KIRLOSKAR EBARA PUMPS LTD.

Project Title Guru Gobind Singh Polymer Addition Project Bhatinda


Client's Name HMEL Bhatinda Tag No 912-PA-2602 A/B.

Consultant EIL PO/LOI NO. 7410000150 Dtd 01.08.2018

Service ROG Strong Caustic Circulation Pump Pump Model 50 X 40 UCW 16


KEPL SO NO 50100561 Rev No 02

Sr. No. Ow er/ EPMC Co sulta t’s Co e t Ve dor’s Respo se /Clarificatio

1 Ok. Incorporated as per approved data sheet.

27.08.2019

29-AUG-2019
PRABU T RAKESH (C589)

Page 1 of 3
SIGNATURE NAME / DATE

Vishal Digule
27.08.2019

1 No Comments.

Proceed with manufacture / fabrication as per the


2
Commented document. Revised document required.

Document does not conform to basic requirements


3 As marked. Resubmit for review.

R Retained for Records. V Void.

THE REVIEW / APPROVAL DOES NOT RELIEVE THE VENDOR


/ MANUFACTURER OF THE FULL RESPONSIBILITY AS TO
DESIGN CORRECTNESS OF DIMENSIONS AND COMPLIANCE
WITH ALL APPLICABLE REGULATIONS AND WITH THE
REQUIREMENTS MADE IN PURCHASER SPECIFICATIONS

42

29-AUG-2019
PRABU T RAKESH (C589)

Page 2 of 3
RETAINED FOR RECORDS
1. IT SHALL BE ENTIRELY THE VENDOR'S RESPONSIBILITY TO ENSURE COMPLIANCE
TO ALL REQUIREMENTS OF REQUISITION.
2. EIL REVIEW OF VENDOR'S DRAWING & DOCUMENT SHALL NOT RELIEVE THE VENDOR
FROM RESPONSIBILITY TO SUPPLY EQUIPMENT/SERVICES AS PER REQUISITION.
3. ALL REQUIREMENT OF EIL PR SHALL BE FULLY COMPLIED WITH UNLESS
OTHERWISE AGREED BETWEEN EIL & VENDOR WITHOUT ANY COST AND DELIVERY
IMPLICATION.

29-AUG-2019
PRABU T RAKESH (C589)

Page 3 of 3