Professional Documents
Culture Documents
Zinc-Nickel Electroplating Process: Alternative To Plating: A New
Zinc-Nickel Electroplating Process: Alternative To Plating: A New
)
?DF 83Q686
A New Zinc-Nickel
Electroplating Process:
Alternative to Cadmium Plating
Grace F. Hsu
Boeing Materials Technology
Boeing Commercial Airplane Co.
Seattle, WA
7
Porous Cyanide Cadmium Plating - 1960
*Boeing Proprietary
c. Boeing Zinc-Nickel
Alloy Deposit
b. Cyanide Cadmium-
Titanium Deposit
I Dry I
1
H ydtogen Embrit t lement Relief Bake
I
L
I Chromate Treatment 1
F Cold Water R i n s e
solution at 2 5 W , as shown in Table 1. Data nickel bath is operated outside of the Boeing
indicates the zincnickel coated steel is more established bath parameters.
compatible with 7075 aluminum than the Cd-
Ti coated steel. Galvanic corrosion of
aluminum alloy 7075 coupled to zinc-nickel
coated steel is much less than when coupled to
unexposed Cd-Ti coated st eel. Although t h e
Boeing,Zn-Ni plating
-loo0
-800
SoI uti on
potential
(MVISCEI
\Cd-Ti plating
-dm t \
1
3.5% Na U solution at 25 C
I i
RED WHITE
RUST CORROSION
.. .
. -.. ..
.-
4130 s tee1
Near s c r i b e l i n e
b l i s t e r e d area
(paint removed
Enamel
Primer
4130 Steel
O r i g i n a l mag. 400X
(b) Boeing Zn-Ni Plating - 672 Hours
n
Table 1. The Average Galvanic Current Density? for A1 7075-T6 in 3.5% NaCl ,
-
ig ( A/cmZ)
Coupled To Unexposed 1848 H& 3000 Hrs*
.,
mo- P I
Fracture after specification
minimum
8- - - Fracture
(at indicated time)
Exposure
too-
Time
150
(Hr.)
loo -
Fracture
( a t i n d i c a t e d time)
Instead o f notch,
shank area scratched
(1/4 inch from notch)
both scratched and
m
notch area exposed
I
P
t o water
I
0
ACKNOWLEDGEMENTS REFERENCES
The author thanks Mr. R.C. Colonel for 1. "Cadmium Colloquy," Plating and
his valuable suggestions and Dr. J.H. Jones and Surface Finishing, Nov. 1979, pp. 8-14.
Mr. P.O. Saelid for their excellent technical 2. R.E. Marce, "Cadmium Plating
guidance. Still a Must," Industrial Finishing, April 1978,
pp. 34-37.
3. P, Baeyens, "No More Cadmium
APPENDIX Plating, Are There Processes to Replace It,"
Galvanotechnik, s, 7 (1977), pp. 590-597
(from German), U.S. Department of
Licensing of this process will be
available after successful completion of Commerce, National Technical Information
manufacturing feasibility. For information Service, Nov. 1978.
concerning Licensing, contact Mr. B.A. 4. V.C.R. McLoughlin, "The
Donahue (206-394-3101) or Mr.R.E. Suter (206- Replacement of Cadmium for the Coating of
394-3100). MaiIing address: Patents and Fasteners in Aerospace Applications,"
Licensing, Boeing Commercial Airplane Co., Transactions of the Institute of Metal
P.O. BOX 3707, MS 9H-82, Seattle, WA 98124 Finishing, vol. 57, 1979, pp. 102-104.
5. E.J. Dyckman, "Cadmium 22. S. Ia. Popov, Proceeding Fourth
Utilization and Environmental Impact," Convention on Electrochemistry, Acad. Sci.
Defense Industrial Resources Support Office, US3.R. Press, 1959.
June 26, 1975. 23. G.B. Rynne, U.S. Patent No.
6. W.L. Cotton," Hydrogen Embrittle 4,2a5,802,i981.
ment of High Strength Steels During 24. L. Domnikov, "Zinc-Nickel Alloy
Cadmium, Chromium and Electroless Nickel Electroplated Coatings," Metal Finishing, Aug.
Plating," Plating, vol. 47, Feb. 1960, pp. 169- 1963, pp. 49-54.
175. 25. V.A. Averkin, "Electrodeposition of
7. H.J. Read, "Hydrogen Alloys," Israel Program for Scientific
Embri t tlement in Metal Finishing," Reinhold Translation, Jerusalem, 1964, pp. 102-115.
Publishing Corporation, 1961. 26. ASTM F519, "Standard Method for
8. W. Beck, E.J. Jankowsky, and P. Mechanical Hydrogen Embrittlement Testing
Fischer, "Hydrogen Stress Cracking of High of Plating Processes and Aircraft Maintenance
Strength Steels," center report NADC-MA- Chemicals,"
7140, Naval Air Development Center, 27. K.B. Das, "An Ultrasensitive
Warminster, Pennsylvania, 1'971. Hydrogen Detector," Hydrogen Embrittlement
9. A.W. Thompson, "Metallurgical Testing, ASTM STP 543, American Society for
Characteristics of Hydrogen Embrittlement," Testing and Materials, 1974, pp. 106-123.
Plating and Surface Finishing, Sept. 1978, pp. 28. F. Mansfeld, D.H. Hengstenberg,
36-44. and J.V. Kenkel, "Galvanic Corrosion of 41
10. "Alternatives to Cadmkr?, P l S t k c Alloys, I. Effect of Dissimilar Metal,"
Reflections Five Y e a r s Later," Plating and Corrosion, vol. 30, no. 10, Oct. 1974, pp. 343-
Surface Finishing, Nov. 1982, pp. 21-13, 353.
11. E.P. Cornwall, "Alternatives to 29. E,R. Fannin, "Ion Vapor Deposited
Cadmium Plating," Boeing Document. March Aluminum Coatings for Improved Corrosion
1979. Protection," MCAIR No. 78407, presented at
12. D.M. Erlwein, "Environmental AGARD Meeting, Florence, Italy, Sept. 26-28,
Effect on Notched Tensile Specimens," Boeing 1978.
Progress Report, 1962.
13. J.G. Rinker and R.F. Hochman,
"Hydrogen Embrittlement of 4340 Steel as a
Result of Corrosion of Porous Electroplated
Cadmium," Corrosion, vol. 28, June 1972, pp.
231-232.
14. D. Altura, "Postplating
Embrittlement," Metal Finishing, Sept. 1974,
pp. 45,46,50.
15. K. Takada, US. Patent No.
3,083,150, 1963.
16. K. Takada, US, Patent No.
3,139,325, 1964.
17. SS. Wang, J.K. Chai, Y.M. Shui
and J.K. Liang, "Cd-Ti Eletrodeposits from a
Noncyanide Bath," Plating and Surface
Finishing, Dec. 1981, pp. 62-64.
18. C.B. Jacobs, "Some Observations
on the Deposition of Alloys from Mixed
Solutions," J. Am. Chem. SOC.27, 1905, pp.
972-976.
19. D.H. Schantz, US. Patent No.
2,419,231, 1947.
20. E.J. Roehl, U S . Patent No.
3,420,754, 1969.
21. E.J. R o d and R.H. Dillon, U.S.
Patent No. 3,558,442, 1971.
1 SCOPE
a. This specification establishes t h e requirements for the electro-deposition of zinc-nickel
alloy plating.
b. Do not plate steels heat treated to strength levels above 220 ksi (1510 MPa). For steels
which are heat treated to strength levels above 220 Ksi (1510 MPa), contact Liaison
Engineering.
c. Plating in accordance with this specification is compliant with AMs 2417.
d. Zinc-nickel alloy plating is considered a substitute for BAC 5701, cadmium plating and
QQ-P-4 16.
2 CLASSIFICATION
This process specification consists of the following Types, Classes, Grades, etc., as specified.
2.1 TYPE (POST-PLATE TREATMENT)
a. -
Type I As plated (no supplementary treatment)
..
b. Type 11 - with supplementary treatment
2.2 CLASSES (THICKNESS)
a. Class 1 - 0.0005 inch (13 pm) thick minimum
b. Class 2 - 0.0003 inch (8 pm) thick minimum
c. Class 3 - 0.0002 inch (5 pm) thick minimum
This process and bath are covered by U.S. Patent 4,765,871 and corresponding foreign
patents and/or applications. Articles made by this process are covered by U.S. Patent
4,765,871, U.S.Patent 4,818,632 and corresponding foreign patents and/or applications.
Patent licenses are available. For further information contact: Chief Patent Counsel,
Boeing Commercial Airplanes, P. 0. Box 3707, Mail Stop 6Y-25,Seattle, Washington,
98124. U.S.A.
3 REFERENCES
The current issue of the following documents shall be considered a part of this specification to the
extent herein indicated.
ASTMB 117 Standard Method of Salt Spray (Fog) Testing
ASTM B 374 Standard Definitions of Terms Relating to Electroplating
’ BAC 5034 Temporary Protection of Production Materials, Parts and Assemblies
BAC 5408 Vapor Degreasing
BAC 5617 Heat Treatment of Alloy Steels
BAC 5619 Heat Treatment of Corrosion Resistant Steel
BAC 5625 Surface Treatments for Ferrous Alloys
BAC 5744 Manual Cleaning (Cold Alkaline, Solvent Emulsion and Foam Cleaners)
BAC 5746 Nickel Plating (Electrodeposited)
BAC 5748 Abrasive Cleaning, Deburring, and Finishing
BAC 5749 Alkaline Cleaning
BAC 5750 Solvent Cleaning
BAC 5751 Cleaning, Descaling and Surface Preparation of Ferrous Alloys
BAC 5763 Emulsion Cleaning (Immersion and Spray)
BAC 5771 Stripping Inorganic Finishes
BSS 7217 Air Cleanliness, Shop Compressed Air
BSS 7235 Adhesion Test Method, Plating
4 CONTENTS
Section Subject Page
1 SCOPE 1
2 CLASSIFICATION 1
2.1 TYPE (POST-PLATE TREATMENT) 1
2.2 CLASSES (THICKNESS) 1
3 REFERENCES 2
4 CONTENTS 2
5 MATERIALS CONTROL 4
6 FACILITIES CONTROL 6
6.1 GENERAL NOTES 6
6.2 PRECONDITIONING O F PLATING TANK 7
AND FILTER SYSTEM
6.3 ZINC AND NICKEL ANODE PRETREATMENT 7
7 DEFINITIONS 8
8 MANUFACTURING CONTROL 8
8.1 GENERAL NOTES 9
8.2 FLOW CHART 10
8.3 CLEANING PRIOR TO MASKING 11
4 CONTENTS (Continued)
Section Subject Page
8.4 MASKING AND RACKING 11, '
BA
563
PAGE 3
5 MATERIALS CONTROL
Equivalent materials may be used provided that they meet all t h e requirements of this
specification. Approval from Boeing Materials Technology is required prior to use.
MATERIAL SOURCE
a. Abrasive Materials
(1) Pumice Open
(2) Tripoli Powder Open
(3) Silicon Carbide Abrasive Paper Open
(4) Scotch-Brite Pads, No. 744B,Silicon Carbide 3M Company, St. Paul,
Minn.
b. Ammonium chloride, (plating grade) free of 3M Company, or other
humectants, anti-caking agents or organic additives plating
...
SUPPlY
C. Ammonium hydroxide (aqua ammonia), 28 percent, Open
technical
d. Anodes
(1) Platinium plated titanium Open
(2) Nickel anodes, 99 percent nickel rolled depolarized, Open
or carbon-nickel cast and rolled.
(3) Platinum wire Open
(4) Zinc anodes, high purity, ASTM B 6 (99.9 percent), Open
slab
e. Anode bags, Dynel or polypropylene Open
f. Anode hooks, titanium or monel Open
BAC
5637
PAGE4 OF2
RFVISED:
- ~ ~~~ ~-
I PAGE 5
563
-
6 FACILITIES CONTROL
6.1 GENERAL NOTES
a. All surfaces of the plating tank, filter and associated plumbing which are in continuous
contact with the plating solution shall be made of, or lined with, one of the following
materials:
(1) rigid polyvinyl chloride or polyvinyl dichloride
(2) unfilled polyethylene or polypropylene.
It is recommended to cover the tank, when idle, with one of the above materials.
NOTE: Mold releases on plastics are detrimental to the plating bath, and should not be
used when the tanks a r e fabricated.
b. If filtration is used, the filter shall have sufficient capacity to turn the solution over one to
two tank volumes per hour. Filtration shall b e through a 50 micron or finer polypropylene
or Dyne1 cloth filter (Section 5j.). Diatomaceous earth (Section 5k.) may be used as a filter
media.
C. The plating tank shall be equipped with a temperature indicating and controlling device(s),
if required, to maintain the temperature within Table I requirements.
d. The plating solution should be agitated to minimize temperature and concentration
gradients. The maximum temperature gradient measured from the hottest to the coldest
points in t h e bath shall not exceed 10 F (6 C).
e. Air used for solution agitation or for drying parts shall be free of oil, water, or solid
particles when tested in accordance with BSS 7217.
f. Power supplies shall have sufficient capacity to deliver the required current at the
minimum and the maximum anticipated plating tank loads without current interruption
during a strike or plating operation. T h e power supplies shall be capable of producing DC
current having less than ten percent ripple (100 times AC voltage divided by DC voltage)
over the desired plating range.
g. The power supply control panel shall be equipped with an ammeter that is readable and
+ 5 percent of the current over the desired plating range.
accurate within -
6.2 PRECONDITIONING OF PLATING TANK AND FILTER SYSTEM
* * * 1 * 1 * 8 *
a. Fill tank with 1 oz/gal (7.5 g/l) sodium hydroxide (Section 5v.) solution.
b. Heat solution to 140 F (60 C) minimum and operate pump, heat exchanger, and filter
system for 6 hours minimum.
C. Remove and discard the solution and rinse the tank thoroughly with water.
d. Fill tank with approximately 3 percent by volume hydrochloric acid (Section 5n.) and
approximately 0.1 percent by volume BO€-NIZ additive LHE (Section 5g.)
e. Operate the pump, heat exchanger, and filter system for 6 hours minimum at ambient
temperature.
f. Allow the above leaching solution to stand an additional 24 hours minimum at ambient
temperature.
g* Remove and discard t h e solution and rinseThe tank thoroughly with water.
h. New or contaminated anode bags (Section 5e.) shall be treated in the above caustic and ac
solutions to leach out any organic contaminants.
6.3 ZINC AND NICKEL A N O D E PRETREATMENT
a. Manual solvent clean in accordance with BAC 5750, vapor degrease in accordance with
BAC 5408 or emulsion clean in accordance with BAC 5763. Anodes shall be completely c
prior to further processing.
b. Dry abrasive blast clean in accordance with BAC 5748, Type 11, Class 1.
C. Insert the anodes (Section 5d.(2) and Section 5.d.(4)) in the leached anodes bags
(Section 5e. and Section 6.2h). Immerse the clean zinc and nickel anodes in the zinc-an@
pretreatment solution (Xable IV)for 2 to 3 hours to allow the formation of a dark-gray fii
on the surfaces.
d. Cold water immersion rinse. Handle the anodes carefully to prevent damaging the sok,
dark-gray film on the anodes. Transfer the anodes to the zinc-nickel plating bath.
NOTE: If the anodes become contaminated o r are stored outside of the plating bath
a prolonged period of time (e.& one month or longer) reconditioning in
accordance with the above procedure may be necessary.
56.
PAGE 7
0 ?_. ,.- REVISED:
DEFINITIONS
The following definitions shall apply to terms which are uncommon or have special meaning as
used in this specification.
Lot - any group of parts of approximately the same size, shape, and basis metal which have been
processed under the same conditions and submitted for inspection at the same time.
Nonfunctional Surface - a surface on which the presence of a slight plating imperfection will not
affect the proper operation of the part.
Plating terms - see ASTM B 374 for standard definitions.
-
Water-break-free a surface which maintains a continuous water film for a period of at least 30
seconds after having been sprayed or immersion rinsed in clean water at a temperature below
100 F (38 C).
MANUFACTURING CONTROL
1 PAGE 8 20
. ._^..C 0 q.l nq REVISED:
8.1 GENERAL NOTES
a. For ferrous alloys, refer to Section 11.1 for stress relief requirements.
b. Unless otherwise specified, the zinc-nickel alloy plating shall be applied after all basis ’
metal heat treatments and mechanical operations (such as machining, brazing, welding,
forming and perforating) have been completed.
C. Surfaces must be water-break-free following any immersion in any processing solution or
rinse, except following vapor degreasing, manual cleaning, emulsion cleaning o r solvent
cleaning. Reclean parts which develop a water break.
d. Auxilliary anodes (such as platinum plated titanium 5d.(l) or platinum wire 5d.(3)) may be
used, as necessary, to meet the thickness requirements of Section 11.3.
e. Place all contacts and electrode connections in a nonfunctional area. When in doubt,
consult the applicable design engineering department.
f. Filtration may be used when necessary to remove particulates from the zinc-nickel plating
bath.
g. When the plating tank is inactive for more than 120 hours, the zinc anodes shall b e
removed from the plating bath. Removal is necessary to prevent degradation of the zinc
anodes. ..
I PAGE 563’i
9 (
8.2 FLOW CHART
(Section 8.4)
7
Corrosion Resistant
Low Alloy Steels Steels Clean and
Clean and Activate Activate
(Section 8.5.1) (Secrion 8.5.2)
- Zinc-Nickel Plating * i
(Section 8.6)
I
I
-
Hydrogen Embrittlement Relief
Bake, As Required
(Section 8.7)
1
Supplemental Treatment
(Section 8.8)
I 1
I
t 1
Quality Control Inspection
(Section 10)
I 1
8.3 CLEANING PRIOR TO MASKING
If parts are greasy or oily, vapor degrease in accordance with BAC 5408, emulsion clean in
accordance with BAC 5763, solvent clean in accordance with BAC 5750, manual clean in ,
'
accordance with BAC 5744 or alkaline clean in accordance with BAC 5749. Descaling in .
accordance with Section 8.5.la. or 8.5.h. may be accomplished prior to or subsequent to masking
(Section 8.4).
8.4 MASKING AND RACKING
OPTIONAL Parts may be masked and racked after Section 8.5.la.(l) provided the abrasively
cieaned surfaces are not contaminated (rusting, soiling or discoloration). If the
surfaces become contaminated, the parts shall be reprocessed in accordance with
Section 8.5.la.
a. Mask area not to be plated using maskants listed in Section 5p.
NOTE: To reduce the effect of shadowing and/or robbing of current, it is recommended
to mask any area of a metal rack, with the exception of the contact points, whick
may be immersed in the pIating solution.
b. Rack parts to prevent entrapment of gases generated during plating, and to facilitate
draining. Make firm electrical connections to the part(s) to prevent arcing. Provide
sufficient contact to carry the required current.
8.5 CLEANING PRIOR TO PLATING
a. Wet processed activated surfaces shall not be allowed to dry prior to immersion in the
zinc-nickel alloy plating bath.
b. Parts which have been masked after descaling may be cleaned, if necessary, in accordance
with BAC 5744 o r BAC 5749 to remove any grease or oil from handling.
8.5.1 LOW ALLOY STEELS
a. Descale by one of the following methods:
(1) Method 1
(a) Abrasive clean in accordance with BAC 5748,Type 11, Class 1 using glass bead or
aluminum oxide abrasive. Use of larger particles (e.g., 80 grit aluminum oxide) to
produce a rougher finish will improve plating adhesion.
@) Alkaline clean and rinse in accordance with BAC 5749. If parts require masking
return to Section 8.4,otherwise, transfer to activating step (Section 8.5.lb.) withir
minute.
(2) Method 2
Descale in accordance with BAC 5625, Method 1, or BAC 5751, Method 1. Wate
rinse thoroughly. If parts require masking, return to Section 8.4, otherwise,
transfer to activating step (Section 8.5.lb.) within 1 minute.
(3) Method 3
Descale in accordance with BXC 5749, Method 3. Water rinse thoroughly. If-pa
require masking, return to Section 8.4, otherwise, transfer to activating step
(Section 8.5.lb.) within 1 minute.
5 6f
PACE 11
8.5.1 LOW ALLOY STEELS (Continued)
b. Activate the surface by one of the following methods:
(1) Method I
(a) Immerse in dilute acid solution (hydrochloric acid or fluoboric acid in accordance
with Section 9.3) for 5 to 30 seconds.
(b) Cold water rinse for 10 to 60 seconds.
(2) Method 2
(a) Anodic clean in Isoprep 58 in accordance with BAC 5749.
(b) Warm water rinse for 1 to 3 minutes.
(3) Method3
(a) Periodic reverse clean in accordance with BAC 5749, Method 3. End with a 15 to
25 second anodic cycle.
(b) Remove smut, if present, by scouring using abrasive material specified in
Section Sa. Rinse thoroughly with water. ..
(C) Continue periodic reverse cleaning until a water-break-free surface is obtained
(typically 2 to 10 minutes).
(d) Cold water rinse for 2 to 3 minutes.
c. Proceed to Section 8.6. Do not allow parts to dry.
8.5.2 CORROSION RESISTANT STEELS
a. Descale by one of the following methods:
(1) Method 1
I (a) Abrasive clean in accordance with BAC 5748, Type 11, Class 1using glass bead or
aluminum qxide abrasive. Use of larger particles (e.g., 80 grit aluminum oxide) to
produce a rougher finish will improve plating adhesion. .
(b) Alkaline clean and rinse in accordance with BAC 5749. If parts require masking,
return to Section 8.4, otherwise transfer to activating step (Section 8.5.2b.) within 1
minute.
(2) Method 2
Descale in accordance with BAC 5625, Method 111, or BAC 5751, Q p e XI, Class 3.
Water rinse thoroughly. If parts require masking, return to Section 8.4, otherwise,
transfer to activating step (Section 8.5.2b.) within 1minute.
b. Activate surface with a Nickel Strike in accordance with BAC 5746.
1 BAC
5637
PAGE 12 OF 20
-
R EVI s ED:
..
~
8.6 ZINC-NICKELPLATING
a. Immerse in zinc-nickel plating solution (Section 9.1) and then apply current at 10 to 40
ASF (1.1 to 4.3 A/dm2)
OPTIONAL Strike parts at a current density of 60 to 90 ASF (6.5 to 9.7 A/dm2) for 15
seconds before regular plating. For CRES steels, nickel strike in
accordance with Section 8.5.2b.(l).
Plate to the required thickness. T h e plating time to apply 0.0005 inch (13 pm) (average) is
estimated to be 40 minutes at a current density of 20 ASF (2.2 A/dm2). (Every 160
ASF-min (17.2 A/dm2 - min) will deposit approximately 0.001 inch (25 pm)).
b. If required, plating may be interrupted for re-racking of parts to obtain 100 percent
coverage. Parts may be removed from the solution for re-racking, but do not allow the
parts to dry.
C. Plate control specimens, when required, with the parts for subsequent adhesion and
corrosion tests as required by Sections 11.4 and 11.5, respectively.
d. Cold water rinse for 1 to 10 minutes.
e. Dry within 5 minutes. A rinse for 1 minute in hot water will facilitate drying.
8.7 HYDROGEN EMBRITTLEMENT RELIEF BAKE
8.7.1 GENERAL
a. Unless otherwise specified, all steel parts requiring baking (See Secrion 8.7.2) shall be
baked within 8 hours after plating to provide hydrogen embrittlement relief. Records shall
be kept to provide evidence that each lot of processing has been properly baked.
b. DO not flex springs prior to baking.
8.7.2 FERROUS ALLOYS PARTS (INCLUDING COIL SPRINGS)
a. Bake ferrous parts within 8 hours following plating according to the drawing. If not
specified on t h e drawing, bake in accordance with the following schedule:
(1) Carburized parts and 440 series CRES: 5 to S hours at 275 -
+ 25 F (135 -
+ 14 C).
(2) Externally threaded parts heat treated from 160 to 220 ksi (1100 to 1500 MPa), all coil
springs regardless of heat treat and all other parts heat treated from 180 to 220 ksi
(1200 to 1500 MPa): 3 hours minimum at 375 - + 25 F (191 -+ 14 C).
(3) PH steels not specified in Section 8.7.2b. shall be baked for 12 hours minimum at 375
+ 25 F (191 -
- + 14 C).
b. The following ferrous alloys do not require baking:
(1) 17-4 PH, 15-5 PH, 17-7 PH; all below 180 ksi (1200 MPa), if nor externally threaded
(2) 17-7 PH (CH900 condition)
(3) A-286
(4) 300 series CRES
( 5 ) All other ferrous alloys with tensile strengths less than 180 ksi (1200 MPa), except as
specified in Section 8.7.2a.(2).
ORIGINAL I S S U E 8 - 2 1- 9 2
I
1
PACE
REV Is ED:
563'
13
.. - .--,.^^. .-,"*
8.8 SUPPLEMENTAL TREATMENTKONVERSION COATING (FOR TYPE I1 ONLY)
a. If there is a delay prior to application of the conversion coating, dry the parts and protect
the plated surface from contamination in accordance with BAC 5034,Type 11, Class 3,
Grade A. (Insure parts are kept dry while in contact with Kraft paper. Wet Kraft paper
can deposit sulfites on the part surface.)
b. If parts have been allowed to dry because of a delay, alkaline clean prior to applying the
conversion coating in accordance with BAC 5749 using a medium duty alkaline cleaner (e.&
15 minute soak in Isoprep 58), and water rinse. Do not allow the surfaces to dry.
c. Immerse part(s) in conversion coating solution (Section 9.2) for 40 to 60 seconds.
d. Immersion rinse in water (130 F maximum (54 C)) for 0.5 to 2 minutes.
e. Within 5 minutes, air dry thoroughly at a maximum of 130 F (54 C). Blowing with
compressed air may be used to facilitate drying.
f. Other conversion coating solutions may be used as a supplemental treatment of they meet
the requirements listed in Section 11 of this specification. However, any solution not
specifically mentioned in this specification must have the prior approval of Boeing
Engineering and Quality Assurance.
8.9 REWORK .. .
The following rework shall be documented as required by the applicable quality assurance
provisions.
a. Parts not meeting the requirements of this specification shall be stripped in accordance
with BAC 5771. Solution 46 or Solution 11.
* * * . . . I . .
BAC
5637
PACE 14 OF 20
REVISED:
O R I G I N A LISSUE: 8 - 2 1- 9 2
9 MAINTENANCE CONTROL
9.1 ZINC-NICKEL PLATING SOLUTION
a. The tank and filter system shall b e preconditioned prior to the initial make-up of the
zinc-nickel plating bath (Section 6.2)
NOTE: Subsequent bath make-ups do not require the tank and filter system to be
preconditioned.
b. Clean tank thoroughly and fill approximately half full with warm water.
C. For each 100 gallons (379 L) of final solution, add the appropriate chemical amounts in the
following order:
(1) 142 pounds (65 kg) of ammonium chloride (Section 5b.). Mix until completeiy
dissolved.
(2) 61 pounds (28 kg) of nickel chloride (Section 5q.). Mix until completely dissolved.
(3) In a separate tank o r container, add 2.5 gallons (9.5 L) of hydrochloric acid
(Section 5x1.) to 0.5 gallons (1.9 L) Of water. Add and dissolve 9.3 Ib (4.2 kg) of zinc
oxide (Section 5x.). Add this solution to the main bath.
(4) 17 pounds (7.7 kg) of boric acid (Section 5h.). Mix until completely dissolved.
d. Fill t h e tank close to operating level with water.
e. Check the pH of the bath. Adjust the pH, if required, to 6.2 to 6.3. Ammonium hydroxide
(Section 5c.) is used to raise the pH, and hydrochloric acid is used to lower the pH.
f. When the bath temperature has cooled to 65 to 85 F (18 to 29 C)
add 3.0 gallons (11.5 L) of BO€-NIZ additive LHE (Section Sg.) per 100 gallons (379 L)of
total solution. Stir the bath thoroughly.
g. Add additional water if necessary. Recheck the p H and adjust to 6.2 to 6.3 if necessary.
h. Before placing a freshly prepared solution into production, dummy plate at 3 to 5 ASF (0.3
to 0.6 A/dm3) for a period of 8 to 12 hours. Analyze and adjust in accordance with Section
9. li.
1. Maintain the plating solution within the ranges specified in Table I and adjust, when
necessary, as prescribed by the Quality Control lab.
NOTE: Organic contamination occurs due to ineffective removal of oils and greases
during the cleaning operation. Treatment with activated carbon (Section 5.) is
usually effective in removing organic contaminants. T h e carbon treatment wil!
also deplete the BOE-NIZ additive. Thus, it must be replenished before
resuming plating.
563'
PAGE 15
ORIGINALISSUE: 8
- . .-
- 2 1- 9 2 REVISED:
9.1
I'emperature 65 to 95 F 75 F
(18 to 35 C) (24 C)
-1/ Remove zinc anodes when the tank is not in use for more than 120 hours.
-2/ Use anode bags with all anodes. Leach new or contaminated bags in accordance with Section 6.2.
9.2 CONVERSION COATING
a. Clean tank thoroughly. Fill tank approximately one-half full of water.
TABLE I1
CONVERSION COATiNG CONTROL
MAKE-UP PER
MATERIAL/ 100 GALLONS 100 LITERS CONTROL
CONDITION
C O L T OIC-A
B~ 75 lbs 9 kg 10 to 13 oz/gal
(75 to 98 g/l)
CorroBan IC-B 1percent by volume 1percent by volume
PH --- + 0.2
1.9 -
Temperature 100 + 5F
(38 F 2 C l
BA(
563’7
PAGE 17
ORIGINAL ISSUE: 8 - 2 1- 9 2 REVISED:
x-?d97 A RFV 5IRS
3.3 DILUTE ACID SOLUTION
Make-up and control t h e bath as indicated in liible 111.
TABLE 111
DILUTE ACID MAKE-UP AND CONTROL
MATERIAL/CONDI- CONTROL
TABLE IV
ANODE PRETREATMENT MAKE-UP AND CONTROL
MAKE-UP PER
MATERIAL/ 100 GALLONS 100 LITERS CONTROL
ZONDITION
Ammonium Chloride 208 lbs 25 kg 30.7 to 36 oz/gal
(230 to 270 g/l)
(Section 5b.)
1 PAGE 18 OF ZO
REVISED: .
ORlGlNAL 1SSUE: 8 - 2 1 - 92
3.3 PROCESS WATERS
9.5.1 MAKE-UP WATER
Water used for solution make-up shall not contain more than 100 ppm total solids.
9.5.2 RINSE WATER
Control the total solids in the rinse water to 500 ppm maximum.
10 QUALITY CONTROL
a. Monitoring of the process and examination of end-items shall be in accordance'with the
applicable Quality Assurance provisions which assure the requirements of this specification
are met. --
b. Testing shall be done with sufficient frequency to ensure compliance with the requirements
of this specification.
c. Analyze the solutions at intervals that have been determined through experience.
Prescribe and record any changes that are necessary for compliance with this specification.
11 REQUIREMENTS
11.1 STRESS RELIEF
a. The plater must receive written verification from the parts fabricator that all stress
relieving has been accomplished in accordance with Section 1l.lb. and 11.1~.
b. Ferrous alloy parts, heat treated to 180 Ksi (1240 MPa) (160 Ksi (1100 MPa) for externally
threaded parts) or higher, shall be stress relieved prior to plating if they have been
subjected to any of the following operations after heat treatment: Grinding, machining,
straightening, cold working, or proof loading. Parts which only have been honed, lapped, or
shot peened do not require stress relief. When stress relief is required for parts it shall be
performed in accordance with BAC 5617 and BAC 5619.
c. If more than one plating operation (including different plating or re-plating) is performed
on the parts, stress relief shall be accomplished only once.
11.2 WORKMANSHIP
a. The zinc-nickel deposit shall be smooth, fine-grained, adherent and visibly free from
blisters, pits which expose the substrate, nodules, porosity, excessive edge buildup,
indications of burning and other defects when visually inspected without magnification.
Uniformity of color is not required.
b. The Type I1 supplemental treatmentkhromate conversion coating shall be continuous,
smooth. adherent. and free from powder. Loose coating which can be wiped off with a
clean cloth. exposing bare plating, is unacceptable.
113 THICKNESS
~
'fl
a. Unless otherwise specified, the zinc-nickel ailoy plating thickness shall be Class 1 for all
hardware, except fastener hardware shall be Class 2.
b. Part surfaces designated on the drawing shall be completely covered with visible Zinc-nickel
alloy plating, within the capability of t h e throwing power of the plating solution. Unless .
otherwise specified, measurements of plating thickness apply only to those surfaces which ' '
can be touched by a ball 0.75 inch (1.9 cm)in diameter.
c. Unless otherwise specified, the maximum thickness shall not exceed 0.0010 inch (25 pm).
11.4 ADHESION
- The deposit shall be firmly adherent wbcn tested in accordance with BSS 7235 after baking and
supplemental treatment, if required, is completed.
--
11.5 CORROSION RESISTANCE
Zinc-nickel alloy plating with the 'Qpe II supplemental treatment shall show neither white
corrosion products of zinc nor base metal corrosion products at the end of 96 hours when tested in
accordance with Asiu B 117. The appearance of corrosion products, visible to the unaided eye
at norma1 reading distance, shall be a cause for rejection, except that white corrosion products
within 0.25 inch (0.64 an)from the edges of the specimens shall not constitute failure.
11.6 T E S T SPECIMENS
Test specimens may be used in lieu of parts provided they are processed in the same manner as the
parts they represent. For corrosion tests, low-carbon steel test specimens may be used to
represent low-alloy steel parts. For other than low-alloy steel parts, corrosion test specimens may
be of a generically similar material.
BAC
5637
PACE 20 OF 2(