Professional Documents
Culture Documents
05 51 36 - Catwalk Construction en
05 51 36 - Catwalk Construction en
B. Materials which do not comply with the standards shall not be used. Materials
which are deemed to be inappropriate by the employer or employer’s
representative shall be replaced.
1.5 GUARANTEE
A. Project Guarantee: This point is referred to the contractor agreement.
Thickness : 15 mm