N

W E

RETAINING WALL

WATER INLET
FROM APIIC
150 NB

CO2/9kg.
FIRE/EX
FIRE PUMP ROOM
TO
PUMP
FIRE/EX
AREA DCP/6kg.

WATER INLET
FROM APIIC
150 NB

PROPOSED PROPOSED
U/G SUMP U/G SUMP
(FIRE HYDRANT) (PROCESS)
1645 KL 1006 KL
23.7M X 23.15M X 3.0M 11.55M X 29.05M X 3.0M
FIRE/EX
DCP/6kg.

Basis Running hours : 4 Hrs FIRE/EX


CO2/9kg.

Pump Capacity : 410 Cumt/hr


Total Sump Volume required : 1640 Cumt
Designed Sump Volume : 1645 Cumt

UNDER GROUND FLOOR PLAN SUMP @ (-)3.45 M LVL


PORUS LABORATORIES PVT.LTD.
PLOT NO-2A, 2B & 2C APSEZ,MOTURUPALEM VILLAGE, ATCHUTHAPURAM,VISHAKAPATNAM-531011.

MTS TECHNOLOGIES LTD.


Do.No.7-148/3,Road No.1, Nagendra
Nagar Colony, Habsiguda, HYD-07, AP.

FIRE EXTINGUISHER LAYOUT AT


FIRE PUMP ROOM PLAN