BILL OF QUANTITY (BOQ)

PROYEK THE AYOMA APARTEMENT

PEKERJAAN : REKAPITULASI ME
LOKASI : Serpong - BSD
AREA : PODIUM , WEST & EAST TOWER - THE AYOMA

TOTAL HARGA SELURUH


NO. URAIAN PEKERJAAN VOL SATUAN
(Rp)

REKAPITULASI :
PRELIMINARIES 1.00 Lot 2,273,500,000

1 PEKERJAAN AIR CONDITIONING DAN VENTILASI MEKANIK 1.00 Lot 12,021,205,620

2 PEKERJAAN AIR BERSIH 1.00 Lot 8,211,880,775

PEKERJAAN AIR KOTOR, AIR KOTOR KITCHEN, AIR KOTORAN,


3 1.00 Lot 9,255,052,647
VENT & AIR HUJAN

4 PEKERJAAN ELEKTRIKAL 1.00 Lot 29,585,427,123

5 PEKERJAAN SEWAGE TREATMENT PLANT 1.00 Lot 710,000,000

6 PEKERJAAN PEMADAM KEBAKARAN 1.00 Lot 11,065,381,738

7 PEKERJAAN PEMADAM KEBAKARAN ( FIRE ALARM ) 1.00 Lot 7,527,345,000

8 PEKERJAAN TATA SUARA 1.00 Lot 1,935,597,750

9 PEKERJAAN ELEVATOR 1.00 Lot 9,300,000,000

10 PEKERJAAN GONDOLA TOWER WEST DAN EAST 1.00 Lot 925,500,000

11 PEKERJAAN RAK KABEL ELEKTRONIK 1.00 Lot 930,784,850

12 PEKERJAAN PENANGKAL PETIR TOWER WEST DAN EAST 1.00 Lot 369,325,000

13 WATER FEATURE 1.00 Lot 312,294,100

14 KOLAM RENANG 1.00 Lot 719,837,700

TOTAL PEKERJAAN KESELURUHAN 95,143,132,303

PPN 10% 9,514,313,230

TOTAL PENAWARAN 104,657,445,533

DIBULATKAN 104,657,000,000

Terbilang : Seratus Empat Milyar Enam Ratus Lima Puluh Tujuh Rupiah