DOCKING REPAIRS LIST MV.

HAI BAO LIU HAO

NO. DESCRITION
1 STERN TUBE SEAL SHAFT PROPELER PORT AND STBD LEAKAGE NEED TO BE RENEW.
2 REPLACE AFT SEAL OIL GEAR BOX PORT SIDE FOUND OIL LEAKAGE.
BLOWER ENGINE ROOM PORT AND STBD FOUND NOISY NEED TO BE CHANGE
3
BEARING AND MAGERING WIRING.
4 BLOWER CO2 ROOM FOUND NOISY NEED TO BE CHANGE BEARING
MAIN SEACHESE VALVE FOUND LEAKAGE DURING CLEANING STRAINER AND NEED TO
5
BE REPAIR.
6 FO QUICK CLOSING VALVE DAILY TANK FOUND LEAKAGE NED TO BE CHANGE.
7 FIRE ALARM SYSTEM EROR NED TO BE CALIBRATION.
FO AND WATER TANK VENTILATION FOUND DAMAGE AND CORODED NEED TO BE
8
REPLACE.
9 BOX BATTERY M/E AND A/E TO SMALL NEED MODIVICATION.
10 ENGINE ALARM SOUND AND SIGNAL LIGH NEED TO BE INSTAL IN ENGINE ROOM.
11 ENGINE INDICATOR GUAGE ON THE BRIDGE NOT WORKING NEED TO BE REPLACE.
12 SEVERAL VALVE OVER BOAT IN ENGINE ROOM NEED TO BE REPAIR.
13 ALL AC IN DOOR AND OUT DOOR NEED TO BE CLEAN.
14 REPAIR LINE ( TREE WAY LINE ) FRESH WATER SERVICE FOUND LEAKAGE.

SEAWAGE TREATMENT PLAN


3 PCS SUCTION VALVE SEAWAGE NOT WORKING ( LOSS DURING TURNING) NEED TO
1
BE CHANGE.
MAIN VALVE BETWEN TOILET AND SEAWAGE TREATMENT PLAN LEAKAGE NEED TO BE
2
REPAIR.
VALVE OVER BOAT SEAWAGE TREATMEN PLANT FOUND LEAKAGE DURING DISCHARGE
3
SEAWAGE AND NEED TO BE REPAIR.
SEAWAGE DISCHARGE PUMP TO SMALL NEED TIME FOR DISCHARGE SEAWAGE, NEED
4
TO REPLACE WITH BIG CAPACITY.

MAIN ENGINE CUMIN K19


1 MAIN ENGINE SAFETY DEVICE NOT WORKING NEED TO BE SERVICE.
2 LAPPING EXHAUST AND INLET VALVE CYL 1 - 6
3 TEST AND CALIBRATION INJECTOR CYL 1 - 6
MEASURE GROVE PISTON CROWN AND SCRAPER RING CYL 1 - 6 IF OVER LIMIT
4
REPLACE.
5 CALIBRATION PT FUEL PUMP.
6 REPLACE LO HOSES OUTLET TURBOCHARGER FOUND LEAKAGE.
7 REPLACE GASKET EXHAUST AND INLET CONECTION TURBOCHARGER.
8 REPLACE TERMOSTAT
9 CLEANING AFT COOLER / AIR COOLER
10 CLEANING COOLAND HEAT EXCHANGER.
11 CLEANING LO HEAT EXCHANGER.
12 REPLACE MAIN BEARING.

AUXILIARY ENGINE
GENERATOR / ALTERNATOR NO.1 AND NO.2 NEED TO BE CLEAN WIRING AND
1
MAGERING

CATERPILAR ENGINE AND LMF COMPRESSOR


1 LAPPING EXHAUST AND INLET VALVE CATERPILAR ENGINE.
2 TEST AND CALIBRATION INJECTOR CATERPILAR ENGINE
3 TEST AND CALIBRATION FUEL PUMP CATERPILAR ENGINE
4 REPLACE GASKET CYL COVER CATERPILAR ENGINE
5 CLEANING HEAT EXCHANGER.
REPLACE LO HOSES OULET FROM PRIMING PUMP LMF SCREW COMPRESSOR FOUND
6
LEAKAGE.
7 CHECK INLET AND OUTLET VALVE PISTON COMPRESSOR STAGE 2 - 4.
2ND STAGE AIR SEPARATOR CHAMBER LMF COMPRESSOR DAMAGE NEED TO BE
8
CHANGE.
9 REPAIR SEA WTER DRAIN LINE FOR LMF AND ENGINE CAT FOUND LEAKAGE.
10 REPLACE GUAGE INDICATOR LMF COMPRESSOR, SEVERAL GUAGE NOT WORKING.