Basic Price 2022 Sem I
Basic Price 2022 Sem I
1 2 3 4 5 6 7 8
A. UPAH TENAGA KERJA
1 Mandor Orang/Hari 189,750.00 189,750.00 189,750.00 189,750.00 189,750.00 189,750.00
2 Tukang Gali Tanah Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
3 Kepala Tukang Batu Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
4 Tukang Batu Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
5 Laden Tukang Batu Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
6 Kepala Tukang Kayu Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
7 Tukang Kayu Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
8 Laden Tukang Kayu Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
9 Kepala Tukang Besi Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
10 Tukang Besi Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
11 Laden Tukang Besi Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
12 Kepala Tukang Cat Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
13 Tukang Cat Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
14 Laden Tukang Cat Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
15 Penjaga Malam Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
16 Mekanik Orang/Hari 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00
17 Operator Terlatih Orang/Hari 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00
18 Operator Kurang Terlatih Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
19 Pembantu Operator Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
20 Sopir Material / Truk Orang/Hari 137,454.00 137,454.00 137,454.00 137,454.00 137,454.00 137,454.00
21 Sopir Personil Orang/Hari 114,545.00 114,545.00 114,545.00 114,545.00 114,545.00 114,545.00
22 Pembantu Sopir / Knek Orang/Hari 96,250.00 96,250.00 96,250.00 96,250.00 96,250.00 96,250.00
23 Buruh Tak Terlatih Orang/Hari 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00
24 Buruh Lapangan Agak Terlatih Orang/Hari 112,500.00 112,500.00 112,500.00 112,500.00 112,500.00 112,500.00
25 Buruh Lapangan Terlatih Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
26 Tukang Listrik Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
27 Tukang Las Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
28 Tukang Pancang Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
29 Tukang Tebas Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
30 Tukang Anyam Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
HARGA SATUAN PER KECAMATAN DALAM R
1 2 3 4 5 6 7 8
B. BAHAN BANGUNAN
II BAHAN PEREKAT -
1 Semen PC ( isi 40 Kg / zak) Kg 1,545.00 1,545.00 1,574.00 1,681.00 1,696.00 1,581.00
2 Semen PC ( isi 40 Kg / zak) Holcim Kg 1,236.00 1,365.00 1,365.00 1,401.00 1,401.00 1,265.00
3 Aspal Ac Pen 60/70 Kg 17,772.00 18,922.00 20,072.00 21,222.00 21,222.00 18,922.00
4 Aspal Emulsi Kg 11,859.00
5 Cold Paving Hot Mix Asbuton (CPHMA) Kg 2,665.00
6 Aspal Cold Mix Kg 2,544.00
7 Semen Putih (isi 40 Kg) Kg 3,953.00 3,953.00 4,312.00 4,025.00 4,025.00 4,168.00
8 Semen Warna Kg 25,875.00 23,000.00 23,000.00 23,000.00 23,000.00 20,125.00
9 Perekat Bata Ringan Kg 3,018.00 - - - - 4,312.00
IV BAHAN KAYU -
1 Balok Kayu Ulin 5/10, 10/10 m3 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 12,396,494.00
2 Balok Kayu Ulin 5/7 m3 14,734,516.00 14,734,516.00 14,734,516.00 14,734,516.00 14,734,516.00 14,529,870.00
3 Balok Kayu Ulin 5/5 m3 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 13,105,413.00
4 Papan Kayu Ulin 2/20 m3 18,507,755.00 18,507,755.00 18,507,755.00 18,507,755.00 18,507,755.00 17,153,529.00
5 Balok Kayu Kl.I m3 8,736,942.00 8,736,942.00 8,736,942.00 8,736,942.00 8,736,942.00 8,736,942.00
6 Balok Kayu KI.II m3 5,824,628.00 5,824,628.00 5,824,628.00 5,824,628.00 5,824,628.00 5,824,628.00
HARGA SATUAN PER KECAMATAN DALAM R
1 2 3 4 5 6 7 8
7 Balok Kayu KI.III m3 2,961,250.00 2,961,250.00 2,961,250.00 2,961,250.00 2,961,250.00 3,094,333.00
8 Papan Kayu Kl.I m3 9,756,251.00 9,756,251.00 9,756,251.00 9,756,251.00 9,756,251.00 10,382,399.00
9 Papan Kayu KI.II m3 5,970,243.00 5,970,243.00 5,970,243.00 5,970,243.00 5,970,243.00 6,319,721.00
10 Papan Kayu KI.III m3 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,946,875.00
11 Papan Bagesting m3 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,961,250.00
12 Kayu Dolken/Galam Dia. 6-8 cm btg 14,375.00 14,375.00 14,375.00 14,375.00 14,375.00 12,650.00
13 Kayu hutan untuk Galar/Knopel Dia 8-10 cm btg 18,974.00 18,974.00 18,974.00 18,974.00 18,974.00 18,400.00
14 Kayu Utk Galar/Knopel 10-12 cm btg 24,725.00 24,725.00 24,725.00 24,725.00 24,725.00 21,850.00
15 Kusen Kayu Ulin 5/10 Uk. Pasaran (Meubelair) M' 71,875.00 71,875.00 71,875.00
16 Kusen Kayu Ulin 6/12 Uk. Pasaran (Meubelair) M' 120,750.00 120,750.00 120,750.00
17 Kusen Kayu Kls I 5/10 Uk. Pasaran (Meubelair) M' 54,625.00 54,625.00 54,625.00
18 Kusen Kayu Kls I 6/12 Uk. Pasaran (Meubelair) M' 83,375.00 83,375.00 83,375.00
V BAHAN PELAPIS : -
1 Plywood 3 mm lbr 70,150.00 73,216.00 80,500.00 81,650.00 81,650.00 69,000.00
2 Plywood 4 mm lbr 83,375.00 85,100.00 92,000.00 93,150.00 93,150.00 92,000.00
3 Plywood 6 mm lbr 110,016.00 106,950.00 120,750.00 121,900.00 121,900.00 109,250.00
4 Plywood 9 mm lbr 142,600.00 143,750.00 172,500.00 166,498.00 166,498.00 149,500.00
5 Lampit Rumbia lbr - - - - - -
6 Plastik Cor m2 2,714.00 - 2,875.00 2,990.00 2,990.00 2,645.00
1 2 3 4 5 6 7 8
17 Seng Plat Bjls.30 ( 180 x 0.20 ) Lbr 65,688.00 66,010.00 66,010.00 68,264.00 68,264.00 66,010.00
18 Seng Aluminium Tebal 0,4 Lbr 115,000.00 108,445.00 120,750.00 112,148.00 112,148.00 108,445.00
19 Spandeck /Atap Zincalumn Lbr 57,500.00 58,650.00 60,375.00 61,065.00 61,180.00 58,075.00
20 Kalsiplank Lbr - - - - - -
21 Nusaplank Lbr 74,750.00 - - - - 71,875.00
X BAHAN FINISHING : -
1 Cat Kayu Mengkilap Ltr/Kg 58,650.00 63,250.00 60,375.00 80,500.00 77,050.00 74,750.00
2 Cat Kayu Dasar Kg 57,500.00 33,649.00 40,250.00 66,971.00 66,971.00 48,875.00
3 Plamir Kayu Ltr/Kg 80,500.00 - 51,750.00 - - 74,750.00
4 Cat Meni Ltr/Kg 44,562.00 40,446.00 40,446.00 41,828.00 41,828.00 51,750.00
5 Dempul Kayu Ltr/Kg 36,800.00 37,950.00 40,250.00 41,400.00 41,400.00 51,750.00
6 Ampelas Lembar 17,825.00 9,200.00 10,350.00 11,146.00 11,146.00 10,350.00
7 Cat Tembok Setara Jotun Interior Kg 132,250.00 - - - - 132,250.00
8 Cat Tembok Setara Jotun Eksterior Kg 161,000.00 - - - - 161,000.00
9 Cat Interior kw 2 Ltr/Kg 46,000.00 47,150.00 48,300.00 51,750.00 52,037.00 51,750.00
10 Cat Tembok Eksterior kw 2 Ltr/Kg 69,000.00 69,000.00 69,000.00 69,000.00 71,875.00 69,000.00
11 Plamir Tembok Ltr/Kg 23,000.00 23,112.00 23,112.00 23,567.00 23,567.00 23,112.00
12 Lem Kayu Kg 17,825.00 20,700.00 18,400.00 23,000.00 23,000.00 21,850.00
13 Dempul Kayu Kg 36,800.00 37,950.00 40,250.00 41,400.00 41,400.00 51,750.00
14 Minyak Cat Liter 32,775.00 32,935.00 34,500.00 34,060.00 34,060.00 63,250.00
15 Residu Liter 21,700.00 21,806.00 28,750.00 22,551.00 22,551.00 21,806.00
XI BAHAN SANITARI -
1 Wastafel w. American Standar Buah 492,660.00 495,075.00 517,500.00 511,980.00 511,980.00 495,075.00
w. TOTO Buah - - - - -
2 Kloset duduk kd. American Standar Buah 1,840,000.00 2,357,500.00 2,357,500.00 2,438,000.00 2,438,000.00 2,357,500.00
kd. TOTO Buah - - - - -
3 Kloset Jongkok kj. American Standar Buah 345,000.00 323,578.00 402,500.00 345,000.00 345,000.00 402,500.00
kj. TOTO Buah - - - - -
4 Urinoir u. American Standar Buah 465,681.00 467,963.00 467,963.00 483,943.00 483,943.00 467,963.00
u. TOTO Buah - - - - -
5 Bak mandi Fibre 50 x 50 segiempat Kecil Buah 492,660.00 495,075.00 495,075.00 511,980.00 511,980.00 495,075.00
6 Bak Mandi Fibre 70 x 70 Sudut Buah 667,000.00 675,423.00 675,423.00 698,487.00 698,487.00 675,423.00
7 Bak Mandi Fibre 70 x 70 Segiempat Besar Buah 699,108.00 702,535.00 702,535.00 726,524.00 726,524.00 702,535.00
8 Shower Buah 86,250.00 - 143,750.00 - - 143,750.00
9 Floordrain Buah - - - - - 23,000.00
HARGA SATUAN PER KECAMATAN DALAM R
1 2 3 4 5 6 7 8
10 Tempat Sabun Buah 63,250.00 - - -
11 Kran Air 1/2" Buah 16,100.00 16,100.00 - - 21,850.00
12 Kran Air 3/4" Buah 18,400.00 17,250.00 - - 23,000.00
13 Kitchenzink Buah - - - - - 230,000.00
14 Kran dinding Ex. Toto Buah 299,000.00 299,000.00 299,000.00 299,000.00 299,000.00 299,000.00
15 Septictank Ulin Buah - - - - - 460,000.00
16 ijuk (kg) Kg 14,076.00 14,076.00 14,076.00 14,076.00 14,076.00 14,216.00
1 2 3 4 5 6 7 8
XV PERPIPAAN -
1 Cleam Sadle Ø 4" x 1/2 " Bh 172,500.00 - - - - -
2 Cleam Sadle Ø 3" x 1/2 " Bh 138,000.00 - - - - -
3 Elbow Sock PE Ø 1/2" Bh 28,750.00 - - - - -
4 Pipa PE Ø 1/2" M' 10,350.00 - - - - -
5 Mild Adaptor PE Ø 1/2" Bh 23,000.00 - - - - -
6 Knee GI Ø 1/2 " Bh 9,391.00 - - - - -
7 Doble Niple Ø 1/2 " Bh 13,512.00 - - - - -
8 Reduser GI Ø 3/4 " x 1/2 " Bh 34,500.00 - - - - -
9 Water Meter Ø 1/2" Bh 343,850.00 - - - - -
10 Stop Kran Ø 1/2" Bh 23,000.00 - - - - -
11 Knee DD PVC Ø 1/2" Bh 5,175.00 - - - - -
12 Elbow PVC Ø 1/2" Bh 5,175.00 - - - - -
13 Dop PVC Ø 1/2" Bh 6,900.00 - - - - -
14 Pipa PVC Ø 1/2" M' 17,633.00 - - - - -
15 Atap Kran Ø 1/2" Bh 37,950.00 - - - - -
16 Reduser All Socket PVC / RR 4" x 2" Bh 144,087.00 - - - - -
17 Reduser All Socket PVC / RR 6" x 4" Bh 328,995.00 - - - - -
18 Tee PVC / RR 2" Bh 92,000.00 - - - - -
19 Tee All Socket PVC / RR 6" x 4" Bh 1,061,450.00 - - - - -
20 Reduser GI Ø 4" x 1/2" Bh 364,955.00 - - - - -
21 Gate Valve CI 2" Bh 715,300.00 - - - - -
22 Gate Valve CI 4" Bh 1,437,500.00 - - - - -
23 Gate Valve CI 6" Bh 2,395,450.00 - - - - -
24 Dop PVC Ø 2" Bh 11,500.00 - - - - -
25 Dop PVC Ø 4 " Bh 18,400.00 - - - - -
26 Elbow PVC Ø 3 " 90° Bh 17,250.00 - - - - -
27 Box Meter Plat Bh 86,250.00 - - - - -
28 Pipa HDPE Ø 63 mm/2" SDR-17 (PN 10) M' 73,938.00 - - - - -
29 Pipa HDPE Ø 90 mm/3" SDR-17 (PN 10) M' 123,051.00 - - - - -
30 Pipa HDPE Ø 110 mm/4" SDR-17 (PN 10) M' 175,723.00 - - - - -
31 Pipa HDPE Ø 160 mm/6" SDR-17 (PN 10) M' 339,859.00 - - - - -
32 Pipa HDPE Ø 200 mm/8" SDR-17 (PN 10) M' - - - - - -
33 Pipa HDPE Ø 250 mm/10" SDR-17 (PN 10) M' - - - - - -
34 Pipa HDPE Ø 315 mm/12" SDR-17 (PN 10) M' - - - - - -
35 Pipa HDPE Ø 355 mm/14" SDR-17 (PN 10) M' - - - - - -
36 Pipa Leiding 1/2 (Gi) Btg 38,668.00 - - - - -
37 Pipa Leiding 3/4 (Gi) Btg 48,443.00 - - - - -
38 Pipa Leiding 1 (Gi) Btg 57,500.00 - - - - -
39 Pipa Leiding 1 1/2 (Gi) Btg 94,875.00 - - - - -
1 2 3 4 5 6 7 8
CATATAN :
* Harga satuan upah dan bahan ini akan di tinjau setiap 6 (enam) bulan
* Harga satuan upah merupakan batas tertinggi dan bahan merupakan rata-rata pada tiap region ini untuk wilayah Kabupaten Pulang Pisau
* Harga satuan upah dan bahan pada tiap region ini sudah termasuk overhead keuntungan, belum termasuk PPn
* Harga satuan BBM pada tiap region berfluktuatif
* Harga satuan upah dan bahan yang belum ada dalam daftar ini, disesuaikan harga pasar yang berlaku pada saat itu.
Mengetahui,
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kepala Bidang Sumber Daya Air Kepala Bidang Bina Marga Kepala Bidang Cipta Karya
Kabupaten Pulang Pisau
Dr. USIS I. SANGKAI S.Hut M.SI ELENA FRANSISCA, ST., MT. DENNY EKO SETYADI, ST., MT. TITIEN MARIA, ST
NIP. 19750118 199903 1 006 NIP. 19760217 200501 2 008 NIP. 19780119 200604 1 009 NIP. 19701031 200501 2 005
HARGA SATUAN PER KECAMATAN DALAM RUPIAH
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13
3,027,314.00 4,368,471.00 4,368,471.00 3,084,814.00 4,483,471.00
9,580,020.00 8,802,682.00 8,802,682.00 9,637,520.00 8,805,182.00
5,939,628.00 6,552,706.00 6,552,706.00 5,997,128.00 6,667,706.00
3,027,314.00 4,368,471.00 4,368,471.00 3,220,000.00 4,483,471.00
2,961,250.00 3,162,500.00 3,162,500.00 3,220,000.00 3,450,000.00
12,650.00 12,650.00 12,650.00 13,800.00 13,800.00
18,400.00 18,400.00 18,112.00 18,975.00 23,000.00
21,850.00 21,850.00 23,000.00 23,000.00 28,750.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
34,776.00 34,776.00 43,700.00 35,420.00 43,700.00
49,680.00 49,680.00 51,750.00 50,600.00 55,200.00
60,585.00 60,585.00 63,250.00 61,707.00 67,317.00
- - - - -
- - - - -
- - - 172,500.00 -
- - - - -
- - - - -
33,062.00 33,062.00 33,637.00 34,545.00 32,775.00
17,250.00 17,250.00 20,700.00 17,250.00 20,700.00
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13
69,552.00 69,552.00 70,840.00 70,840.00 77,280.00
114,264.00 114,264.00 116,380.00 116,380.00 126,960.00
60,490.00 60,490.00 61,065.00 62,100.00 66,240.00
- - - 74,750.00 -
- - - - -
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13
- - 74,750.00 - 74,750.00
- - 17,250.00
- - 23,000.00
- - - 287,500.00 -
299,000.00 299,000.00 299,000.00 299,000.00 299,000.00
- - 552,000.00 - 609,500.00
14,358.00 14,358.00 14,502.00 14,647.00 14,794.00
- - - - -
- - 1,897,500.00 1,840,000.00 1,897,500.00
- - 1,150,000.00 - 1,150,000.00
- - - - -
138,000.00 138,000.00 155,250.00 155,250.00 155,250.00
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
HARGA SATUAN PER KECAMATAN DALAM RUPIAH
TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM
9 10 11 12 13