APQP PPAP Evidence Workbook
APQP PPAP Evidence Workbook
APQP PPAP Evidence Workbook
C. Manufacturing Information
Check Check Check
One
Manufacturing Site One Manufacturing Process One Tooling Type
Carry-over production site Carry-over production process Carry-over production tooling
New production site New production process New production tooling
Prototype site Prototype process Prototype / soft tooling
D. Deviations FTT
Measurement Results Reason Alert #
None required, all delivered parts meet 100% of Part Deviation Engineering
the requirements in time to support the build Notice Notification
Quality or Timing
Yes
No
Special
Ford PD / STA / Charactreistics
Ongoing
Supplier Modified
Yes
Key: From DFMEA: From PFMEA: Note: approvals may be electronic: complete the approval block above to identify the approvers, and include "/s/" ahead
of the name typed into the "signature" box to indicate electronic approval and approve in e-mail with this file as an
Sev 9,10. Potential Sev 9,10 (Part). Sev 5-8 AND Occ 4-10. Significant attachment.
YC CC. CC Critical Characteristic. SC Characteristic.
Characteristic Description Specification & Tolerance DFMEA Class Process Control Method
Class
1 Closed Gap 0.25 to 0.50 mm YC CC Vernier caliper
2 Axial Width 2.5 +0.01, -0.03 mm YS SC go / no go fixture
3 Brake assembly caliper bolt torque 20 nm +/- 3 nm YC CC DC nut runner
4 Door trim fastener hold depth 5mm +/- 1mm YS Visual
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Characteristic Study Parameters Gauge R&R Process Control Distribution Analysis Capability Results
1
2
3
4
5
6
7
r
8
9
10
11
12
13
14
15
16
17
18
19
20
i
21
22
23
24
25
26
27
28
29
Supplier Ships part to meet in plant date (IPD) GPDS: Prior to shipment of GPDS: Supplier Promise Date must support rough
Supplier GPDS: <VP> MRD
commitment for the Prototype Build Phase Powertrain <VP> MRD or finished Powertrain Unit build phase IPD(s)
Build Event Planned quantity of vehicles or powertrain quantity for the Build Event. Powertrain should
Quantity include internal Powertrain Dyno requirements which are not covered in vehicle build.
Required Ford determined number of vehicles/powertrains to be built per GPDS build event
Produced Supplier number of vehicle/powertrain sets built per ford the GPDS build event
B. Production Supplier / Product Information
Tier 1 Supplier Name Tier 1 Supplier responsible for the end item
Mfg. Site Code Mfg. Site code is the Global Supplier Data Base (GSDB) Site Code containing 5-digits
Tier 1 Supplier Location Production manufacturing location of the Tier 1 Supplier
Supplier Delivery Promise Date The date entered into GPIRS or VPP by the supplier when the end item will be received In-
Plant at the Ford designated facility.
Part Name Powertrain
General namehasgiven
2 In Plant
to theDates (IPD) per build phase to support machining and assembly
end item
and that precedes the vehicle IPD.
Ford Part Number Ford designated component, sub-assembly or assembly number
Engineering Change Level Engineering change level for a part is the design record revision level (i.e. Part Print) as
(e.g. Print Revision Level) identified by a 4-part alphanumeric code (typically 14 characters in length) containing the
following:
a) Change Level Indicator (CLI) identifying the releasing authority
b) Part drawing revision letter (single letter)
c) Electronic Release System code (WERS = 8-digit concern number)
d) Release Status of the part in the electronic release system (WERS = 3-digit increments of
any notices attached to the part)
Engineering Change Level is also reported on the PSW.
Powertrain prorotype parts for builds (X0, XM, M1) can be ordered under an experimental
part number
Engineering Change Level - For Engineering Prototype CMMS manual powertrain prototype release (used by PPM)
Releases (X0, XM, M1) Example: B2010EF16A252001
New Tooled End Item (Y/N) A)
Is aBcomponent,
= is alpha by system default
sub-assembly or (assembly
B assumes engine
with a new) design for the given Program Code
C. Prototype Manufacturing Information
Manufacturing Site Location where the end item were manufactured for the build event
Carry-over production site Same location as previous model year or common platform
New Production site New facility designated as production intent to produced the end item
Prototype site Facility responsible for producing the end item for the specific build events (i.e. not
production intent)
Manufacturing Process Manufacturing process for the end item producing for the build event. The scope of
information is the end item manufacturing process(es) only
Carry-over process Same manufacturing process as previous model year or common platform
New production process At least one operation contains new manufacturing process(es) to produced the end item
for the specific build event (i.e. production intent process)
Prototype process At least one operation contains a prototype process(es) to produced the end item for the
specific build event
Tooling Type Manufacturing tooling for the end item producing for the specified build event. The scope
of information is the end item manufacturing process(es) only
Carry-over production tooling Same manufacturing tooling as previous model year or common platform
New Production Tooling At least one operation contains new manufacturing tooling to produced the end item or the
specific build event (i.e. production intent process)
Prototype/ soft tooling At least one operation contains prototype tooling in the process utilized to produce the end
item for the specific build event (i.e. not production intent)
D. Deviations
None required, all delivered parts meet 100% of the Prototype Parts are 100% measured, dimensionally known and signed off by Ford
requirements in time to support the build Engineering or Production Parts Achieve 100% of print specifications (minimum 5 piece
layout)
Part Deviation Notice (e.g. Red Border Notice) A Supplier notification that they cannot meet the Ford order requirements for either quality
or timing
Quality or Timing Categorize the reason why the Ford order requirements cannot be met
Engineering Notification Provide the Deviation Notification: approved Alert number for the specification deviations.
Note: North American Powertrain deviations for prototype builds prior VP are identified on
the e-Warrant.
Characteristic (X0, XM and M1) All required print specification, engineering requirements and/or process characteristics as
agreed upon by the Product Engineer and the Supplier are to be measured and reported on
this template. All characteristics will be included in the printed report.
Specification Specification for the inspection item defined on the design record (print or E.S.)
DFMEA Classification (YS, YC) Classification as identified on the DFMEA as "Potential Critical Characteristic" (YC) or
"Potential Signficant Characteristic" (YS).
Note: Specific Special Characteristic designation may not be identified for the X0, XM or M1
prototype
PFMEA Classification (CC, SC, HI, Other) Classification as identified by the PFMEA. Other characteristics are print requirements that
are not identified as Special Characteristics.
Note: Specific Special Characteristic designation may not be identified for the X0, XM or M1
prototypes.
Process Control Method (VP and beyond) How are the parts inspected or measured as defined in the Prototype Control Plan? If the
control method is different than the method identified on the Special Characteristics
Agreement then report the reasons in the Comments / Actions Taken cell.
Process Control Method (X0, XM, and M1) How are the parts inspected or measured as agreed upon with the Product Engineer for
prototype build: X0, XM, M1? If the control method is different than the method identified
on the Special Characteristics Agreement then report the reasons in the Comments /
Actions Taken cell.
On Control Plan (Y/N) Is the characteristic contained on the prototype build, prelaunch, or production control plan
of the reporting supplier for the parts produced supporting this build event?
Not applicable for builds prior to <VP> for Powertrain (X0, XM, M1).
Quantity Inspected (pcs.) How many pieces are contained in the inspection results data set? Prototype part quantity
to be inspected as required by Ford Product Engineer
Results: X-bar Calculated average (mean) from inspection results data set. The mean (arithmetic average)
is the sum of all the observations divided by the number of observations
Results: Range Calculates of the difference between the largest and smallest data values
All Parts Meet Specification (Y/N) All parts measured meet the characteristic specification
Comments / Actions Taken Make comments specific to the inspection item and include the action plan if the inspection
item does not meet the specification
Data Reporting The supplier must complete the measurements and report for all characteristics.
Note: For North American Powertrain prototype builds prior to VP include results with the
e-Warrant Submission
Ppk Ppk
Controlled Characteristic Meeting Ppk Ppk < Ppk 0 to Ppk 0.5 1.0 to 1.33 to Ppk >= Ppk Not
Detail Counts Required Requirement 0 0.49 to 0.99 1.32 0.166 1.67 Reported
Initial Assessment
Follow-up Assessment
Program Code The program code represents the Ford designation for the Vehicle or PTO
program
Product Name Product name is for the 'Vehicle' or 'PTO' name
Build Event The build event for the GPDS program milestone under review
Mfg. Site Code Mfg. Site code is the Global Supplier Data Base (GSDB) Site Code containing 5-
digits identifying the supplier manufacturing site
Tier 1 Supplier Location Production manufacturing location of the Tier 1 Supplier
Phase PPAP Status: The Phase PPAP Status: date entered into VPP or MPP by the supplier for PPAP
commits for the Phase PPAP deliverables
Promise Date Promise date entered into VPP or MPP by the supplier for PPAP commits for the
Phase PPAP deliverables
PPAP Approval Date Completed PPAP approval for the Phase PPAP Deliverables
Part Name General name given to the end item
Engineering Change Level Engineering change level for a part is the design record revision level (i.e. Part
(e.g. Print Revision Level) Print) as identified by a 4-part alphanumeric code (typically 14 characters in
length) containing the following:
a) Change Level Indicator (CLI) identifying the releasing authority
b) Part drawing revision letter (single letter)
c) Electronic Release System code (WERS = 8-digit concern number)
d) Release Status of the part in the electronic release system (WERS = 3-digit
increments of any notices attached to the part)
Engineering Change Level is also reported on the PSW.
Example: WPTSE12178961024
a) WPTS = Powertrain Systems Engine Mounts
b) E = engineering release
c) 12178961 = WERS notice
d) 024 = 24 WERS notices attached to this concern
New Tooled End Item (Y/N) Is the component, sub-assembly or assembly a new design for the given
Program Code?
C. Manufacturing Information
Manufacturing Site Location where the end item is manufactured for the build event
Carry-over production site Same location as previous model year or common platform
New Production site New facility designated as production intent to produce the end item
Prototype site Facility responsible for producing the end item for the specific build events (i.e.
not production intent)
Manufacturing Process Manufacturing process for the end item producing for the build event. The
scope of information is the end item manufacturing process(es) only
Carry-over process Same manufacturing process as previous model year or common platform
New process At least one operation contains new manufacturing process(es) to produced the
end item for the specific build event (i.e. production intent process)
Prototype process At least one operation contains a prototype process(es) to produced the end
item for the specific build event
Tooling Type Manufacturing tooling for the end item producing for the specified build event.
The scope of information is the end item manufacturing process(es) only
Carry-over tooling Same manufacturing tooling as previous model year or common platform
New Production Tooling At least one operation contains new manufacturing tooling to produced the end
item or the specific build event (i.e. production intent process)
Prototype/ soft tooling At least one operation contains prototype tooling in the process utilized to
produce the end item for the specific build event (i.e. not production intent)
One Production Stream Demonstrate that Initial Process Capability studies have been completed using
Run-at-Rate parts from the same production stream
All Production Streams Demonstrate that separate Initial Process Capability studies have been
completed using Run-at-Rate parts from each production stream.
D. Deviations
None required, production process is capable Parts achieved PPAP Ppk ≥ 1.67 or Production Ppk ≥ 1.33 from the production
(PPAP Ppk ≥ 1.67 or Production Ppk ≥ 1.33) streams studied
Action taken for non-capable process The modified control method shall include techniques to incorporate mistake
(PPAP Ppk < 1.67 or Production Ppk < 1.33) proofing methods into the manufacturing process to prevent the shipment of
non compliant product to Ford facilities.
Note: examples of mistake proofing methods include the modification of
manufacturing processes to detect and discard non compliant product (e.g.,
poke-yoke), or a gauge to ensure product compliance to specification where the
process does not meet the capability requirements. This is not the addition of a
temporary manual inspection process at the end of the line.
Engineering notification Provide the Deviation Notification. Example: approved WERS Alert number for
the specification deviations with the interim PPAP submission.
DFMEA Classification (YS, YC) Classification as identified on the DFMEA as "Potential Critical Characteristic"
(YC) or "Potential Signficant Characteristic" (YS).
PFMEA Classification (CC, SC, HI, Other) Classification as identified by the PFMEA. Other characteristics are print
requirements that are not identified as Special Characteristics
On Production Control Plan (Y/N) Is the characteristic contained on the production control plan of the reporting
supplier?
Manufacturing Operation Identifier Supplier's Production Manufacturing Operation identifier is a code or number
unique to the operation identified on the process flow chart and process control
plan
Pass Through Characteristic (PTC) (Y/N) A Pass through Characteristic (PTC) is a product characteristic whose fit or
function qualities are not validated, verified or functionally tested within the
manufacturing or assembly process in question (external suppliers and
internally Ford-made parts). PTC are generally finished characteristics with part
print tolerances or specifications that are not verified in house or at the supplier,
and where defective parts can be passed on to the customer (defined as Vehicle
Operations or the buying public).
Examples may include:
Engine Thermostats
Torque Converter studs
Cylinder Head – FEAD mounting holes
Transmission Case – Starter mounting holes
Threaded hole supplied by an external supplier, not used in Powertrain Plant
Error Proofed (Y/N) Does the characteristic have an error proof method? This is required for CCs
and Ford identified PTCs.
Process Control Method How are the parts inspected or measured? If the control method is different than
the method identified on the Special Characteristics Agreement then report the
reasons in the Comments / Actions Taken cell.
Characteristic dependent on sub-supplier (Include PTC) Does the characteristic control require process control at a sub-supplier? This
(Y/N) applies to all characteristics classifications and include PTCs.
Study Parameters Study parameters refers to the sample size and population where the capability
study data is collected
Population What is the population (or estimate) size that contains the samples?
Sample Size How many pieces are contained in the inspection results data set?
Evidence: Number of Points Not in Control Report the number of data points not in control. Out of control coniditions occur
when there is data outside the control limits. An out of control condition for the
X-bar chart is defined as 1 point greater or less than 3 standard deviations from
the mean. If more that 1 data point is not in-control then action is required.
Distribution Analysis The data distribution needs to be evaluated and identified for the appropriate
capability analysis calculation. For example, a normal distribution test requires
a P-value greater than 0.05 to assume normality. Non-normal data requires data
transformation
Distribution Type Select the type of distribution identified for the capability analysis. Refer to a
known distributions based on the physics or specific types of process available
through your STA engineer.
Resultant P-value or Best Fit Coefficient Report the distribution fit statistical hypothesis p-value or the best fit coefficient
from the distribution identification fit technique as appropriate
Results: PPAP Ppk or Production Ppk Process Capability Formula: Ppk
Example below is a calculation for a normal distribution
(Other capability distribution calculations may be applied where appropriate per
ISO 21747)
(USL−X) (X−LSL)
Ppk=min or
3 σ^ S 3 σ^ S
Where standard deviation is defined as:
√
n (X i−X)2
Ppk: { σ^ S= ∑ ¿
i=1 n−1
Meets Capability Requirement Conditional formatting will automatically populate the cell based on the process
PPAP Ppk ≥ 1.67 capability results meeting the PPAP Ppk requirement or the Production Ppk
Production Ppk ≥ 1.33 requirements. PPAP Ppk ≥ 1.67
(Y/N) Production Ppk ≥ 1.33
Note: Capability can NOT be determined until t
Comments / Action Taken Conditional formatting will identify through field transition to clear when
comments for action taken is needed based on meeting the capability
requirements. Make comments specific to the special characteristic and include
actions taken for low initial p
Data Reporting The supplier must complete the measurements and report for all special
characteristics. The first 20 characteristics are selected for report out to Ford
management
Prototype Parts order with quantity and Prototype Parts Order: quantity and
Ford PD GPDS: <FDJ> Program requirements
timing to suppliers in support of VP Build timing
GPDS:2 Months Prototype Parts Order: quantity and Prototype Build Control Plan
Supplier / Ford PD
Prior to <VP> timing Prototype Build Control Plan Including process parameters,
Special Char Agreement (FAF 03- Completed (Deliverable #11) gauges, inspection methods,
111-2) tolerances, and reaction plan(s)
GPDS: In support
Supplier Hard tool or prototoype tools PRODUCE PROTOYPE PARTS
of <VP> MRD
Yes
No
Ford PD
GPDS: In support PROTOTYPE OR PRODUCTION Prototype Parts Ford PD Approves
of <VP> MRD MEASUREMENT RESULTS No part deviation
signed-off by Ford
Engineering notice Obtain approval/sign-off on results
from Ford PD Engineer
GPDS: In support Agreement to ship the prototype Suppler Ships part to meet Material Required Parts shipped in support of <VP>
Supplier Date (MRD) for <VP> Build
of <VP> MRD parts MRD
Yes
Results maintained
with APQP records
Send file to Site STA Engineer PROTOTYPE OR PRODUCTION
Supplier APQP/PPAP Evidence Workbook
MEASUREMENT RESULTS
Sort data into top 20 most important Select 'Print Cover Page &
characteristics Executive Summary Evidence PROTOTYPE OR PRODUCTION
Site STA Form' button to print top 20
GPDS: <VP> (e.g. importance to part MEASUREMENT RESULTS (Top
functionality) characteristics 20 Characteristics)
Organizes per Functional area Send file to STA Program team Functional area PROTOTYPE OR
GPDS: <VP>
Program STA (Body, Electrical, Chassis, etc.) PRODUCTION MEASUREMENT
RESULTS
Ford Management Roll up all functional area data Ford Management review of
GPDS: <VP> data & feed back actions to STA All functional area PROTOTYPE
Engineer OR PRODUCTION
MEASUREMENT RESULTS
RESULTS
Range
Yes
No
GPDS: In Support Suppler Ships part to meet In-Plant Date (IPD) Parts shipped in support of <TT> or
Supplier of <TT> or <PP> Agreement to ship the parts Build after Phase 1 / 2 Approval or Interim <PP> IPD
IPD Acceptance
Sort data into top 20 most important Select 'Print Cover Page &
GPDS: In Support characteristics Executive Summary Evidence PROTOTYPE OR PRODUCTION
Site STA Form' button to print top 20
of <TT> or <PP> (e.g. importance to part MEASUREMENT RESULTS (Top
IPD functionality) characteristics 20 Characteristics)
GPDS: In Support Organizes per Functional area Send file to STA Program team Functional area PROTOTYPE OR
Program STA of <TT> or <PP> (Body, Electrical, Chassis, etc.) PRODUCTION MEASUREMENT
IPD RESULTS
Ford Management GPDS: In Support Roll up all functional area data Ford Management review of
of <TT> or <PP> data & feed back actions to STA All functional area PROTOTYPE
IPD Engineer OR PRODUCTION
MEASUREMENT RESULTS
Supplier
Required Delivery
Program In-Plant Promise Build Event
Model Year Code Product Name Build Event Date Date Vehicle Sets
2011 U502 Explorer VP 17-Jul-09 17-Aug-09 Required 94
Produced 150
C. Manufacturing Information
Check Check Check
One
Manufacturing Site One Manufacturing Process One Tooling Type
✘ Carry-over production site CMI - Muskegon ✘
Carry-over production process Carry-over production tooling
New production site New production process New production tooling
Prototype site ✘ Prototype process ✘ Prototype / soft tooling
D. Deviations
Measurement Results Reason Alert #
None required, all delivered parts meet 100% of ✘ Part Deviation Timing Engineering
the requirements in time to support the build Notice Notification
Quality or Timing
Summary Results
On
PFMEA All Parts
Number
Material Yield
1
Strength
207 Mpa min YC CC Y tensile bars 1 per batch 4 217.75 3 Y none required
Material
Ultimate Tensile
2 Strength 276 Mpa min YC CC Y tensile bars 1 per batch 4 290.75 11 Y none required
Supplier
Technical Pre-Launch Control Plan is completed
GPDS: <PEC> On Control Plan (Y/N) and Control Plan Linkage
Assistance (Deliverable #15)
(STA) Manufacturing Operation Identifier
Supplier / Ford Sub-supplier process flow / PFMEA / Characteristic dependent on sub- Sub-supplier control plan contains
GPDS: <PEC> supplier (Include PTC as
STA / PD control plan process control methods
appropriate)
STUDY PARAMETERS
GAUGE R&R
Remove special
Supplier / Ford Complete Measurement System Analysis causes and
Phase 0: In using Automotive Industry Action Group %Study Variation Gauge Repeatability &
STA implement corrective
support of <TT> (AIAG) Measurement System Analysis actions Reproducibility (R&R) results meet
IPD (MSA) and Ford's Customer Specifics to Ford customer specifics
%Tolerance
Phase 2: In PPAP for Gauge R&R (Deliverable #18)
support of <PP>
IPD
No No
Phase 0: In Identified special Stable and in-control statistical
Statistical process control tools (Xbar and Evidence process control tools (Xbar and R or
Supplier support of <TT> demonstrates cause remove
IPD R or Xbar and S, or IM-R or other method) from data set Xbar and S, or IM-R or other
stability & control method)
Phase 2: In
support of <PP>
IPD
Phase 3: In Yes Yes
support of <MP2>
Yes
Supplier
Phase 0: In
support of <TT> PRODUCTION PROCESS CAPABILITY Completed PRODUCTION
IPD RESULTS Report results on PRODUCTION PROCESS CAPABILITY RESULTS
Phase 2: In PROCESS CAPABILITY RESULTS
support of <PP> proforma
Include ACTIONS TAKEN when
IPD capability requirements for the
Phase 3: In given characteristic are not met
support of <MP2>
No
Initial selection of
Priority sites will
Program STA occur by <PTC> Priority Supplier List Priority Supplier
(unless otherwise
identified)
Yes
Yes
All functional area requested supplier Ford Management review of data &
Ford GPDS: TT / Unit proformas feed back actions to STA Engineer All functional areas\ EXTERNAL
Management <TT> and
SUPPLIER PRODUCTION
GPDS: PP MRD /
PROCESS CAPABILITY RESULTS
Unit <PP> MRD
✘
✘
Engineering Change New Tooled
Part Name Ford Part Number Level End Item (Y/N)
REAR KNUCKLE ASSEMBLY BB53-5B758(9)-AC WPTSE12178961024 Y
C. Manufacturing Information
Check Check Check
One
Manufacturing Site One Manufacturing Process One Tooling Type
Carry-over production site CMI - Muskegon Carry-over production process Carry-over production tooling
New production site New production process New production tooling
Prototype site Prototype process Prototype / soft tooling
D. Deviations
Process Capability Results Alert #
None required, production process is Actions taken for non-capable process Engineering
capable (See page 2 for Actions Taken) notification
Box-Cox
7 UCA Bore diameter 10 ± 0.5 mm YS SC Y OP20 N Y CMM N 300 125 12.45% 11.11% X-bar and R 0 0.2 1.67 Y
Transformed
8 UCA Position 0.5 mm max YS SC Y OP20 N N CMM N 300 125 18.56% 15.88% X-bar and R 0 Lognormal 0.85 1.81 Y
Johnson
9 UCA Roundness max 0.5 YS SC Y OP30 N Y tallyrand N 300 125 21.50% 17.76% X-bar and R 0 0.001 1.34 N 100% in-line air gage
Transformed
10 Bushing span 7.36-7.49 mm YS SC Y OP20 N N optical comparator Y 300 125 4.65% 7.88% X-bar and R 0 Normal 0.34 2.33 Y
Characteristic %
DFMEA PFMEA On Pass Through % Demonstrated Evidence:
Number
Program Code The program code represents the Ford designation for the Vehicle or PTO
program
Product Name Product name is for the 'Vehicle' or 'PTO' name
Build Event The build event for the GPDS program milestone under review
Mfg. Site Code Mfg. Site code is the Global Supplier Data Base (GSDB) Site Code containing 5-
digits identifying the supplier manufacturing site
Tier 1 Supplier Location Production manufacturing location of the Tier 1 Supplier
Phase PPAP Status: The Phase PPAP Status: date entered into VPP or MPP by the supplier for PPAP
commits for the Phase PPAP deliverables
Promise Date Promise date entered into VPP or MPP by the supplier for PPAP commits for the
Phase PPAP deliverables
PPAP Approval Date Completed PPAP approval for the Phase PPAP Deliverables
Part Name General name given to the end item
Engineering Change Level Engineering change level for a part is the design record revision level (i.e. Part
(e.g. Print Revision Level) Print) as identified by a 4-part alphanumeric code (typically 14 characters in
length) containing the following:
a) Change Level Indicator (CLI) identifying the releasing
Example: WPTSE12178961024
a) WPTS = Powertrain Systems Engine Mounts
b) E = engineering release
c) 12178961 = WERS notice
d) 024 = 24 WERS notices attached to this concern
New Tooled End Item (Y/N) Is the component, sub-assembly or assembly a new design for the given
Program Code?
C. Manufacturing Information
Manufacturing Site Location where the end item is manufactured for the build event
New Production site New facility designated as production intent to produce the end item
Prototype site Facility responsible for producing the end item for the specific build events (i.e.
not production intent)
Manufacturing Process Manufacturing process for the end item producing for the build event. The
scope of information is the end item manufacturing process(es) only
Carry-over process Same manufacturing process as previous model year or common platform
New process At least one operation contains new manufacturing process(es) to produced the
end item for the specific build event (i.e. production intent process)
Prototype process At least one operation contains a prototype process(es) to produced the end
item for the specific build event
Tooling Type Manufacturing tooling for the end item producing for the specified build event.
The scope of information is the end item manufacturing process(es) only
Carry-over tooling Same manufacturing tooling as previous model year or common platform
New Production Tooling At least one operation contains new manufacturing tooling to produced the end
item or the specific build event (i.e. production intent process)
Prototype/ soft tooling At least one operation contains prototype tooling in the process utilized to
produce the end item for the specific build event (i.e. not production intent)
D. Deviations
All production processes are stable and in-control Demonstrated method of stability and control evidence indicates all points are in
control
Actions taken for out of control processes The modified control method shall include techniques to incorporate mistake
proofing methods into the manufacturing process to prevent the shipment of
non compliant product to Ford facilities.
Note: examples of mistake proofing methods include the modification of
manufacturing processes to detect and discard non compliant product (e.g.,
poke-yoke), or a gauge to ensure product compliance to specification where the
process does not meet the capability requirements. This is not the addition of a
temporary manual inspection process at the end of the line.
FTT Report the manufacturing process First Time Through (FTT) as a planned (target)
Planned and demonstrated (actual) result. FTT is the percentage of units processed at
Demonstrated the Evaluation Point (EP) that meet Quality Guidelines the first time without
being repaired, retested, returned from within the plant, or scrapped.
Specification Specification for the characteristic defined on the design record (print or E.S.)
DFMEA Classification (YS, YC) Classification as identified on the DFMEA as "Potential Critical Characteristic"
(YC) or "Potential Signficant Characteristic" (YS).
Sample Size How many pieces are contained in the inspection results data set?
Demonstrated Method of Stability and Control Identify the method of statistical process control evaluation. Statistical process
control evaluation techniques include X-bar and R, or X-bar and S, or I-MR.
Note: For charting, X-bar and R or X- bar and S, 25 subgroups of 3 to 5 pcs
Evidence: Number of Points Not in Control Report the number of data points not in control. Out of control coniditions occur
when there is data outside the control limits. An out of control condition for the
X-bar chart is defined as 1 point greater or less than 3 standard deviations from
the mean. If more that 1 data point is not in-control then action is required.
Comments / Action Taken Conditional formatting will identify through field transition to clear when
comments for action taken is needed based on demonstration of process
control. Make comments specific to the special characteristic and include
actions taken for out of control process.
Data Reporting The supplier must complete the measurements and report for all special
characteristics.
7 UCA Bore diameter 10 ± 0.5 mm YS SC Y 30 N N CMM N 300 125 12.45% 11.11% X-bar and R 0
Modified
Control Chart
Air gage is 100%
9 UCA Roundness max 0.5 YS SC Y 30 N N tallyrand N 300 125 21.50% 17.76% for Non 4
inspection frequency
Random
Variation
10 Bushing span 7.36-7.49 mm YS SC Y 30 N N optical comparator N 300 125 4.65% 7.88% X-bar and S 0