CONSTRUCTION RISK REGISTER

JOB / ACTIVITY ………………………………………………………..

Extreme Risk

High Risk
Project Details and Location : Concerned Department : Projects Department
Medium Risk

Low Risk

Risk Rating Score

Residual Risk
Consequence
Action Status

Risk Rating
Likelihood

(R=S x L)
(To be checked at site by
# Hazard Risk Control Measures the receiver of Safety

(S)

(L)
Document)

 

 

 

 

Revision – 5 Date – 1st Sep 2020 Documented Information # OETC-HSE-O-CRR-F-000 Page 1 of 2


CONSTRUCTION RISK REGISTER

JOB / ACTIVITY ………………………………………………………..

Assessed by Reviewed by Approved by

Name: Name: Name:

Designation: Designation: Designation:

Company: Company: Company:

Signature: Signature: Signature:

Date: Date: Date:


Note:
1.0 Contractor’s line supervisors in consultation with his team shall carry out hazard identification and risk assessment. This shall be reviewed by Contractor Project
Manager in consultation with his HSE Officer and finally approved by OETC supervision Consultant.
2.0 Action status to be checked and ticked (last column) at site by the Supervisor.
3.0 OETC HSE Department approval required in case of any suggested revision.

Revision – 5 Date – 1st Sep 2020 Documented Information # OETC-HSE-O-CRR-F-000 Page 2 of 2