Item MAIN ACTIVITY SUB ACTIVITY Insulation resistance of Core and windings Winding resistance test for HV and MV side Ratio / vector group Automatic voltage regulator test (AVR) Neutral CTs (refer to CT tests) 1 Main Power Transformers Complete functional tests of cooling equipment and tap-change equipment, including manual/automatic sequences, indications, alarms and interlocks
secondary wiring shall be checked for tightness
Cable termination point to point check (continuity test) G PLAN Starting Date ( ) DETAILS to be performed to be performed to be performed shall be performed with a package to be performed shall be performed with a package