FIRE SHAFT COMPARTMENT AT EKA HOSPITAL BSDPackage 01 - Structural, Architectural and ME Works

BILL NO. 7 : HVAC SYSTEM

Rate (IDR) Amount (IDR)


Code Description Quantity Unit Total Amount
Material Labor Material Labor

HVAC SYSTEM

PRESSURIZED AIR FAN


Supply and install the following of Single Inlet
Pressurized Fan units complete with other system
components, foundation, base frame and others
necessary compenents support.

A PAF-RF.1 type Centrifugal Fan single inlet Axial 1 no


-Flow Rate 13700 CFM
-SP. __ Inch WG
-___ kw/380V/3ph/50Hz
-Sound Level ___ db

B Fresh air fan Axial 1 no


-Flow Rate 1850 CMH
-___Kw/220V/1ph/50Hz
-Sound Level 49 db

Ducting
Supply and install duct work made of galvalum mild steel
sheet including all necessary component supports.

FRESH AIR DUCT

C BJLS with 1,4 mm thickness (Top floor) 12 m2

D BJLS 60 thickness (Riser shaft fresh air) 65 m2

E BJLS 60 thickness (fresh air to lobby lift) 13 m2

Bill 7 - 1
FIRE SHAFT COMPARTMENT AT EKA HOSPITAL BSDPackage 01 - Structural, Architectural and ME Works

BILL NO. 7 : HVAC SYSTEM

Rate (IDR) Amount (IDR)


Code Description Quantity Unit Total Amount
Material Labor Material Labor

DIFFUSER, GRILLE AND LOUVRE

Supply and install diffusers, grilles and louvers complete


with adjustable blade volume control damper, air plenum
box, spigot and all necessary supporting accessories
inaccordance with the specifications and drawings as
described

A PAR 800 x 600 c/w OBD 8 no

B FAG 250 x 250 c/w OBD 8 no

DEMOLITION & RELOCATION

Dismantling and reorganizing AC dan Fan existing


C system (include ducting, grille, diffuser at the existing 1 ls
operational building area

TESTING and COMMISSIONING

D Allow for testing and commissioning 1 ls

E Allow for instruction Manual Book and training the 1 ls


Employer's engineering staff
Total of HVAC
System
Rp. - - -

Bill 7 - 2