESSWAY
200-P-01B UP
310-V-01 310-V-02 & LABORATORY STATION
200-P-02A 37Mx14M
6M ACCESSWAY
DN
GATE 5
310-Z-01A/B
4M ACCESSWAY
340-T-02340-P-01B FIRE JEEP & 360-T-02B 360-T-02A
6M RD-09 NITROGEN 340-P-01A
TRUCK ENTERING GATE SECURITY GATE-2 PE. 240.105 GENERATION 340-T-01 WATCH TOWER ASSEMBLY
FIRE TRUCK
PN=200,000
CABIN HEAVY PACKAGE 320-V-01 PARKING PARKING
6Mx11M VEHICLE POINT AREA
E=495149.792 320-Z-01A/B/C AREA DN
N=2305325.478 380-SU-07
380-P-07A/B
E=495210.204 6M RD-09
PE. 219.613
N=2305133.461 SECURITY CABIN 4M ACCESSWAY
CCC Reply:
4Mx4M DN
E=495306.711 EMERGENCY
GATE
WATCH TOWER
N=2304819.855
OTHER PLANT
LNG PLANT
AREA
AREA
DATUM POINT
TE=495403.217
TN=2304506.249
PE=200,000
PN=200,000
C:\Users\54530\Desktop\SI.jpg
PACKAGES EQUIPMENT LIST
EQUIPMENT TAG NO. DESCRIPTION GRID EQUIPMENT TAG NO. DESCRIPTION GRID
200-Z-01 EMERGENCY POWER GENERATION PACKAGE (EDG) 3F 100-P-01A/B/C LNG IN TANK PUMPS(TANK T-01)(BY OTHER) 3D
320-Z-01A/B/C NITROGEN GENERATION PACKAGE 6F 100-P-02A/B/C LNG IN TANK PUMPS(TANK T-02)(BY OTHER) 4D
340-Z-01 RO PLANT 6F 100-T-01 LNG STORAGE TANK (BY OTHER) 3D
400-E-02A/B/C COGENERATION HEAT EXCHANGER 5F 100-T-02 LNG STORAGE TANK (BY OTHER) 4D
400-G-01A/B/C(GEG) GAS ENGINE GENERATION (GEG) 5F 200-F-01 DIESEL UNLOADING FILTER 2F
200-F-02 DIESEL FILTER 2F
Legend 200-HO-01
200-HO-02
200-P-01A/B
200-P-02A/B
EOT CRANE FOR WORKSHOP
EOT CRANE FOR WAREHOUSE
DIESEL UNLOADING PUMP
DIESEL TRANSFER PUMP
8E
8E
2F
2F
200-P-03 WATER / OIL REMOVAL PUMP 2F
200-P-04 LNG DRAIN DRUM PUMP 4E
200-P-07 LNG DRAIN PIT WATER REMOVAL PUMP 4E
200-T-01 DIESEL STORAGE TANK 2F
Borehole Location 200-V-01
200-X-01
LNG DRAIN DRUM
DIESEL COALESCER
4E
2F
210-HO-01 EOT CRANE FOR HP SEND OUT PUMPS 4E
210-P-01A/B/C/D/E HP SEND OUT PUMP 5E
Borehole Number 210-P-02
210-V-01
DEWATERING PUMP FOR HP PUMP PIT
BOG RECONDENSER
5E
4E
220-K-01A/B/C BOG COMPRESSOR 3E
220-K-02 MINIMUM SEND OUT COMPRESSOR PACKAGE 4E
220-K-03 BOG COMPRESSOR FOR BLACK STARTUP 3E
Bearing Stratum Depth 220-HO-01
220-V-01
EOT CRANE FOR BOG & MSO COMPRESSER
BOG COMPRESSOR SUCTION DRUM
3E
4E
220-V-02
(Per Final Finished Grade Level, FGL 220-V-04
220-X-01
BOG COMPRESSOR SUCTION DRAIN POT
MSO COMPRESSOR SUCTION DRAIN POT
4E
3E
BOG COMPRESSOR DESUPERHEATER 4E
EL +100.000 m = CD +6.0 m) 230-E-01A/B/C/D/E
230-E-02A/B/C/D/E
LNG VAPORISER
GW AIR HEATER
3E
3F
230-E-03 SUBMERGED COMBUSTION VAPORISER (SCV) 4E
230-P-02 SCV OVERFLOW WATER TRANSFER PUMP 4E
240-Z-01A/B GAS METERING STATION 1 2E
240-Z-02A/B GAS METERING STATION 2 2E
240-Z-03A/B GAS METERING STATION 3 2E
260-E-01 CHW-GW EXCHANGER 3E
260-P-01A/B/C/D/E/F/G/H/I/J GW CIRCULATION PUMP 3E
TIE-IN POINT FOR ROAD E=495725.308 260-P-02 GW DRAIN PUMP 3E
(IP-C-RGF/MFC-1006) N=2304870.085 260-P-04A/B CHW(CHILLED WATER) PUMP 6F
260-P-05 GLYCOL TRANSFER PUMP 3E
260-P-06 CHEMICAL REMOVAL PUMP 4E
STP COORDINATE MATCH POINT HOLD 3 260-P-07A/B/C CONDENSATE TRANSFER PUMP 2C
E=495727.673 260-P-08A/B CONDENSATE TRANSFER PUMP 2F
N=2304863.588 260-SU-01 AIR HEATER CONDENSATE WATER 2C
COLLECTION PIT
ISBL, OSBL AND MARINE CONTRACTOR 260-SU-02 AIR HEATER CONDENSATE WATER 2F
E=495501.288 INTERFACE LINE FOR UNLOADING PIPELINE COLLECTION PIT
CIVIL FOUNDATION WORK. 260-T-01 CHILLED WATER EXPANSION TANK 4F
N=2305453.412 260-V-01 GW DRAIN DRUM 3E
260-V-02A/B/C/D/E GLYCOL WATER EXPANSION DRUM 3E
MARINE (SEE DWG. NO. 2340-RGF-AFWIPL-CTCI-E-003) 260-Z-01A/B/C/D/E CORROSION INHIBITOR/BIOCIDE DOSING 3E
PACKAGE FOR GW LOOP
260-Z-02 CORROSION INHIBITOR/BIOCIDE DOSING 6F
E=495709.313 CCC (SEE DWG. NO. 2340-E-RGF-PIP-DX-L-E-004) PACKAGE CHILLED WATER LOOP
TIE-IN POINT FOR C-WATER E=495549.986 JETTY 280-L-01A/B/C LNG TRUCK LOADING FACILITY 2D
N=2304914.032 APPROACH 280-L-02A/B/C LNG TRUCK LOADING FACILITY
(IP-X-RGF/MFC-1004) N=2305323.175 2D
TIE-IN POINT FOR WATER E=495550.328 HOLD 6 TE=495595.710 TE=495601.451
ROAD GATE 280-Z-01
310-K-01A/B/C
WEIGHBRIDGE
AIR COMPRESSOR
1E
6F
(IP-X-RGF/MFC-1002) N=2305322.235 TN=2305179.061 TN=2305173.492 E=495698.976
310-V-01 PLANT AIR RECIEVER 6F
TIE-IN POINT FOR SEWAGE E=495550.673 PE=611.000 PE=614.500 N=2304910.270 310-V-02 INSTRUMENT AIR RECIEVER 6F
(IP-X-RGF/MFC-2001) N=2305321.286 PN=766.400 PN=759.200 310-V-04 GEG INSTRUMENT AIR BUFFER DRUM 5F
310-Z-01A/B INSTRUMENT AIR DRYERS 6F
WATCH TOWER
380-SU-05
380-P-05A/B 320-V-01 NITROGEN RECIEVER 6F
330-E-01A/B FUEL GAS AMBIENT AIR HEATER 4E
4M ACCESSWAY 8.5M RD-14
SECURITY CABIN
330-E-02A/B ELECTRICAL FG HEATER 4E
PE 604.000
WATCH TOWER 6Mx11M 330-V-01 FUEL GAS KO DRUM 4E
340-P-01A/B POTABLE WATER PUMPS 6F
PR-004-07
8.5M RD-14 340-T-01 POTABLE WATER OVER HEAD TANK 6F
260-P-07A/B/C PE 591.000 54.70 m 340-T-02 POTABLE WATER STORAGE TANK 6F
350-P-01A/B SERVICE WATER PUMP 6F
350-T-01 SERVICE WATER STORAGE TANK 6F
5.0 M WIDE STORM WATER DRAIN
BY RE-GAS CONTRACOTR
BY RE-GAS CONTRACOTR
360-P-01A/B MOTOR DRIVEN FIRE WATER PUMPS 8F
BY TANK CONTRACTOR
BY TANK CONTRACTOR
10.M WIDE EXTERNAL ROAD
PR-004-06
5.0 M WIDE CCPL LINE
WATCH TOWER
FUTURE (40Mx55Mx2M) TN=2305224.519 TN=2305063.831
RESERVOIR CONDENSATE WATER 260-SU-01 360-T-01C/D/E/F DIESEL STORAGE TANK FOR ENGINE DRIVEN 8F
PE=510.100 PE=510.100 FIRE WATER PUMP
PN=851.500 PN=680.500 360-T-02A/B FIRE WATER STORAGE TANK 9F
370-C-01 COOLING TOWER 6F
370-E-01 CHILLED WATER/COOLING WATER HEAT 6F
EXCHANGER
370-P-01A/B COOLING WATER PUMPS 6F
PR-004-05
370-T-01 COOLING WATER EXPANSION TANK 6F
DROPOUT
PN. 772.000
370-Z-01 CORROSION INHIBITOR/BIOCIDE DOSING
PN. 759.000
54.55 m PACKAGE
I NN
8.5M RD-06
PN. 622.500
ER
8.5M RD-07
380-P-02A/B SANITARY SUMP PUMPS 1F
PN. 430.000
WEIGH BRIDGES
WA
280-L-01A
280-L-01B
280-L-01C
HOLD 11
PR-004-04
PR-05
380-P-06A/B SANITARY SUMP PUMPS 8F
380-P-07A/B SANITARY SUMP PUMPS 8G
380-SU-02 SANITARY SUMP 1F
8.5M RD-02
PN. 909.500
INN
INN
380-SU-04 SANITARY SUMP 6F
DROPOUT
PR-009
ER
ER
380-SU-05 SANITARY SUMP 7C
WA
WA
8.5M RD-03
PR-004-03
8.5M RD-04
PN. 793.500
LL
LL
380-SU-06 SANITARY SUMP 8F
PN. 738.500
10Mx35Mx2.7M(H)
210-P-01D
210-P-01A
210-P-01C
210-P-01E
HOLD 10
210-P-02
200-V-01
220-HO-01
240-Z-03A/B E=495551.319
210-HO-01
210-V-01
N=2305333.204
N=2305330.742
N=2304720.957
N=2305328.279
HP PUMP
PR-002-01
240-Z-02A/B
E=495343.532
E=495336.766
E=495330.000
FUTURE STV
PR-001
400-E-01
260-V-02C
330-V-01
230-E-01E 230-E-01D
260-P-02
260-P-05
TIE-IN POINT FOR 240-Z-03A/B
FUTURE GAS
GATE 1
METERING STATION METERING 6M ACCESSWAY
48.50 m 50.10
PANEL m 51.65 m 330-E-01A 330-E-02A
48.60 m 46.75 m 49.05 m 55.00 m
6M ACCESSWAY
260-V-02E
6M ACCESSWAY
260-V-02A
ROOM
200-HO-01
230-E-03
LNG WORKSHOP
(IP-X-RGF/MFC-1009)
(IP-X-RGF/MFC-1001)
(IP-X-RGF/MFC-1010)
35Mx20M
260-P-06
260-Z-01D TRENCH
6M ACCESSWAY
46.40 m
230-P-02
PR-007
PR-006
260-Z-01B
260-Z-01C
260-Z-01E
200-HO-02
CABLE TRENCH
260-P-01D
260-P-01F
260-P-01E
260-P-01C
260-P-01H
260-P-01G
260-P-01J
260-Z-01A
260-P-01A
260-P-01B
260-P-01I
LNG WAREHOUSE
PR-005-03
ASSEMBLY
POINT
8.5M RD-12
PARKING
35Mx20M
AREA
PE. 360.500
PN. 1006.500
8.5M RD-01
MA
IN
260-P-08A/B 6M RD-11
GA
AIR HEATER PE. 341.000
TE
1
8.5M RD-05
PN. 693.500
PR-005-02
DROP AREA
DROP AREA
SMOKING AREA
AIR HEATER CONDENSATE SECURITY
WATER COLLECTION PIT 230-E-02E 230-E-02D 230-E-02C 230-E-02B 230-E-02A CABIN
PN. 406.000
6M RD-08
12.5Mx15M
5.0 M WIDE STORM WATER DRAIN
(44Mx47Mx2M)
260-SU-02 ADMIN. BUILDING
/CANTEEN & FIRST AID PARKING
10.M WIDE EXTERNAL ROAD
GATE 7 ASSEMBLY
AMBULANCE POINT
PARKING
AREA E=495483.492
380-SU-06
N=2304626.454
PR-005-01
380-P-06A/B
GATE 2
GATE 6
380-SU-02
PR-010
360-T-01C/D/E/F
200-X-01
200-F-02
FUTURE TRANSFORMER
200-F-01
400-P-01A/B
N=2304528.346
4M ACCESSWAY
260-T-01 380-SU-03
370-C-01
370-Z-01
370-E-01
370-P-01A370-T-01
400-V-01
400-P-02
4M ACCESSWAY
200-Z-01 350-T-01
380-P-04A/B
LNG
380-SU-04
& LABORATORY
200-P-02A 340-Z-01 37Mx14M
6M ACCESSWAY
N=2305325.478 380-SU-07
380-P-07A/B
E=495210.204 6M RD-09
PE. 219.613
N=2305133.461 SECURITY CABIN 4M ACCESSWAY
4Mx4M
E=495306.711 EMERGENCY
GATE
WATCH TOWER
N=2304819.855
OTHER PLANT
LNG PLANT
AREA
AREA
DATUM POINT
TE=495403.217
TN=2304506.249
PE=200,000
PN=200,000