Professional Documents
Culture Documents
Procurement of Katike-Sablakhu Rural Road Maintainance Project
Procurement of Katike-Sablakhu Rural Road Maintainance Project
Procurement of Katike-Sablakhu Rural Road Maintainance Project
for
Issued on: 1
Invitation for Bids No.: SRMT 075-76/01
NCB No.: NCB/ SRMT /075-76/01
Sidingwa Rural Municipali
Sablakhu,Taplejung
Rate Analysis
Project Title: KATIKE-SABLAKHU RURAL ROAD MAINTAINANCE PROJECT
Project Location: SIDINGWA RURAL MUNICIPALITY-4, SABLAKHU, TAPLEJUNG
Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per specification.
26.00 36.00
Classification of Soil
250.88
Average rate of excavation
Contractor's Profit@15% 37.63
Rate per Cum 288.51
ysis
F/Y:- 2075/76
Unit : 1 cum.
30.00 8.00
100.00
OS-40%,MR-20%,HR-15%,BMS-25%
Approved By:
-20%,HR-15%,BMS-25%
Project Title: KATIKE-SABLAKHU RURAL ROAD MAINTAINANCE PROJECT
Project Location: SIDINGWA RURAL MUNICIPALITY-4, SABLAKHU, TAPLEJUNG
Survey Date: 2/18/2019
Design Date: 2/25/2019
Abstract of Quantity
Description Quantity (m3)
88955.800
Sidingwa Rural Municipality
Sablakhu,Taplejung
ABSTRACT OF COST
Project Title: KATIKE-SABLAKHU RURAL ROAD MAINTAINANCE PROJECT F/Y:- 2075/76
Project Location: SIDINGWA RURAL MUNICIPALITY-4, SABLAKHU, TAPLEJUNG
Insurance for the damage and loss of works, plants and vehicles; personal injury, death of
1 1.00 PS. 50000.00 50000.00
labour, Employee & third party insurance (CAR Insurance).
Providing & Installation of reflectorized Bridge Sign Board of size 1.5mX0.75m with steel
2 1.00 No. 10000.00 10000.00
stands including all reinforcement works & formwork complete.(SS-1500).
3 Roadway excavation in all types of soil/rock including backcutting & drainage etc haulage and
32085.60 m3 288.51 9257024.54
disposal all complete as directed by Site Incharge.
4 Fabrication of Gabion Box Including Rolling Cutting and Weaving & Packing and
Filling of Gabion Crates with Rubble Stone.
4.1 Fabrication of Gabion Box Including Rolling Cutting and Weaving of (3x1x1 ) 120.00 Box 5706.14 684736.68
4.2 Fabrication of Gabion Box Including Rolling Cutting and Weaving of (2x1x1 ) 147.00 Box 3947.33 580257.36
5 Packing and Filling of Gabion Crates with Rubble Stone.
5.1 Packing and Filling of Gabion Crates with Rubble Stone (3x1x1) 360.00 m3 3027.66 1089958.50
5.2 Packing and Filling of Gabion Crates with Rubble Stone (2x1x1) 294.00 m3 3027.66 890132.77
6 Transportation of materials
6.1 Black Top Road With Truck 8.44 Ton 1008.00 8508.29
6.2 In Earthen Road With Trackter 8.44 Ton 2280.00 19244.95
Total Estimate Cost Nrs :- 12589863.09
14220031.78
6513.51
ABSTRACT OF COST
Project Title: KATIKE-SABLAKHU RURAL ROAD MAINTAINANCE PROJECT
Project Location: SIDINGWA RURAL MUNICIPALITY-4, SABLAKHU, TAPLEJUNG
SN Decription
Insurance for the damage and loss of works, plants and vehicles; personal injury, death of
1
labour, Employee & third party insurance (CAR Insurance).
Providing & Installation of reflectorized Bridge Sign Board of size 1.5mX0.75m with steel
2
stands including all reinforcement works & formwork complete.(SS-1500).
3 Roadway excavation in all types of soil/rock including backcutting & drainage etc haulage and
disposal all complete as directed by Site Incharge.
4 Fabrication of Gabion Box Including Rolling Cutting and Weaving & Packing and
Filling of Gabion Crates with Rubble Stone.
4.1 Fabrication of Gabion Box Including Rolling Cutting and Weaving of (3x1x1 )
4.2 Fabrication of Gabion Box Including Rolling Cutting and Weaving of (2x1x1 )
5 Packing and Filling of Gabion Crates with Rubble Stone.
5.1 Packing and Filling of Gabion Crates with Rubble Stone (3x1x1)
5.2 Packing and Filling of Gabion Crates with Rubble Stone (2x1x1)
6 Transportation of materials
6.1 Black Top Road With Truck
6.2 In Earthen Road With Trackter
Total Estimate Cost Nrs :-
13% VAT
Sub-Total Cost Nrs :-
Contingencies@3%
Survey Expences, design & estimate Cost NRs
OF COST
F/Y:- 2075/76
1.00 PS.
1.00 No.
32085.60 m3 32085.60
120.00 Box
147.00 Box
360.00 m3
294.00 m3
8.44 Ton
8.44 Ton
NRs
0.00
Sidingwa Rural Municipality
Sablakhu,Taplejung
DETAILED ESTIMATING & COSTING
(Gabion Wall)
Project Name:-Kartika Sablakhu Gabion Wall Construction
Place :- Sidingwa-4, Sablakhu 1 Place: Siseni Kholsi 16 m
Start End
S.N Particular Length No Quantity Unit Rate Amount
Chainage Chainage
Fabrication of Gabion Box Including
1 Rolling Cutting and Weaving of 80.00 80.00 Box 5449.75 435980.00
(3x1x1 )
Fabrication of Gabion Box Including
2 Rolling Cutting and Weaving of 48.00 48.00 Box 3763.73 180659.04
(2x1x1 ) 0+290.00 0+306.00 16 m
4 Ratmate Kholsi 12 m
Start End
S.N Particular Length No Quantity Unit Rate Amount
Chainage Chainage
Fabrication of Gabion Box Including
1 Rolling Cutting and Weaving of 20.00 20.00 Box 5449.75 108995.00
(3x1x1 )
Fabrication of Gabion Box Including
2 Rolling Cutting and Weaving of 12.00 12.00 Box 3763.73 45164.76
(2x1x1 ) 1+470.00 1+482.00 12.00
H=6m
Remarks
H=5M
H=4m
lsi 12 m
Remarks
H=4m
Earthwork Volume Soil Distribution (Ordinary Cut) Soil Distribution (Structure Cut) Soil Distribution (Drain Cut)
Ordinary Ordinary Structure Drain
OS MR HR BMS OS MR HR BMS OS MR HR BMS
Cut Fill Cut Back Fill Cut
(m3) (m3) (m3) (m3) (m3) (m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m )
3
(m3)
0.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.06 60.20 0.70 0.00 0.00 4.30 15.65 18.06 4.82 21.67 0.00 0.00 0.00 0.00 1.12 1.29 0.34 1.55
5.56 76.70 8.20 0.00 0.00 8.60 19.94 23.01 6.14 27.61 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
1.60 37.10 12.10 0.00 0.00 8.60 9.65 11.13 2.97 13.36 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
2.33 75.00 4.00 0.00 0.00 8.60 19.50 22.50 6.00 27.00 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
8.04 96.10 0.70 0.00 0.00 8.60 24.99 28.83 7.69 34.60 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
3.84 81.40 0.60 0.00 0.00 8.60 21.16 24.42 6.51 29.30 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
3.76 46.10 4.20 0.00 0.00 8.50 11.99 13.83 3.69 16.60 0.00 0.00 0.00 0.00 2.21 2.55 0.68 3.06
0.55 48.80 4.20 0.00 0.00 8.50 12.69 14.64 3.90 17.57 0.00 0.00 0.00 0.00 2.21 2.55 0.68 3.06
6.48 128.10 0.00 0.00 0.00 8.60 33.31 38.43 10.25 46.12 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
7.94 135.10 8.80 0.00 0.00 8.60 35.13 40.53 10.81 48.64 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
4.67 126.00 8.80 0.00 0.00 8.60 32.76 37.80 10.08 45.36 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
7.09 220.80 0.00 0.00 0.00 8.60 57.41 66.24 17.66 79.49 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
13.51 210.60 0.00 0.00 0.00 8.60 54.76 63.18 16.85 75.82 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
6.14 316.90 2.10 308.90 129.80 8.60 82.39 95.07 25.35 114.08 80.31 92.67 24.71 111.20 2.24 2.58 0.69 3.10
23.43 450.30 7.40 308.90 129.80 8.60 117.08 135.09 36.02 162.11 80.31 92.67 24.71 111.20 2.24 2.58 0.69 3.10
18.59 299.90 5.30 0.00 0.00 8.60 77.97 89.97 23.99 107.96 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
9.40 243.20 0.00 0.00 0.00 8.60 63.23 72.96 19.46 87.55 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
13.30 290.60 0.00 0.00 0.00 8.60 75.56 87.18 23.25 104.62 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
13.82 232.80 3.70 0.00 0.00 8.60 60.53 69.84 18.62 83.81 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
7.91 220.60 3.70 0.00 0.00 8.60 57.36 66.18 17.65 79.42 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
12.68 269.70 0.50 0.00 0.00 8.60 70.12 80.91 21.58 97.09 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
12.49 229.60 9.10 0.00 0.00 8.60 59.70 68.88 18.37 82.66 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
8.94 246.60 31.10 0.00 0.00 8.60 64.12 73.98 19.73 88.78 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
14.07 318.30 36.30 0.00 0.00 8.60 82.76 95.49 25.46 114.59 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
15.63 399.50 30.60 0.00 0.00 8.60 103.87 119.85 31.96 143.82 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
21.65 300.90 16.80 0.00 0.00 8.60 78.23 90.27 24.07 108.32 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
6.43 150.90 0.00 0.00 0.00 8.60 39.23 45.27 12.07 54.32 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
7.65 181.20 0.00 0.00 0.00 8.60 47.11 54.36 14.50 65.23 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
9.26 412.00 0.00 0.00 0.00 8.60 107.12 123.60 32.96 148.32 0.00 0.00 0.00 0.00 2.24 2.58 0.69 3.10
140.000
Project Title: KATIKE-SABLAKHU RURAL ROAD MA
Project Location: SIDINGWA RURAL MUNICIPALITY
Survey Date: 2/18/2019
Design Date: 2/25/2019
ng Wall
Start Chainage End Chainage
Description Foundation Layer Name Foundation Layer Area
(m) (m)
Total : 204.400
Project Title: KATIKE-SABLAKHU RURAL ROAD MAINTAINANCE PROJECT
Project Location: SIDINGWA RURAL MUNICIPALITY-4, SABLAKHU, TAPLEJUNG
Survey Date: 2/18/2019
Design Date: 2/25/2019
Right Right
Chainage Length
Left Drain Left Drain Drain Drain
Foundatio Foundatio Foundatio Foundatio
Left Drain n Layer n Layer Right Right n Layer n Layer Left Drain Right Drain
Left Drain Type Area Name Area Drain Type Drain Area Name Area Left Drain Right Drain Volume Volume
(m) (m) (m2) (m2) (m2) (m2) (m2) (m2) (m3) (m3)
0+000.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0+020.00 20.000 0.000 0.000 0.000 0.000 0.000 0.000
0+040.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+060.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+080.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+100.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+120.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+140.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+160.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+180.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+200.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+220.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+240.00 20.000 0.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000
0+260.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+280.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+300.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+320.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+340.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+360.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+380.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+400.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+420.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+440.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+460.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+480.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+500.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000
0+520.00 20.000 UDRAIN-B 0.000 0.000 0.000 0.000 0.000 0.000