BQ BASIC DESIGN

PROYEK : STADION OLAH RAGA


LOKASI : PAKANSARI, CIBINONG, KABUPATEN BOGOR, JAWA BARAT
LUAS ARSITEKTU : 27.646 M2
LUAS STRUKTUR : 33.158 M2
LUAS LAPANGAN : 19.535 M2
LUAS LAHAN LUA : 47.961 M2

LUAS BASIC SATUAN


NO. JENIS PEKERJAAN DESIGN RAB JUMLAH
M2 Rp

I. PEKERJAAN PERSIAPAN 27,646


II. PENYIAPAN LAHAN 47,961
III. PEKERJAAN STRUKTUR 33,158
IV. PEKERJAAN ARSITEKTUR 27,646
V. INSTALASI MEKANIKAL & ELEKTRIKAL 27,646
VI. LAPANGAN OLAH RAGA 19,535
VII. INFRA STRUKTUR 47,961
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 47,961

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII)


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME)
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR)
TOTAL RAB

PPN 10 %

TOTAL HPS + PPN


RAB BASIC DESIGN
PROYEK : STADION OLAH RAGA
LOKASI : PAKANSARI, CIBINONG, KABUPATEN BOGOR, JAWA BARAT
LUAS ARSITEKTUR : 27.646 M2
LUAS STRUKTUR : 33.158 M2
LUAS LAPANGAN : 19.535 M2
LUAS HALAMAN LUAR : 47.961 M2

LUAS
SATUAN
NO. JENIS PEKERJAAN BASIC DESIGN JUMLAH
Rp
M2

I. PEKERJAAN PERSIAPAN 27,646 186,600.00 5,158,743,600.00


II. PENYIAPAN LAHAN 47,961 151,900.00 7,285,275,900.00
III. PEKERJAAN STRUKTUR 33,158 4,611,800.00 152,918,064,400.00
IV. PEKERJAAN ARSITEKTUR 27,646 1,617,500.00 44,717,405,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 27,646 190,200.00 5,258,269,200.00
VI. LAPANGAN OLAH RAGA 19,535 508,200.00 9,927,687,000.00
VII. INFRA STRUKTUR 47,961 381,800.00 18,311,509,800.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 47,961 303,500.00 14,556,163,500.00

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 258,133,118,400.00


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.72% 7,021,220,820.48
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR) 95,142 8,500.00 808,707,000.00
TOTAL RAB 265,963,046,220.48

PPN 10 % 26,596,304,622.05

TOTAL RAB BASIC DESIGN + PPN 292,559,350,842.53


HPS BASIC DESIGN
PROYEK : STADION OLAH RAGA
LOKASI : PAKANSARI, CIBINONG, KABUPATEN BOGOR, JAWA BARAT
LUAS ARSITEKTUR : 27.646 M2
LUAS STRUKTUR : 33.158 M2
LUAS LAPANGAN : 19.535 M2
LUAS HALAMAN LUAR : 47.961 M2

LUAS BASIC
SATUAN HPS
NO. JENIS PEKERJAAN DESIGN JUMLAH HPS
Rp
M2

I. PEKERJAAN PERSIAPAN 27,646 186,600.00 5,158,743,600.00


II. PENYIAPAN LAHAN 47,961 151,900.00 7,285,275,900.00
III. PEKERJAAN STRUKTUR 33,158 4,611,800.00 152,918,064,400.00
IV. PEKERJAAN ARSITEKTUR 27,646 1,617,500.00 44,717,405,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 27,646 190,200.00 5,258,269,200.00
VI. LAPANGAN OLAH RAGA 19,535 508,200.00 9,927,687,000.00
VII. INFRA STRUKTUR 47,961 381,800.00 18,311,509,800.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 47,961 303,500.00 14,556,163,500.00

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 258,133,118,400.00


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.72% 7,021,220,820.48
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR) 95,142 8,500.00 808,707,000.00
D. MK & PENGENDALIAN TEKNIS 2.62% 6,763,087,702.08
TOTAL HPS 272,726,133,922.56

PPN 10 % 27,272,613,392.26

TOTAL HPS + PPN 299,998,747,314.82

TOTAL HPS + PPN (DIBULATKAN) 300,000,000,000.00


RAB BASIC DESIGN
PROYEK : STADION OLAH RAGA
LOKASI : PAKANSARI, CIBINONG, KABUPATEN BOGOR, JAWA BARAT
LUAS ARSITEKTUR : 27.646 M2
LUAS STRUKTUR : 33.158 M2
LUAS LAPANGAN : 19.535 M2
LUAS HALAMAN LUAR : 47.961 M2

NO. JENIS PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN 5,160,000,000.00


II. PENYIAPAN LAHAN 7,283,375,700.00
III. PEKERJAAN STRUKTUR 152,918,242,820.00
IV. PEKERJAAN ARSITEKTUR 44,716,987,315.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 5,260,563,022.00
VI. LAPANGAN OLAH RAGA 9,928,446,100.00
VII. INFRA STRUKTUR 18,309,701,692.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 14,558,451,940.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 258,135,768,589.00


B FEE PERENCANA 7,000,000,000.00
C BIAYA IMB 820,000,000.00
D MK & PENGENDALIAN TEKNIS 6,750,000,000.00
TOTAL BIAYA 272,705,768,589.00

PPN 10 % 27,270,576,858.90

TOTAL BIAYA + PPN 299,976,345,447.90

TOTAL BIAYA + PPN (DIBULATKAN) 300,000,000,000.00


RENCANA ANGGARAN BIAYA

PROYEK : STADION OLAH RAGA


LOKASI : KABUPATEN BOGOR

NO. JENIS PEKERJAAN VOLUME SAT. HARGA SATUAN (Rp.) JUMLAH HARGA

I. PEKERJAAN PERSIAPAN 24.00 bln 215,000,000.00 5,160,000,000.00

TOTAL PEKERJAAN I 5,160,000,000.00

II. KONSTRUKSI BANGUNAN

2.1 PENYIAPAN LAHAN AREA STADION


CLEARING, CUT / FILL & STRIPPING 362,357.00 m3 20,100.00 7,283,375,700.00

SUB TOTAL PEKERJAAN 2.1 7,283,375,700.00

2.2 PONDASI : Tiang Pancang 40/40 cm (h=16m)


AREA BARAT 14,896.00 m' 620,000.00 9,235,520,000.00
PENGADAAN PANCANG 40/40 14,896.00 414,000.00
PEMANCANGAN 14,896.00 85,000.00
PENYAMBUNGAN 873.00 150,000.00
AREA TIMUR 14,896.00 m' 620,000.00 9,235,520,000.00

SUB TOTAL PEKERJAAN 2.2 18,471,040,000.00

2.3 SUB-STRUCTURE (Pondasi, Sloof, Poer & Test)


AREA BARAT 1,656.00 m3 3,476,700.00 5,757,415,200.00
AREA TIMUR 1,656.00 m3 3,476,700.00 5,757,415,200.00

SUB TOTAL PEKERJAAN 2.3 11,514,830,400.00

2.4 UPPER-STRUCTURE :
AREA BARAT
2.4.1 STRUKTUR BETON 7,399.00 m3 4,050,000.00 29,965,950,000.00
2.4.2 STRUKTUR BAJA PENYANGGA ATAP 229,375.00 Kg 15,000.00 3,440,625,000.00
2.4.3 SPACE FRAME 9,175.00 m2 2,062,700.00 18,925,272,500.00
2.4.4 PRECAST TRIBUN 6,265.70 m3 1,446,600.00 9,063,961,620.00
AREA TIMUR -
2.4.1 STRUKTUR BETON 7,399.00 m3 4,050,000.00 29,965,950,000.00
2.4.2 STRUKTUR BAJA PENYANGGA ATAP 229,375.00 Kg 15,000.00 3,440,625,000.00
2.4.3 SPACE FRAME 9,175.00 m2 2,062,700.00 18,925,272,500.00
2.4.4 PRECAST TRIBUN 6,363.00 m3 1,446,600.00 9,204,715,800.00

SUB TOTAL PEKERJAAN 2.4 122,932,372,420.00


2.5 PEKERJAAN FINISHING ARSITEKTUR
AREA BARAT
2.5.1 RUANG FUNGSI 2,478.72 m2 1,679,300.00 4,162,514,496.00
2.5.2 HALL & SIRKULASI - -
dalam 4,725.40 1,400,400.00 6,617,450,160.00
luar 3,048.00 818,200.00 2,493,873,600.00
2.5.3 SERVIS AREA - -
toilet + pantry 210.52 1,841,900.00 387,756,788.00
ruang ME - 925,400.00 -
2.5.4 TRIBUN 6,265.70 m2 700,000.00 4,385,990,000.00
2.5.5 KURSI STADION VIP 100.00 Set 880,000.00 88,000,000.00
2.5.6 EXTERIOR ALCOPANEL 3,026.50 m2 600,000.00 1,815,900,000.00
2.5.7 EXTERIOR SIRIP ALUMUNIUM BLADE 1,236.00 m2 600,000.00 741,600,000.00
2.5.8 PENUTUP ATAP ZINCALUM STANDING SEAM 9,175.00 m2 720,000.00 6,606,000,000.00
2.5.9 KACA CLADDING T=8 mm tempered 310.00 m2 750,000.00 232,500,000.00
AREA TIMUR -
2.5.1 RUANG FUNGSI - m2 1,679,300.00 -
2.5.2 HALL & SIRKULASI - m2 - -
dalam 3,550.20 m2 1,400,400.00 4,971,700,080.00
luar - m2 818,200.00 -
2.5.3 SERVIS AREA - m2 - -
toilet + pantry 244.51 m2 1,841,900.00 450,362,969.00
ruang ME 759.93 m2 925,400.00 703,239,222.00
2.5.4 TRIBUN 6,363.00 m2 700,000.00 4,454,100,000.00
2.5.5 KURSI STADION VIP - Set 880,000.00 -
2.5.6 EXTERIOR ALCOPANEL - m2 600,000.00 -
2.5.7 EXTERIOR SIRIP ALUMUNIUM BLADE - m2 600,000.00 -
2.5.8 PENUTUP ATAP ZINCALUM STANDING SEAM 9,175.00 m2 720,000.00 6,606,000,000.00
2.5.9 KACA CLADDING T=8 mm tempered - m2 750,000.00 -

SUB TOTAL PEKERJAAN 2.5 44,716,987,315.00


2.6 PEKERJAAN INSTALASI MEKANIKAL 1,304.99 m2 589,800.00 769,683,102.00
2.6.1 PEKERJAAN INSTALASI AIR BERSIH 1,304.99 m2 432,800.00 564,799,672.00
2.6.2 PEKERJAAN INSTALASI AIR KOTOR & BEKAS - m2 2,302,690,200.00 -
2.6.3 PEKERJAAN TATA UDARA 1,214.96 m2 190,500.00 231,449,880.00
2.6.4 PEKERJAAN VENTAILASI & EXHAUST FAN 15,781.31 m2 55,000.00 867,972,050.00
2.6.5 PEKERJAAN INSTALASI FIRE HIDRAN 15,781.31 m2 21,400.00 337,720,034.00

SUB TOTAL PEKERJAAN 2.6 2,771,624,738.00


2.7 PEKERJAAN INSTALASI ELEKTRIKAL
2.7.1 INSTALASI DAYA & PENERANGAN : 15,781.31 m2 145,300.00 2,293,024,343.00
2.7.2 SOUND SYSTEM 15,781.31 m2 6,900.00 108,891,039.00
2.7.3 TELEPON : 1,847.62 m2 47,100.00 87,022,902.00
RENCANA ANGGARAN BIAYA

PROYEK : STADION OLAH RAGA


LOKASI : KABUPATEN BOGOR

NO. JENIS PEKERJAAN VOLUME SAT. HARGA SATUAN (Rp.) JUMLAH HARGA

SUB TOTAL PEKERJAAN 2.7 2,488,938,284.00

TOTAL PEKERJAAN II 210,179,168,857.00


RENCANA ANGGARAN BIAYA

PROYEK : STADION OLAH RAGA


LOKASI : KABUPATEN BOGOR

NO. JENIS PEKERJAAN VOLUME SAT. HARGA SATUAN (Rp.) JUMLAH HARGA

III. LAPANGAN SARANA OLAH RAGA


3.1 PEMATANGAN LAHAN LAPANGAN OR 20,427.00 M2 94,500.00 1,930,351,500.00
3.2 LAPANGAN SEPAK BOLA 7,140.00 M2 416,900.00 2,976,666,000.00
3.3 JOGGING TRACK & AREA TEMBERENG 6,358.00 M2 225,900.00 1,436,272,200.00
3.4 PAGAR BATAS TRIBUN : t: 2.8m' 392.00 M' 183,200.00 71,814,400.00
3.5 PAGAR BRC ZONA AMAN : t: 3.0m' 966.00 M' 3,637,000.00 3,513,342,000.00
3.6 LANDSCAPING DALAM AREA BANGUNAN - -
RUMPUT - M2 40,000.00 -
PAVING T=6 CM - M2 148,000.00 -

47,960.54 TOTAL PEKERJAAN III 9,928,446,100.00

IV. INFRA STRUKTUR


4.1 PEMATANGAN LAHAN PARKIR & LANDSCAPE 24,845.90 M2 100,000.00 2,484,590,000.00
4.2 JALAN ASPAL LINGKUNGAN, ACWC T=5cm 13,417.00 M2 255,800.00 3,432,068,600.00
4.3 SALURAN LINGKUNGAN, U 80x80 2,840.00 M' 590,800.00 1,677,872,000.00
4.4 SALURAN PARKIR, U 30x30 554.67 M' 222,000.00 123,136,000.00
4.5 SALURAN AREA BANGUNAN, U 50x50 528.00 M' 369,200.00 194,937,600.00
4.6 SALURAN AREA BANGUNAN, U 60x60 967.00 M' 443,100.00 428,477,700.00
4.7 GORONG-GORONG, DIA 100 CM 804.00 M' 1,571,000.00 1,263,084,000.00
4.8 PARKIR PAVING, t=8cm 13,159.40 M2 158,700.00 2,088,396,780.00
4.9 PELATARAN ASPAL (OPEN SPACES) ZONA AMAN / PLAZA 17,274.14 M2 355,800.00 6,146,139,012.00
4.10 LANDSCAPING DILUAR AREA BANGUNAN (TAMAN) 4,110.00 M2 100,000.00 411,000,000.00
4.11 PAVING PEDESTRIAN, t=6cm - M2 148,000.00 -
4.12 TICKET BOOTH, 4 M2 - UNIT 4,000,000.00 -
4.13 POS JAGA INCL TOILET, 14 M2 - UNIT 4,000,000.00 -
4.14 Gardu PLN, 30 M2 1.00 UNIT 60,000,000.00 60,000,000.00
4.15 RUMAH GENSET, 96 M2 - UNIT - -
4.16 RUMAH POMPA & RESERVOIR - UNIT - -

30,691.14 TOTAL PEKERJAAN IV 18,309,701,692.00

V. UTILITAS MEKANIKAL SITE


5.1. INSTALASI AIR BERSIH
- Deep Well, GR, Tanki, Pompa, dll 1.00 UNIT 353,946,000.00 353,946,000.00
- Pemipaan & Valve 1.00 UNIT 624,450,400.00 624,450,400.00
5.2. INSTALASI AIR KOTOR 1.00 UNIT 1,651,148,600.00 1,651,148,600.00
5.3. INST. PERLAWANAN KEBAKARAN 1.00 UNIT 3,114,619,000.00 3,114,619,000.00

TOTAL PEKERJAAN V 5,744,164,000.00

VI. UTILITAS ELEKTRIKAL SITE


6.1 DISTRIBUSI SITE (Trafo, Panel & Pengkabelan) 16,610.00 M2 270,900.00 4,499,649,000.00
6.2 DIESEL & GENSET 350 KVA 1.00 UNIT 800,000,000.00 800,000,000.00
6.3 INSTALASI PENERANGAN LUAR 51,790.00 M2 16,900.00 875,251,000.00
6.4 PENANGKAL PETIR 2.00 M2 124,816,600.00 249,633,200.00
6.5 INSTALASI TELEPON - unit 57,100.00 -
6.6 VSAT & VIDEO CONFFERENCE - M2 285,000,000.00 -
6.7 CCTV & MATV - Unit 448,062,700.00 -
6.8 PENYAMBUNGAN DAYA LISTRIK 350 KVA 27,645.98 Unit 13,000.00 359,397,740.00
6.9 LAMPU SOROT LAPANGAN - M2 50,000,000.00 -
6.10 SOUND SYSTEM LAPANGAN 1.00 Unit 2,030,357,000.00 2,030,357,000.00
6.11 SCORING BOARD - Unit 7,976,734,000.00 -

TOTAL PEKERJAAN VI 8,814,287,940.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI) 58,719.85 M2 258,135,768,589.00


B FEE PERENCANA 7,000,000,000.00
C BIAYA IMB 820,000,000.00
TOTAL BIAYA 265,955,768,589.00

PPN 10 % 26,595,576,858.90

TOTAL BIAYA + PPN 292,551,345,447.90

DIBULATKAN : 292,551,400,000.00
KET. STATUS
NO NAMA KEGIATAN PAGU AWAL USULAN PERUBAHAN TOTAL HPS D&B
DED RAB RKS

1 Lanjutan Penyelesaian Rehab


Lanjutan Penyelesaian Rehab Total
Total Gedung
Gedung SDN Balimester 06 4,999,997.71 1,840,504,000.00 12,211,651,601.25 12,206,651,603.53 LANJUTAN V V V
2 SDN. Pondok
Lanjutan Bambu 14
Penyelesaian Rehab Total Gedung 4,000,000.00 4,000,000.00 LANJUTAN
3 SMPN. 252 3,500,000.00 3,500,000.00 LANJUTAN V V V
4 Lanjutan Penyelesaian pembangunan Kantor Pusaltdikjur Jaktim 5,499,999.22 5,499,999.22 LANJUTAN V V
5 Rehab Total Gedung
Rehab Total Gedung SDN.
SDN Baru 06 Besar
Cipinang 11,962,315,112.00 11,962,315,112.00 11,428,284,727.86 (534,030,384.14) V V
6 Selatan 08 11,657,200,456.00 14,209,144,000.00 12,542,732,288.68 885,531,832.68 V V
7 Rehab Total Gedung SDN. Utan Kayu Utara 08 10,820,000,368.00 8,340,760,000.00
8 Rehab Total Gedung
Rehab Total Gedung SDN.
SDN. Utan
Utan kayu
kayu Selatan
Selatan 17 12,051,356,152.00 13,614,536,242.41 12,815,940,073.86 764,583,921.86 V V
9 20 14,796,489,752.00 16,615,320,000.00 16,936,960,848.23 2,140,471,096.23 V V
10 Rehab Total Gedung SDN. Kramat jati 11/15 12,033,261,592.00 14,773,495,000.00 11,154,509,621.10 (878,751,970.90) V V V
11 Rehab Total Gedung SDN. Kramatjati 12 10,979,604,152.00 10,986,652,000.00 9,371,324,432.91 (1,608,279,719.09) V V V
12 Rehab Total Gedung SDN. Malakasari 14 9,880,000,000.00 9,880,000,000.00 11,271,787,892.17 1,391,787,892.17
13 Rehab Total Gedung SDN. Klender 15 17,250,430,552.00 17,311,892,000.00 16,396,475,404.40 (853,955,147.60) V V
14 Rehab Total Gedung SMPN. 102 19,566,635,352.00 23,072,560,000.00 19,487,429,681.45 (79,205,670.56) V V
15 Rehab Total Gedung SMPN. 160 14,887,311,912.00 23,989,583,000.00 19,217,372,266.13 4,330,060,354.13 UTK 3 LANTAI (TAPI GBR RENCANA 2 LANTAI) V V
16 Rehab Tota Gedung SMPN. 232 16,060,497,992.00 16,960,336,000.00 20,379,958,013.25 4,319,460,021.25 V V V
17 Rehab Total Gedung SMPN. 260 16,486,763,040.00 16,486,763,040.00 17,073,620,077.74 586,857,037.74 V
18 Pembangunan RKB SMPN 281 7,633,293,971.00 8,337,181,000.00 7,313,334,749.88 (319,959,221.13) V V V
19 Pembangunan RKB SMAN. 12 4,833,169,306.00 4,222,524,000.00 V V V
20 Rehab Total Gedung SDN Cipinang Melayu 04 10,819,577,995.00 10,819,577,995.00 V
21 Rehab Total Gedung SDN. Malakasari 06 6,904,813,216.00 10,731,562,000.00 9,591,718,094.31 2,686,904,878.31HARGA SATUAN LAMA GAK COCOK DGN SKRNG V
22 Rehab Total Gedung SDN. Pulogadung 03/04 17,466,420,193.00 17,466,420,193.00 19,141,874,180.72 1,675,453,987.72 V
23 Rehab Total Gedung SDN. Penggilingan 01 6,512,363,106.00 6,512,363,106.00 10,511,159,073.43 3,998,795,967.43
24 Rehab Total Gedung SMPN. 172 19,486,725,064.00 16,955,377,000.00 22,046,892,650.81 2,560,167,586.81 V
25 Rehab Total Gedung SDN Rawamangun 07 17,856,086,731.00 17,856,086,731.00
26 Rehab Total SDN. Duren Sawit 13 17,492,116,193.00 17,492,116,193.00 13,034,902,305.75 (4,457,213,887.25)
27 Rehab Total Gedung SDN. Klender 22 17,523,602,593.00 17,523,602,593.00 10,960,630,958.64 (6,562,971,634.36)
28 Rehab Total Gedung SMPN. 213 19,379,937,449.00 19,004,871,000.00 19,982,105,569.59 602,168,120.59
29 Rehab Total Gedung SMPN. 44 12,096,319,752.00 12,953,083,000.00 13,248,343,829.24 1,152,024,077.24 V V V
30 Rehab Berat
Lanjutan Gedung SMPN.
Penyelesaian 49
Pembangunan RKB 550,000,000.00 550,000,000.00
31 SMPN. 210 4,753,812,000.00 6,712,618,000.00 6,129,172,844.96 1,375,360,844.96 LANJUTAN BUAT BARU V

341,758,103,997.93 367,194,243,204.64
STATUS KOORDINATOR
KETERANGAN
HPS OPT BQ S.COPY DED RKS RAB/BOQ

V V V SCAN ANDI (OK)


DIBATALKAN
V V P.EDMUND ANDI (OK) PINDAH
V V V DIBATALKAN
P.EDMUND GELORA PINDAH
SCAN ANDI (OK)
HARTONO ANDI (OK)
SCAN ALAUDIN (OK)
BAGAS ANDI
RIZAL YUDI (OK)
HARTONO ANDI (OK)
D&B D&B DESIGN & BUILT
NISA ANDI (OK)
SCAN GELORA

ALAUDIN
P.EDMUND YUDI
SCAN YUDI (OK)
D&B DESIGN & BUILT
SCAN ALAUDIN (OK)
P.EDMUND GELORA (OK)
P.EDMUND YUDI
SCAN GELORA (OK)
D&B D&B DESIGN & BUILT
D&B D&B DESIGN & BUILT
GELORA (OK)
BAGAS D&B DESIGN & BUILT
RIZAL D&B DESIGN & BUILT
RIZAL D&B DESIGN & BUILT
D&B D&B DESIGN & BUILT
SCAN GELORA (OK)
DIBATALKAN
SCAN YUDI
BQ BASIC DESIGN
PROYEK : REHAB TOTAL GEDUNG SMP NEGERI 102
LOKASI : JAKARTA TIMUR
LUAS PERSIA : 884.400 M2
LUAS ARSITE : 3,537.600 M2
LUAS STRUKT : 3,537.600 M2
LUAS LAPANG : 491.920 M2
LUAS HALAMA : 2,460.150 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 884.400 200,000.00 176,880,000.00


II. PENYIAPAN LAHAN 2,460.150 95,000.00 233,714,250.00
III. PEKERJAAN STRUKTUR 3,537.600 2,500,000.00 8,844,000,000.00
IV. PEKERJAAN ARSITEKTUR 3,537.600 1,400,000.00 4,952,640,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,537.600 200,000.00 707,520,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,412.148 450,000.00 635,466,600.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,412.148 1,000,000.00 1,412,148,000.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 17,207,771,850.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 464,609,839.95
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 5,113 8,500.00 43,463,475.00
TOTAL RAB 17,715,845,164.95

PPN 10 % 1,771,584,516.50

TOTAL HPS + PPN 19,487,429,681.45


BQ BASIC DESIGN
PROYEK : REHAB TOTAL GEDUNG SDN BARU 06
LOKASI : JAKARTA TIMUR
LUAS PERSIA : 522.600 M2
LUAS ARSITE : 2,090.400 M2
LUAS STRUKT : 2,090.400 M2
LUAS LAPANG : 189.000 M2
LUAS HALAMA : 1,852.500 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 522.600 200,000.00 104,520,000.00


II. PENYIAPAN LAHAN 1,852.500 95,000.00 175,987,500.00
III. PEKERJAAN STRUKTUR 2,090.400 2,500,000.00 5,226,000,000.00
IV. PEKERJAAN ARSITEKTUR 2,090.400 1,400,000.00 2,926,560,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,090.400 200,000.00 418,080,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,166.298 450,000.00 524,834,100.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,166.298 400,000.00 466,519,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 10,087,903,800.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 272,373,402.60
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTU 3,420 8,500.00 29,072,550.00
TOTAL RAB 10,389,349,752.60

PPN 10 % 1,038,934,975.26

TOTAL HPS + PPN 11,428,284,727.86


BQ BASIC DESIGN
PROYEK : REHAB TOTAL GEDUNG SDN MALAKASARI 06
LOKASI : JAKARTA TIMUR
LUAS PERSIA : 552.230 M2
LUAS ARSITE : 1,656.690 M2
LUAS STRUKT : 1,656.690 M2
LUAS LAPANG : 189.000 M2
LUAS HALAMA : 2,036.700 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 552.230 200,000.00 110,446,000.00


II. PENYIAPAN LAHAN 2,036.700 95,000.00 193,486,500.00
III. PEKERJAAN STRUKTUR 1,656.690 2,500,000.00 4,141,725,000.00
IV. PEKERJAAN ARSITEKTUR 1,656.690 1,400,000.00 2,319,366,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,656.690 200,000.00 331,338,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,320.868 450,000.00 594,390,600.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,320.868 400,000.00 528,347,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 8,464,502,300.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 228,541,562.10
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTU 3,141 8,500.00 26,699,860.00
TOTAL RAB 8,719,743,722.10

PPN 10 % 871,974,372.21

TOTAL HPS + PPN 9,591,718,094.31


BQ BASIC DESIGN
PROYEK : REHAB TOTAL GEDUNG SDN UTAN KAYU SELATAN 17 PG
LOKASI : JAKARTA TIMUR
LUAS PERSI : 762.400 M2
LUAS ARSIT : 2,287.200 M2
LUAS STRUK : 2,287.200 M2
LUAS LAPAN : 81.801 M2
LUAS HALAM : 2,458.500 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 762.400 200,000.00 152,480,000.00


II. PENYIAPAN LAHAN 2,458.500 95,000.00 233,557,500.00
III. PEKERJAAN STRUKTUR 2,287.200 2,500,000.00 5,718,000,000.00
IV. PEKERJAAN ARSITEKTUR 2,287.200 1,400,000.00 3,202,080,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,287.200 200,000.00 457,440,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,532.498 450,000.00 689,624,100.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,532.498 400,000.00 612,999,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 11,311,583,800.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 305,412,762.60
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTU 3,983 8,500.00 33,858,050.00
TOTAL RAB 11,650,854,612.60

PPN 10 % 1,165,085,461.26

TOTAL HPS + PPN 12,815,940,073.86


LUAS ARSITEKTUR : 2,287 M2
I 23.60 x 16.000 x 1 x
9.80 x 28.000 x 1 x
13.80 x 8.000 x 1 x

TOTAL
LUAS PERSIAPAN : 762.40 M2
I 23.60 x 16.000 x 1 x
9.80 x 28.000 x 1 x
13.80 x 8.000 x 1 x

TOTAL

LUAS STRUKTUR : 2,287.20 M2


I 23.60 x 16.000 x 1 x
9.80 x 28.000 x 1 x
13.80 x 8.000 x 1 x

TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,458.50 M2


I 81.00 x 33.000 x 1 x
68.00

TOTAL
3 = 1,133
3 = 823
3 = 331

2,287

1 = 378
1 = 274
1 = 110

762

3 = 1,133
3 = 823
3 = 331

2,287

1 = 82

82

1 = 2,458.50

2,459
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SDN KRAMAT JATI 12


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 380.000 M2
LUAS ARSITEKTUR : 1,520.000 M2
LUAS STRUKTUR : 1,520.000 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 2,302.200 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 380.000 200,000.00 76,000,000.00


II. PENYIAPAN LAHAN 2,302.200 95,000.00 218,709,000.00
III. PEKERJAAN STRUKTUR 1,520.000 2,500,000.00 3,800,000,000.00
IV. PEKERJAAN ARSITEKTUR 1,520.000 1,400,000.00 2,128,000,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,520.000 200,000.00 304,000,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,758.598 450,000.00 791,369,100.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,758.598 400,000.00 703,439,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 8,266,920,300.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 223,206,848.10
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 3,442 8,500.00 29,258,700.00
TOTAL RAB 8,519,385,848.10

PPN 10 % 851,938,584.81

TOTAL HPS + PPN 9,371,324,432.91


LUAS ARSITEKTUR : 1,520 M2
I 40.00 x 9.500 x 1 x

TOTAL
LUAS PERSIAPAN : 380.00 M2
I 40.00 x 9.500 x 1 x

TOTAL

LUAS STRUKTUR : 1,520.00 M2


I 40.00 x 9.500 x 1 x

TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,302.20 M2


I 32.00 x 23.000 x 1 x
29.00

II 38.60 x 34.000 x 1 x
50.00

III 16.00 x 6.000 x 1 x


15.50

TOTAL
4 = 1,520

1,520

1 = 380

380

4 = 1,520

1,520

1 = 189

189

1 = 701.50

1 = 1,506.20

1 = 94.50

2,302.2
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SDN KRAMAT JATI 11/15


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 465.085 M2
LUAS ARSITEKTUR : 1,860.340 M2
LUAS STRUKTUR : 1,860.340 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LUA : 2,550.038 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 465.085 200,000.00 93,017,000.00


II. PENYIAPAN LAHAN 2,550.038 95,000.00 242,253,562.50
III. PEKERJAAN STRUKTUR 1,860.340 2,500,000.00 4,650,850,000.00
IV. PEKERJAAN ARSITEKTUR 1,860.340 1,400,000.00 2,604,476,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,860.340 200,000.00 372,068,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,921.351 450,000.00 864,607,725.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,921.351 400,000.00 768,540,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 9,841,215,487.50


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 265,712,818.16
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 3,945 8,500.00 33,534,986.25
TOTAL RAB 10,140,463,291.91

PPN 10 % 1,014,046,329.19

TOTAL HPS + PPN 11,154,509,621.10


LUAS ARSITEKTUR : 1,860 M2
I 9.95 x 32.000 x 1 x
10.50 x 13.970 x 1 x

TOTAL
LUAS PERSIAPAN : 465.09 M2
I 9.95 x 32.000 x 1 x
10.50 x 13.970 x 1 x

TOTAL

LUAS STRUKTUR : 1,860.34 M2


I 9.95 x 32.000 x 1 x
10.50 x 13.970 x 1 x

TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,550.04 M2


I 39.00 x 35.250 x 1 x
52.50

II 33.00 x 22.500 x 1 x
30.00

III 18.00 x 12.700 x 1 x

TOTAL
4 = 1,274
4 = 587

1,860

1 = 318
1 = 147

465

4 = 1,274
4 = 587

1,860

1 = 189

189

1 = 1,612.69

1 = 708.75

1 = 228.60

2,550.0
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SMP NEGERI 44


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 254.800 M2
LUAS ARSITEKTUR : 2,412.936 M2
LUAS STRUKTUR : 2,412.936 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 1,967.625 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 254.800 200,000.00 50,960,000.00


II. PENYIAPAN LAHAN 1,967.625 95,000.00 186,924,375.00
III. PEKERJAAN STRUKTUR 2,412.936 2,500,000.00 6,032,340,000.00
IV. PEKERJAAN ARSITEKTUR 2,412.936 1,400,000.00 3,378,110,400.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,412.936 200,000.00 482,587,200.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,549.223 450,000.00 697,150,350.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,549.223 400,000.00 619,689,200.00

BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 11,693,164,525.00


KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 315,715,442.18
BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 4,126 8,500.00 35,068,968.50
TOTAL RAB 12,043,948,935.68

PPN 10 % 1,204,394,893.57

TOTAL HPS + PPN 13,248,343,829.24


LUAS ARSITEKTUR : 2,413 M2
I 9.80 x 26.000 x 1 x
34.33 x 9.800 x 1 x
3.00 x 4.000 x 1 x

TOTAL
LUAS PERSIAPAN : 254.80 M2
I 9.80 x 26.000 x 1 x
34.33 x 9.800 x 1 x
3.00 x 4.000 x 1 x

TOTAL

LUAS STRUKTUR : 2,412.94 M2


I 9.80 x 26.000 x 1 x
34.33 x 9.800 x 1 x
3.00 x 4.000 x 1 x

TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 1,967.63 M2


I 30.75 x 44.250 x 1 x
35.25

II 30.75 x 33.000 x 1 x

TOTAL
4 = 1,019.20
4 = 1,345.74
4 = 48.00

2,412.94

1 = 254.80
1
1

254.80

4 = 1,019.20
4 = 1,345.74
4 = 48.00

2,412.94

1 = 189.00

189.00

1 = 1,460.25

1 = 507.38

1,967.63
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SMP N CIPINANG BESAR SELATAN 08


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 261.300 M2
LUAS ARSITEKTUR : 2,124.466 M2
LUAS STRUKTUR : 2,124.466 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 2,560.100 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 261.300 200,000.00 52,260,000.00


II. PENYIAPAN LAHAN 2,560.100 95,000.00 243,209,500.00
III. PEKERJAAN STRUKTUR 2,124.466 2,500,000.00 5,311,165,000.00
IV. PEKERJAAN ARSITEKTUR 2,124.466 1,400,000.00 2,974,252,400.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,124.466 200,000.00 424,893,200.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 2,135.198 450,000.00 960,839,100.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 2,135.198 400,000.00 854,079,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 11,066,101,400.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 298,784,737.80
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 4,423 8,500.00 37,597,761.00
TOTAL RAB 11,402,483,898.80

PPN 10 % 1,140,248,389.88

TOTAL HPS + PPN 12,542,732,288.68


LUAS ARSITEKTUR : 2,124 M2
I 10.05 x 32.330 x 1 x
2.60 x 2.000 x 1 x
10.05 x 20.000 x 1 x

TOTAL
LUAS PERSIAPAN : 261.30 M2
I 10.05 x 26.000 x 1 x
2.60 x 9.800 x 1 x
10.05 x 4.000 x 1 x

TOTAL

LUAS STRUKTUR : 2,124.47 M2


I 10.05 x 32.330 x 1 x
2.60 x 2.000 x 1 x
10.05 x 20.000 x 1 x

TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,560.10 M2


I 48.00 x 28.600 x 1 x
59.00

II 59.00 x 20.000 x 1 x
44.00

TOTAL
4 = 1,299.67
4 = 20.80
4 = 804.00

2,124.47

1 = 261.30
1
1

261.30

4 = 1,299.67
4 = 20.80
4 = 804.00

2,124.47

1 = 189.00

189.00

1 = 1,530.10

1 = 1,030.00

2,560.10
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI 06/07 BALIMESTER


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 254.800 M2
LUAS ARSITEKTUR : 2,326.400 M2
LUAS STRUKTUR : 2,326.400 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 1,377.915 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 254.800 200,000.00 50,960,000.00


II. PENYIAPAN LAHAN 1,377.915 95,000.00 130,901,939.25
III. PEKERJAAN STRUKTUR 2,326.400 2,500,000.00 5,816,000,000.00
IV. PEKERJAAN ARSITEKTUR 2,326.400 1,400,000.00 3,256,960,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,326.400 200,000.00 465,280,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 959.513 450,000.00 431,780,917.50
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 959.513 400,000.00 383,805,260.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 10,781,091,116.75


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 291,089,460.15
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 3,450 8,500.00 29,320,878.78
TOTAL RAB 11,101,501,455.68

PPN 10 % 1,110,150,145.57

TOTAL HPS + PPN 12,211,651,601.25


49.03 102.03
53 51.015

LUAS ARSITEKTUR : 2,326 M2


I 9.80 x 44.000 x 1 x
7.40 x 16.000 x 1 x
4.00 x 8.000 x 1 x

TOTAL
LUAS PERSIAPAN : 254.80 M2
I 9.80 x 26.000 x 1 x
7.40 x 9.800 x 1 x
4.00 x 4.000 x 1 x

TOTAL

LUAS STRUKTUR : 2,326.40 M2


I 9.80 x 44.000 x 1 x
7.40 x 16.000 x 1 x
4.00 x 8.000 x 1 x

TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 1,377.92 M2


I 27.01 x 51.015 x 1 x
21.30

TOTAL
4 = 1,724.80
4 = 473.60
4 = 128.00

2,326.40

1 = 254.80
1
1

254.80

4 = 1,724.80
4 = 473.60
4 = 128.00

2,326.40

1 = 189.00

189.00

1 = 1,377.92

1,377.92
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI UTAN KAYU SELATAN 20


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 707.200 M2
LUAS ARSITEKTUR : 2,828.800 M2
LUAS STRUKTUR : 2,828.800 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 3,895.650 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 707.200 200,000.00 141,440,000.00


II. PENYIAPAN LAHAN 3,895.650 95,000.00 370,086,750.00
III. PEKERJAAN STRUKTUR 2,828.800 2,500,000.00 7,072,000,000.00
IV. PEKERJAAN ARSITEKTUR 2,828.800 1,400,000.00 3,960,320,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,828.800 200,000.00 565,760,000.00
VI. LAPANGAN OLAH RAGA 189.000 1,500,000.00 283,500,000.00
VII. INFRA STRUKTUR 2,999.450 450,000.00 1,349,752,500.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 2,999.450 400,000.00 1,199,780,000.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 14,942,639,250.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 403,451,259.75
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 6,017 8,500.00 51,146,625.00
TOTAL RAB 15,397,237,134.75

PPN 10 % 1,539,723,713.48

TOTAL HPS + PPN 16,936,960,848.23


49.03 102.03
53 51.015

LUAS ARSITEKTUR : 2,829 M2


I 9.60 x 24.000 x 1 x
9.60 x 32.000 x 1 x
9.60 x 16.000 x 1 x
4.00 x 4.000 x 1 x
TOTAL
LUAS PERSIAPAN : 707.20 M2
I 9.60 x 24.000 x 1 x
9.60 x 32.000 x 1 x
9.60 x 16.000 x 1 x
4.00 x 4.000 x 1 x
TOTAL

LUAS STRUKTUR : 2,828.80 M2


I 9.60 x 24.000 x 1 x
9.60 x 32.000 x 1 x
9.60 x 16.000 x 1 x
4.00 x 4.000 x 1 x
TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 3,895.65 M2


I 41.00 x 85.200 x 1 x
27.00

9.00 x 36.100 x 1 x
-

12.00 x 20.000 x 1 x
10.00

TOTAL
4 = 921.60
4 = 1,228.80
4 = 614.40
4 = 64.00
2,828.80

1 = 230.40
1 = 307.20
1 = 153.60
1 = 16.00
707.20

4 = 921.60
4 = 1,228.80
4 = 614.40
4 = 64.00
2,828.80

1 = 189.00

189.00

1 = 3,493.20

1 = 162.45

1 = 240.00

3,895.65
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGRI KLENDER 15


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 743.660 M2
LUAS ARSITEKTUR : 2,974.640 M2
LUAS STRUKTUR : 2,974.640 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 2,807.745 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 743.660 200,000.00 148,732,000.00


II. PENYIAPAN LAHAN 2,807.745 95,000.00 266,735,775.00
III. PEKERJAAN STRUKTUR 2,974.640 2,500,000.00 7,436,600,000.00
IV. PEKERJAAN ARSITEKTUR 2,974.640 1,400,000.00 4,164,496,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,974.640 200,000.00 594,928,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 1,900.483 450,000.00 855,217,350.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,900.483 400,000.00 760,193,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 14,472,305,325.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 390,752,243.78
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 5,039 8,500.00 42,829,162.50
TOTAL RAB 14,905,886,731.28

PPN 10 % 1,490,588,673.13

TOTAL HPS + PPN 16,396,475,404.40


LUAS ARSITEKTUR : 2,975 M2
I 2.60 x 6.100 x 1 x
9.60 x 72.000 x 1 x
6.10 x 6.000 x 1 x

TOTAL
LUAS PERSIAPAN : 743.66 M2
I 2.60 x 6.100 x 1 x
9.60 x 72.000 x 1 x
6.10 x 6.000 x 1 x

TOTAL

LUAS STRUKTUR : 2,974.64 M2


I 2.60 x 6.100 x 1 x
9.60 x 72.000 x 1 x
6.10 x 6.000 x 1 x

TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,807.75 M2


I 39.00 x 32.100 x 1 x
45.05

II 21.00 x 32.100 x 1 x
41.85

III 60.00 x 15.000 x 1 x

TOTAL
4 = 63.44
4 = 2,764.80
4 = 146.40

2,974.64

1 = 15.86
1 = 691.20
1 = 36.60

743.66

4 = 63.44
4 = 2,764.80
4 = 146.40

2,974.64

1 = 189.00

189.00

1 = 1,349.00

1 = 1,008.74

1 = 450.00

2,807.75
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SMP NEGERI 252


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 1,056.800 M2
LUAS ARSITEKTUR : 4,191.200 M2
LUAS STRUKTUR : 4,227.200 M2
LUAS LAPANGAN : 189.000 M2
LUAS HALAMAN LU : 3,895.313 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 1,056.800 200,000.00 211,360,000.00


II. PENYIAPAN LAHAN 3,895.313 95,000.00 370,054,687.50
III. PEKERJAAN STRUKTUR 4,227.200 2,500,000.00 10,568,000,000.00
IV. PEKERJAAN ARSITEKTUR 4,227.200 1,400,000.00 5,918,080,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 4,227.200 200,000.00 845,440,000.00
VI. LAPANGAN OLAH RAGA 163.602 1,500,000.00 245,403,000.00
VII. INFRA STRUKTUR 2,674.911 450,000.00 1,203,709,725.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 2,674.911 400,000.00 1,069,964,200.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 20,432,011,612.50


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 551,664,313.54
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 7,066 8,500.00 60,058,556.25
TOTAL RAB 21,043,734,482.29

PPN 10 % 2,104,373,448.23

TOTAL HPS + PPN 23,148,107,930.52


LUAS ARSITEKTUR : 4,191 M2
I 9.80 x 18.000 x 1 x
9.80 x 76.000 x 1 x
9.80 x 12.000 x 1 x
3.00 x 6.000 x 1 x
TOTAL
LUAS PERSIAPAN : 1,056.80 M2
I 9.80 x 18.000 x 1 x
9.80 x 76.000 x 1 x
9.80 x 12.000 x 1 x
3.00 x 6.000 x 1 x
TOTAL

LUAS STRUKTUR : 4,227.20 M2


I 9.80 x 18.000 x 1 x
9.80 x 76.000 x 1 x
9.80 x 12.000 x 1 x
3.00 x 6.000 x 1 x
TOTAL

LUAS LAPANGAN : 189.00 M2


I 21.00 x 9.000 x 1 x

TOTAL

LUAS HALAMAN LUAR : 3,895.31 M2


I 40.00 x 30.000 x 1 x
42.50

II 25.00 x 78.750 x 1 x
42.50

TOTAL
4 = 705.60
4 = 2,979.20
4 = 470.40
2 = 36.00
4,191.20

1 = 176.40
1 = 744.80
1 = 117.60
1 = 18.00
1,056.80

4 = 705.60
4 = 2,979.20
4 = 470.40
4 = 72.00
4,227.20

1 = 189.00

189.00

1 = 1,237.50

1 = 2,657.81

3,895.31
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG ngingong 160


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 1,304.380 M2
LUAS ARSITEKTUR : 3,913.140 M2
LUAS STRUKTUR : 3,913.140 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 2,148.447 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 1,304.380 200,000.00 260,876,000.00


II. PENYIAPAN LAHAN 2,148.447 95,000.00 204,102,465.00
III. PEKERJAAN STRUKTUR 3,913.140 2,500,000.00 9,782,850,000.00
IV. PEKERJAAN ARSITEKTUR 3,913.140 1,400,000.00 5,478,396,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,913.140 200,000.00 782,628,000.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 762.266 450,000.00 343,019,700.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 762.266 400,000.00 304,906,400.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 17,279,480,065.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 466,545,961.76
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 4,757 8,500.00 40,436,259.50
TOTAL RAB 17,786,462,286.26

PPN 10 % 1,778,646,228.63

TOTAL HPS + PPN 19,565,108,514.88


LUAS ARSITEKTUR : 3,913 M2
I 9.80 x 18.000 x 1 x
9.80 x 60.100 x 1 x
9.80 x 18.000 x 1 x
9.80 x 37.000 x 1 x
TOTAL
LUAS PERSIAPAN : 1,304.38 M2
I 9.80 x 18.000 x 1 x
9.80 x 60.100 x 1 x
9.80 x 18.000 x 1 x
9.80 x 37.000 x 1 x
TOTAL

LUAS STRUKTUR : 3,913.14 M2


I 9.80 x 18.000 x 1 x
9.80 x 60.100 x 1 x
9.80 x 18.000 x 1 x
9.80 x 37.000 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,148.45 M2


I 60.10 x 36.82 x 1 x
56.60

TOTAL
3 = 529.20
3 = 1,766.94
3 = 529.20
3 = 1,087.80
3,913.14

1 = 176.40
1 = 588.98
1 = 176.40
1 = 362.60
1,304.38

3 = 529.20
3 = 1,766.94
3 = 529.20
3 = 1,087.80
3,913.14

1 = 81.80

81.80

1 = 2,148.45

2,148.45
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI MALAKASARI 14


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 494.800 M2
LUAS ARSITEKTUR : 1,484.400 M2
LUAS STRUKTUR : 1,484.400 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 4,355.401 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 494.800 200,000.00 98,960,000.00


II. PENYIAPAN LAHAN 4,355.401 95,000.00 413,763,075.05
III. PEKERJAAN STRUKTUR 1,484.400 2,500,000.00 3,711,000,000.00
IV. PEKERJAAN ARSITEKTUR 1,484.400 1,400,000.00 2,078,160,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,484.400 200,000.00 296,880,000.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 3,778.800 450,000.00 1,700,459,905.50
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 3,778.800 400,000.00 1,511,519,916.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 9,933,444,396.55


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 268,202,998.71
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 5,345 8,500.00 45,432,506.72
TOTAL RAB 10,247,079,901.97

PPN 10 % 1,024,707,990.20

TOTAL HPS + PPN 11,271,787,892.17


LUAS ARSITEKTUR : 1,484 M2
I 9.60 x 32.000 x 1 x
9.60 x 16.000 x 1 x
4.25 x 8.000 x 1 x

TOTAL
LUAS PERSIAPAN : 494.80 M2
I 9.60 x 32.000 x 1 x
9.60 x 16.000 x 1 x
4.25 x 8.000 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS STRUKTUR : 1,484.40 M2


I 9.60 x 32.000 x 1 x
9.60 x 16.000 x 1 x
4.25 x 8.000 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 4,355.40 M2


I 68.98 x 51.13 x 1 x
50.35

6.80 62.500

4.45 51.120

TOTAL
3 = 921.60
3 = 460.80
3 = 102.00

1,484.40

1 = 307.20
1 = 153.60
1 = 34.00
1 = -
494.80

3 = 921.60
3 = 460.80
3 = 102.00
3 = -
1,484.40

1 = 81.80

81.80

1 = 3,050.43

850.00

454.97

4,355.40
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SMP NEGERI 260


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 1,080.818 M2
LUAS ARSITEKTUR : 3,184.378 M2
LUAS STRUKTUR : 3,184.378 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 2,821.231 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 1,080.818 200,000.00 216,163,500.00


II. PENYIAPAN LAHAN 2,821.231 95,000.00 268,016,964.00
III. PEKERJAAN STRUKTUR 3,184.378 2,500,000.00 7,960,943,750.00
IV. PEKERJAAN ARSITEKTUR 3,184.378 1,400,000.00 4,458,128,500.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,184.378 200,000.00 636,875,500.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 1,658.613 450,000.00 746,375,715.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,658.613 400,000.00 663,445,080.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 15,072,650,509.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 406,961,563.74
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 4,925 8,500.00 41,860,725.20
TOTAL RAB 15,521,472,797.94

PPN 10 % 1,552,147,279.79

TOTAL HPS + PPN 17,073,620,077.74


LUAS ARSITEKTUR : 3,184 M2
I 9.80 x 105.200 x 1 x
6.00 x 2.850 x 1 x
25.25 x 1.150 x 1 x
2.33 x 1.600 x 1 x
TOTAL
LUAS PERSIAPAN : 1,080.82 M2
I 9.80 x 105.200 x 1 x
6.00 x 2.850 x 1 x
25.25 x 1.150 x 1 x
2.33 x 1.600 x 1 x
TOTAL

LUAS STRUKTUR : 3,184.38 M2


I 9.80 x 105.200 x 1 x
6.00 x 2.850 x 1 x
25.25 x 1.150 x 1 x
2.33 x 1.600 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,821.23 M2


I 57.64 x 56.31 x 1 x
42.56

TOTAL
3 = 3,092.88
3 = 51.30
1 = 29.04
3 = 11.16
3,184.38

1 = 1,030.96
1 = 17.10
1 = 29.04
1 = 3.72
1,080.82

3 = 3,092.88
3 = 51.30
1 = 29.04
3 = 11.16
3,184.38

1 = 81.80

81.80

1 = 2,821.23

2,821.23
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI PULO GADUNG 03


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 834.107 M2
LUAS ARSITEKTUR : 3,336.428 M2
LUAS STRUKTUR : 3,336.428 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 3,916.120 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 834.107 200,000.00 166,821,375.00


II. PENYIAPAN LAHAN 3,916.120 95,000.00 372,031,435.53
III. PEKERJAAN STRUKTUR 3,336.428 2,500,000.00 8,341,068,750.00
IV. PEKERJAAN ARSITEKTUR 3,336.428 1,400,000.00 4,670,998,500.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,336.428 200,000.00 667,285,500.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 3,000.212 450,000.00 1,350,095,624.55
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 3,000.212 400,000.00 1,200,084,999.60

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 16,891,087,684.68


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 456,059,367.49
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 6,418 8,500.00 54,556,748.49
TOTAL RAB 17,401,703,800.66

PPN 10 % 1,740,170,380.07

TOTAL HPS + PPN 19,141,874,180.72


LUAS ARSITEKTUR : 3,336 M2
I 9.73 x 56.375 x 1 x
9.73 x 24.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 6.100 x 1 x
TOTAL
LUAS PERSIAPAN : 834.11 M2
I 9.73 x 56.375 x 1 x
9.73 x 24.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 6.100 x 1 x
TOTAL

LUAS STRUKTUR : 3,336.43 M2


I 9.73 x 56.375 x 1 x
9.73 x 24.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 6.100 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 3,916.12 M2


I 44.15 x 79.67 x 1 x
54.16

TOTAL
4 = 2,192.99
4 = 933.60
4 = 146.40
4 = 63.44
3,336.43

1 = 548.25
1 = 233.40
1 = 36.60
1 = 15.86
834.11

4 = 2,192.99
4 = 933.60
4 = 146.40
4 = 63.44
3,336.43

1 = 81.80

81.80

1 = 3,916.12

3,916.12
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI PENGGILINGAN 01


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 457.501 M2
LUAS ARSITEKTUR : 1,830.004 M2
LUAS STRUKTUR : 1,830.004 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 2,133.914 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 457.501 200,000.00 91,500,200.00


II. PENYIAPAN LAHAN 2,133.914 95,000.00 202,721,806.68
III. PEKERJAAN STRUKTUR 1,830.004 2,500,000.00 4,575,010,000.00
IV. PEKERJAAN ARSITEKTUR 1,830.004 1,400,000.00 2,562,005,600.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,830.004 200,000.00 366,000,800.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 1,594.612 450,000.00 717,575,289.53
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,594.612 400,000.00 637,844,701.80

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 9,275,359,898.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 250,434,717.25
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 3,506 8,500.00 29,804,542.41
TOTAL RAB 9,555,599,157.66

PPN 10 % 955,559,915.77

TOTAL HPS + PPN 10,511,159,073.43


LUAS ARSITEKTUR : 1,830 M2
I 9.95 x 8.000 x 1 x
9.95 x 37.980 x 1 x

TOTAL
LUAS PERSIAPAN : 457.50 M2
I 9.95 x 8.000 x 1 x
9.95 x 37.980 x 1 x
- x 0.000 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS STRUKTUR : 1,830.00 M2


I 9.95 x 8.000 x 1 x
9.95 x 37.980 x 1 x
- x 0.000 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,133.91 M2


I 22.28 x 62.41 x 1 x
46.11

TOTAL
4 = 318.40
4 = 1,511.60
= -
= -
1,830.00

1 = 79.60
1 = 377.90
1 = -
1 = -
457.50

4 = 318.40
4 = 1,511.60
- = -
- = -
1,830.00

1 = 81.80

81.80

1 = 2,133.91

2,133.91
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI 172


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 970.900 M2
LUAS ARSITEKTUR : 3,883.600 M2
LUAS STRUKTUR : 3,883.600 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 4,350.000 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 970.900 200,000.00 194,180,000.00


II. PENYIAPAN LAHAN 4,350.000 95,000.00 413,250,000.00
III. PEKERJAAN STRUKTUR 3,883.600 2,500,000.00 9,709,000,000.00
IV. PEKERJAAN ARSITEKTUR 3,883.600 1,400,000.00 5,437,040,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,883.600 200,000.00 776,720,000.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 3,297.299 450,000.00 1,483,784,550.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 3,297.299 400,000.00 1,318,919,600.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 19,455,595,650.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 525,301,082.55
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 7,263 8,500.00 61,732,950.00
TOTAL RAB 20,042,629,682.55

PPN 10 % 2,004,262,968.26

TOTAL HPS + PPN 22,046,892,650.81


LUAS ARSITEKTUR : 3,884 M2
I 9.60 x 56.375 x 1 x
9.60 x 40.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 3.500 x 1 x
TOTAL
LUAS PERSIAPAN : 970.90 M2
I 9.60 x 56.375 x 1 x
9.60 x 40.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 3.500 x 1 x
TOTAL

LUAS STRUKTUR : 3,883.60 M2


I 9.60 x 56.375 x 1 x
9.60 x 40.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 3.500 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 4,350.00 M2


I x x 1 x

TOTAL
4 = 2,164.80
4 = 1,536.00
4 = 146.40
4 = 36.40
3,883.60

1 = 541.20
1 = 384.00
1 = 36.60
1 = 9.10
970.90

4 = 2,164.80
4 = 1,536.00
4 = 146.40
4 = 36.40
3,883.60

1 = 81.80

81.80

1 = 4,350.00

4,350.00
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI RAWAMANGUN 07


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 970.900 M2
LUAS ARSITEKTUR : 3,883.600 M2
LUAS STRUKTUR : 3,883.600 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 1,560.000 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 970.900 200,000.00 194,180,000.00


II. PENYIAPAN LAHAN 1,560.000 95,000.00 148,200,000.00
III. PEKERJAAN STRUKTUR 3,883.600 2,500,000.00 9,709,000,000.00
IV. PEKERJAAN ARSITEKTUR 3,883.600 1,400,000.00 5,437,040,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,883.600 200,000.00 776,720,000.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 507.299 450,000.00 228,284,550.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 507.299 400,000.00 202,919,600.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 16,819,045,650.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 454,114,232.55
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 4,473 8,500.00 38,017,950.00
TOTAL RAB 17,311,177,832.55

PPN 10 % 1,731,117,783.26

TOTAL HPS + PPN 19,042,295,615.81


LUAS ARSITEKTUR : 3,884 M2
I 9.60 x 56.375 x 1 x
9.60 x 40.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 3.500 x 1 x
TOTAL
LUAS PERSIAPAN : 970.90 M2
I 9.60 x 56.375 x 1 x
9.60 x 40.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 3.500 x 1 x
TOTAL

LUAS STRUKTUR : 3,883.60 M2


I 9.60 x 56.375 x 1 x
9.60 x 40.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 3.500 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 1,560.00 M2


I x x 1 x

TOTAL
4 = 2,164.80
4 = 1,536.00
4 = 146.40
4 = 36.40
3,883.60

1 = 541.20
1 = 384.00
1 = 36.60
1 = 9.10
970.90

4 = 2,164.80
4 = 1,536.00
4 = 146.40
4 = 36.40
3,883.60

1 = 81.80

81.80

1 = 1,560.00

1,560.00
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERI DUREN SAWIT 13


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 619.140 M2
LUAS ARSITEKTUR : 2,476.559 M2
LUAS STRUKTUR : 2,476.559 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 1,802.606 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 619.140 200,000.00 123,827,935.00


II. PENYIAPAN LAHAN 1,802.606 95,000.00 171,247,524.07
III. PEKERJAAN STRUKTUR 2,476.559 2,500,000.00 6,191,396,750.00
IV. PEKERJAAN ARSITEKTUR 2,476.559 1,400,000.00 3,467,182,180.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 2,476.559 200,000.00 495,311,740.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 1,101.665 450,000.00 495,749,178.68
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 1,101.665 400,000.00 440,665,936.60

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 11,508,082,744.34


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 310,718,234.10
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 3,660 8,500.00 31,110,208.60
TOTAL RAB 11,849,911,187.04

PPN 10 % 1,184,991,118.70

TOTAL HPS + PPN 13,034,902,305.75


LUAS ARSITEKTUR : 2,477 M2
I 10.23 x 42.380 x 1 x
2.00 x 2.600 x 1 x
10.23 x 17.663 x 1 x

TOTAL
LUAS PERSIAPAN : 619.14 M2
I 10.23 x 42.380 x 1 x
2.00 x 2.600 x 1 x
10.23 x 17.663 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS STRUKTUR : 2,476.56 M2


I 10.23 x 42.380 x 1 x
2.00 x 2.600 x 1 x
10.23 x 17.663 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 1,802.61 M2


I 32.00 x 48.46 x 1 x
42.39

TOTAL
4 = 1,733.34
4 = 20.80
4 = 722.42
= -
2,476.56

1 = 433.34
1 = 5.20
1 = 180.60
1 = -
619.14

4 = 1,733.34
4 = 20.80
4 = 722.42
- = -
2,476.56

1 = 81.80

81.80

1 = 1,802.61

1,802.61
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SD NEGERIKLENDER 22


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 457.700 M2
LUAS ARSITEKTUR : 1,830.800 M2
LUAS STRUKTUR : 1,830.800 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 2,547.990 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 457.700 200,000.00 91,540,000.00


II. PENYIAPAN LAHAN 2,547.990 95,000.00 242,059,050.00
III. PEKERJAAN STRUKTUR 1,830.800 2,500,000.00 4,577,000,000.00
IV. PEKERJAAN ARSITEKTUR 1,830.800 1,400,000.00 2,563,120,000.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,830.800 200,000.00 366,160,000.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 2,008.489 450,000.00 903,820,050.00
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 2,008.489 400,000.00 803,395,600.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 9,669,796,200.00


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 261,084,497.40
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 3,921 8,500.00 33,329,265.00
TOTAL RAB 9,964,209,962.40

PPN 10 % 996,420,996.24

TOTAL HPS + PPN 10,960,630,958.64


LUAS ARSITEKTUR : 1,831 M2
I 9.95 x 32.000 x 1 x
9.95 x 14.000 x 1 x

TOTAL
LUAS PERSIAPAN : 457.70 M2
I 9.95 x 32.000 x 1 x
9.95 x 14.000 x 1 x
- x 0.000 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS STRUKTUR : 1,830.80 M2


I 9.95 x 32.000 x 1 x
9.95 x 14.000 x 1 x
- x 0.000 x 1 x
- x 0.000 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 2,547.99 M2


I x 1 x

TOTAL
4 = 1,273.60
4 = 557.20
= -
= -
1,830.80

1 = 318.40
1 = 139.30
1 = -
1 = -
457.70

4 = 1,273.60
4 = 557.20
- = -
- = -
1,830.80

1 = 81.80

81.80

1 = 2,547.99

2,547.99
BQ BASIC DESIGN

PROYEK : REHAB TOTAL GEDUNG SMP N 213


LOKASI : JAKARTA TIMUR
LUAS PERSIAPAN : 834.107 M2
LUAS ARSITEKTUR : 3,336.428 M2
LUAS STRUKTUR : 3,336.428 M2
LUAS LAPANGAN : 81.801 M2
LUAS HALAMAN LU : 4,696.340 M2

LUAS BASIC SATUAN RAB


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) ( Rp)

I. PEKERJAAN PERSIAPAN 834.107 200,000.00 166,821,375.00


II. PENYIAPAN LAHAN 4,696.340 95,000.00 446,152,300.00
III. PEKERJAAN STRUKTUR 3,336.428 2,500,000.00 8,341,068,750.00
IV. PEKERJAAN ARSITEKTUR 3,336.428 1,400,000.00 4,670,998,500.00
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,336.428 200,000.00 667,285,500.00
VI. LAPANGAN OLAH RAGA 81.801 1,500,000.00 122,701,500.00
VII. INFRA STRUKTUR 3,780.432 450,000.00 1,701,194,456.25
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 3,780.432 400,000.00 1,512,172,850.00

A BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 17,628,395,231.25


B KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 475,966,671.24
C BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR 7,199 8,500.00 61,188,615.31
TOTAL RAB 18,165,550,517.81

PPN 10 % 1,816,555,051.78

TOTAL HPS + PPN 19,982,105,569.59


LUAS ARSITEKTUR : 3,336 M2
I 9.73 x 56.375 x 1 x
9.73 x 24.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 6.100 x 1 x
TOTAL
LUAS PERSIAPAN : 834.11 M2
I 9.73 x 56.375 x 1 x
9.73 x 24.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 6.100 x 1 x
TOTAL

LUAS STRUKTUR : 3,336.43 M2


I 9.73 x 56.375 x 1 x
9.73 x 24.000 x 1 x
6.10 x 6.000 x 1 x
2.60 x 6.100 x 1 x
TOTAL

LUAS LAPANGAN : 81.80 M2


I 13.41 x 6.100 x 1 x

TOTAL

LUAS HALAMAN LUAR : 4,696.34 M2


I x 1 x

TOTAL
4 = 2,192.99
4 = 933.60
4 = 146.40
4 = 63.44
3,336.43

1 = 548.25
1 = 233.40
1 = 36.60
1 = 15.86
834.11

4 = 2,192.99
4 = 933.60
4 = 146.40
4 = 63.44
3,336.43

1 = 81.80

81.80

1 = 4,696.34

4,696.34
BQ BASIC DESIGN
PROYEK : PEMBANGUNAN RKB SMP NEGERI 281
LOKASI : JAKARTA TIMUR
LUAS ARSITEKTUR : 1,425.08 M2
LUAS STRUKTUR : 1,425.08 M2
LUAS LAPANGAN : - M2
LUAS HALAMAN LUAR : 780.35 M2

LUAS BASIC SATUAN RAB (


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) Rp)

I. PEKERJAAN PERSIAPAN 471.30 200,000 94,260,000


II. PENYIAPAN LAHAN 780.35 95,000 74,133,250
III. PEKERJAAN STRUKTUR 1,425.08 2,500,000 3,562,700,000
IV. PEKERJAAN ARSITEKTUR 1,425.08 1,400,000 1,995,112,000
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,425.08 200,000 285,016,000
VI. LAPANGAN OLAH RAGA - 1,500,000 -
VII. INFRA STRUKTUR 309.05 450,000 139,072,500
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 309.05 1,000,000 309,050,000

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 6,459,343,750


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 174,402,281
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR) 1,734.13 8,500 14,740,105
TOTAL RAB 6,648,486,136.25

PPN 10 % 664,848,613.63

TOTAL HPS + PPN 7,313,334,750


BQ BASIC DESIGN
PROYEK : REHAB TOTAL GEDUNG SMP NEGERI 160
LOKASI : JAKARTA TIMUR
LUAS ARSITEKTUR : 3,821.74 M2
LUAS STRUKTUR : 3,821.74 M2
LUAS LAPANGAN : - M2
LUAS HALAMAN LUAR : 1,894.05 M2

LUAS BASIC SATUAN RAB (


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) Rp)

I. PEKERJAAN PERSIAPAN 1,296.78 200,000 259,356,000


II. PENYIAPAN LAHAN 1,894.05 95,000 179,934,750
III. PEKERJAAN STRUKTUR 3,821.74 2,500,000 9,554,350,000
IV. PEKERJAAN ARSITEKTUR 3,821.74 1,400,000 5,350,436,000
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,821.74 200,000 764,348,000
VI. LAPANGAN OLAH RAGA - 1,500,000 -
VII. INFRA STRUKTUR 597.27 450,000 268,771,500
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 597.27 1,000,000 597,270,000

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 16,974,466,250


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 458,310,589
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR) 4,419.01 8,500 37,561,585
TOTAL RAB 17,470,338,423.75

PPN 10 % 1,747,033,842.38

TOTAL HPS + PPN 19,217,372,266


BQ BASIC DESIGN
PROYEK : LANJUTAN PENYELESAIAN PEMBANGUNAN RKB SMPN 210
LOKASI : JAKARTA TIMUR
LUAS ARSITEKTUR : 1,215.20 M2
LUAS STRUKTUR : 1,215.20 M2
LUAS LAPANGAN : - M2
LUAS HALAMAN LUAR : 771.04 M2

LUAS BASIC SATUAN RAB (


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) Rp)

I. PEKERJAAN PERSIAPAN 607.60 200,000 121,520,000


II. PENYIAPAN LAHAN 771.04 95,000 73,248,800
III. PEKERJAAN STRUKTUR 1,215.20 2,500,000 3,038,000,000
IV. PEKERJAAN ARSITEKTUR 1,215.20 1,400,000 1,701,280,000
V. INSTALASI MEKANIKAL & ELEKTRIKAL 1,215.20 200,000 243,040,000
VI. LAPANGAN OLAH RAGA - 1,500,000 -
VII. INFRA STRUKTUR 163.44 450,000 73,548,000
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 163.44 1,000,000 163,440,000

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 5,414,076,800


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 146,180,074
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR) 1,378.64 8,500 11,718,440
TOTAL RAB 5,571,975,313.60

PPN 10 % 557,197,531.36

TOTAL HPS + PPN 6,129,172,845


BQ BASIC DESIGN
PROYEK : REHAP TOTAL SMPN 232
LOKASI : JAKARTA TIMUR
LUAS ARSITEKTUR : 3,127.00 M2
LUAS STRUKTUR : 3,127.00 M2
LUAS LAPANGAN : 189.00 M2
LUAS HALAMAN LUAR : 4,008.00 M2

LUAS BASIC SATUAN RAB (


NO. JENIS PEKERJAAN JUMLAH
DESIGN (M2) Rp)

I. PEKERJAAN PERSIAPAN 827.65 200,000 165,530,000


II. PENYIAPAN LAHAN 4,008.00 95,000 380,760,000
III. PEKERJAAN STRUKTUR 3,127.00 2,500,000 7,817,500,000
IV. PEKERJAAN ARSITEKTUR 3,127.00 1,400,000 4,377,800,000
V. INSTALASI MEKANIKAL & ELEKTRIKAL 3,127.00 200,000 625,400,000
VI. LAPANGAN OLAH RAGA 189.00 1,500,000 283,500,000
VII. INFRA STRUKTUR 2,991.35 450,000 1,346,107,500
VIII. UTILITAS MEKANIKAL & ELEKTRIKAL SITE 2,991.35 1,000,000 2,991,350,000

A. BIAYA KONSTRUKSI (I+II+III+IV+V+VI+VII+VIII) 17,987,947,500


B. KONSULTAN (ARSITEKTUR,STRUKTUR,ME) 2.70% 485,674,583
C. BIAYA IMB (GEDUNG, LAPANGAN, INFRASTRUKTUR) 6,307.35 8,500 53,612,475
TOTAL RAB 18,527,234,557.50

PPN 10 % 1,852,723,455.75

TOTAL HPS + PPN 20,379,958,013