PROJECT DANGOTE REFINERY & PETROCHEMICALS PROJECT

CLIENT M/S. DANGOTE PETROLEUM REFINERY AND PEROCHEMICALS FZE, LEKKI , NIGERIA.
DOC. DEC. Utility Consumption Data
DOC. NO. A545-5005-5141-VD-COMMON-UL-LS-006

S.L. Equipt Driver KW


Area Code Unit Tag No Service Type Seal Plan Utility Consumption data (PER UNIT)
NO. Quantity rating

Bearing CW Sea CW Inst Air Steam DM water Raw water Nitrogen


Plant Air (Nm3/hr)
(m3/hr) (m3/hr) (Nm3/hr) (Kg/hr) (m3/hr) (Kg/hr) (Nm3/hr)

AODD Pump for Neutralizer Dosing


1 --- 101 101-PA-1035 1 ---- --- --- --- --- --- --- --- --- ---
Package 42 Nm3/hr (Max.)

AODD Pump for Corrosion Inhibitor


1 --- 101 101-PA-1036 1 ---- --- --- --- --- --- --- --- --- ---
Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Emulsion Breaker


1 --- 101 101-PA-1037 1 ---- --- --- --- --- --- --- --- --- ---
Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Reverse Emulsion


1 --- 101 101-PA-1038 1 ---- --- --- --- --- --- --- --- --- ---
Breaker Dosing Package 42 Nm3/hr (Max.)

AODD Pump forTri Sodium


1 --- 120 120-PA-1002 1 ---- --- --- --- --- --- --- --- --- ---
Phosphate Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Tri Sodium


1 --- 150 150-PA-1002 1 ---- --- --- --- --- --- --- --- --- ---
Phosphate Dosing Package 42 Nm3/hr (Max.)

AODD Pump for HP TSP Dosing


1 --- 180 180-PA-1033 1 ---- --- --- --- --- --- --- --- --- ---
Package 42 Nm3/hr (Max.)

AODD Pump for LP TSP Dosing


1 --- 180 180-PA-1034 1 ---- --- --- --- --- --- --- --- --- ---
Package 42 Nm3/hr (Max.)

AODD Pump for Morpholine Dosing


1 --- 680 680-PA-1011 1 ---- --- --- --- --- --- --- --- --- ---
Package 42 Nm3/hr (Max.)

AODD Pump for Morpholine Dosing


1 --- 680 680-PA-1012 1 ---- --- --- --- --- --- --- --- --- ---
Package 42 Nm3/hr (Max.)

15-OCT-2019
PRABU T RAKESH (C589)
Page 1 of 2
1 of 3

Page 1 of 3
PROJECT DANGOTE REFINERY & PETROCHEMICALS PROJECT
CLIENT M/S. DANGOTE PETROLEUM REFINERY AND PEROCHEMICALS FZE, LEKKI , NIGERIA.
DOC. DEC. Utility Consumption Data
DOC. NO. A545-5005-5141-VD-COMMON-UL-LS-006

S.L. Equipt Driver KW


Area Code Unit Tag No Service Type Seal Plan Utility Consumption data (PER UNIT)
NO. Quantity rating

AODD Pump for Morpholine Dosing


1 --- 680 680-PA-1020 1 ---- --- --- --- --- --- --- --- --- ---
Package 42 Nm3/hr (Max.)

AODD Pump for Oxygen Scavenger


1 --- 680 680-PA-1025 1 ---- --- --- --- --- --- --- --- --- ---
Dosing Package 42 Nm3/hr (Max.)

AODD Pump forGasoline Dye


1 --- 680 720-PA-2017 1 ---- --- --- --- --- --- --- --- --- ---
Additive Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Gasoline MFA


1 --- 720 720-PA-2018 1 ---- --- --- --- --- --- --- --- --- ---
Additive Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Anti-Static Additive


1 --- 720 720-PA-2019 1 ---- --- --- --- --- --- --- --- --- ---
Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Anti-Oxidant


1 --- 720 720-PA-2020 1 ---- --- --- --- --- --- --- --- --- ---
Additive Dosing Package 42 Nm3/hr (Max.)

AODD Pump for Lubricity Additive


1 --- 720 720-PA-2021 1 ---- --- --- --- --- --- --- --- --- ---
Dosing Package 42 Nm3/hr (Max.)

15-OCT-2019
PRABU T RAKESH (C589)
Page 2 of 2
2 of 3

Page 2 of 3
RETAINED FOR RECORDS
1. IT SHALL BE ENTIRELY THE VENDOR'S RESPONSIBILITY TO ENSURE COMPLIANCE
TO ALL REQUIREMENTS OF REQUISITION.
2. EIL REVIEW OF VENDOR'S DRAWING & DOCUMENT SHALL NOT RELIEVE THE VENDOR
FROM RESPONSIBILITY TO SUPPLY EQUIPMENT/SERVICES AS PER REQUISITION.
3. ALL REQUIREMENT OF EIL PR SHALL BE FULLY COMPLIED WITH UNLESS
OTHERWISE AGREED BETWEEN EIL & VENDOR WITHOUT ANY COST AND DELIVERY
IMPLICATION.

15-OCT-2019
PRABU T RAKESH (C589)
3 of 3