Professional Documents
Culture Documents
Kirloskar Ebara Pumps LTD.: ROG Strong Caustic Circulation Pump
Kirloskar Ebara Pumps LTD.: ROG Strong Caustic Circulation Pump
27.08.2019
29-AUG-2019
PRABU T RAKESH (C589)
Page 1 of 3
SIGNATURE NAME / DATE
Vishal Digule
27.08.2019
1 No Comments.
42
29-AUG-2019
PRABU T RAKESH (C589)
Page 2 of 3
RETAINED FOR RECORDS
1. IT SHALL BE ENTIRELY THE VENDOR'S RESPONSIBILITY TO ENSURE COMPLIANCE
TO ALL REQUIREMENTS OF REQUISITION.
2. EIL REVIEW OF VENDOR'S DRAWING & DOCUMENT SHALL NOT RELIEVE THE VENDOR
FROM RESPONSIBILITY TO SUPPLY EQUIPMENT/SERVICES AS PER REQUISITION.
3. ALL REQUIREMENT OF EIL PR SHALL BE FULLY COMPLIED WITH UNLESS
OTHERWISE AGREED BETWEEN EIL & VENDOR WITHOUT ANY COST AND DELIVERY
IMPLICATION.
29-AUG-2019
PRABU T RAKESH (C589)
Page 3 of 3