REPAIR OF STEEL
BRIDGE
SUPERSTRUCTURE
COURSE OUTLINE
I. Repainting
II. Steel Plate Adding
III. Carbon Fiber Plate Bonding to Steel
IV. Tightening/Retightening of Tension Bolt
V. Special Anti-Corrosion Paint
2
Repair of Steel Bridge Superstructure
I. REPAINTING
3
REPAINTING
4
REPAINTING
TYPE OF REPAINTING
5
REPAINTING
6
REPAINTING
7
REPAINTING
WORK SEQUENCE
8
REPAINTING
REQUIRED MATERIALS
❑ Epoxy Zinc-Rich Primer
❑ Modified Epoxy Polyimide Paint
❑ Polyurethane Paint
❑ Thinner
REQUIRED EQUIPMENT/TOOLS
❑ High-Pressure Water Jet Spray
❑ Water Tank
❑ Generator
❑ Disc Grinder
❑ Sand Blast Machine
❑ Air Compressor
❑ Wire Brush and Scraper
❑ Paint Roller and Paint Brush
9
Repair of Steel Bridge Superstructure
10
STEEL PLATE ADDING
Steel girders, especially those located near sea shores, are highly
susceptible to corrosion often leading to section loss. In order to
restore the strength lost from the section loss, steel plates/angles
are added and connected with high tension bolts.
11
STEEL PLATE BONDING
12
STEEL PLATE BONDING
WORK SEQUENCE
2. Surface 3. Surface
1. Scaffoldings
Preparation Treatment
5. Assembling Flat
6. Epoxy Caulking Plate and Angular 4. Holes for HTB
Plate
13
STEEL PLATE BONDING
REQUIRED MATERIALS
REQUIRED EQUIPMENT/TOOLS
❑ Electric Drill
❑ Fastening Wrench
14
Repair of Steel Bridge Superstructure
15
CARBON FIBER PLATE BONDING TO STEEL
plates in the factory, cut and drill holes for HTB to existing bridge
16
CARBON FIBER PLATE BONDING TO STEEL
17
CARBON FIBER PLATE BONDING TO STEEL
APPLICATION CRITERIA
18
CARBON FIBER PLATE BONDING TO STEEL
WORK SEQUENCE
2. Surface 3. Adjustment of
1. Scaffoldings Preparation of Steel Unevenness with
Plate Putty
6. Squeezing of 4. Application of
5. Carbon Plate
Strip to Entrapped Epoxy Resin for
Bonding
Air Undercoat
19
CARBON FIBER PLATE BONDING TO STEEL
REQUIRED MATERIALS
❑ Epoxy Putty
❑ Carbon Fiber Plate
REQUIRED EQUIPMENT/TOOLS
20
Repair of Steel Bridge Superstructure
IV. TIGHTENING /
RETIGHTENING OF HIGH
TENSION BOLT
21
TIGHTENING/RETIGHTENING OF HIGH TENSION BOLT
22
TIGHTENING/RETIGHTENING OF HIGH TENSION BOLT
23
TIGHTENING/RETIGHTENING OF HIGH TENSION BOLT
APPLICATION CRITERIA
24
TIGHTENING/RETIGHTENING OF HIGH TENSION BOLT
WORK SEQUENCE
2. Surface
1. Remove HTB 3. Fastening HTB
Preparation
25
TIGHTENING/RETIGHTENING OF HIGH TENSION BOLT
REQUIRED MATERIALS
REQUIRED EQUIPMENT/TOOLS
❑ Torque wrench
❑ Electrical Impact Wrench, Special Fastener for HTB
26
Repair of Steel Bridge Superstructure
V. SPECIAL ANTI-CORROSION
PAINT
27
SPECIAL ANTI-CORROSION PAINT
❑ For 24 years, special anti-corrosion paint was applied to maintain
good surface condition of bridges in Japan situated in severely
active environment, subjected to wind-borne sea water spray. It is a
well-recognized material, proven effective based on several
environment tests conducted in Japan. As an example, field tests
conducted for the Shimonoseki Fishing Park in Japan shows that
the structure remains in good condition, without requiring any major
strengthening measures. Currently, it is still subjected to actual field
examination to determine the limit of maximum durability of the
materials, without repainting.
28
SPECIAL ANTI-CORROSION PAINT
29
SPECIAL ANTI-CORROSION PAINT
WORK SEQUENCE
30
SPECIAL ANTI-CORROSION PAINT
REQUIRED MATERIALS
❑ Emulsion
❑ Compound
REQUIRED EQUIPMENT/TOOLS
❑ Hand Mixer
❑ Paint Roller and Paint Brush
❑ Wire Brush, Electric Grinder
❑ Portable Generator
31