Pga Defect List 24.03.2010
Pga Defect List 24.03.2010
Project: Cadangan Merekabentuk, Membina, Menyiapkan Dan Menguji Tauliah Projek Pembangunan
Semula Kem Batalion 12, Pasukan Gerak Am (Pga) Miri Dan Balai Polis Trafik Miri,
Di Atas Lot 633, 2363, 141 Dan 314 Miri Concession Land, Miri Sarawak
Bangunan Electrical 1) All lighting fittings are to be installed with wire to prevent sagging 18.03.10 ATHSB
Batalion
All Floors
Bangunan Electrical 1) Power Point not provided for Bain Marie 18.03.10 ATHSB
Batalion 2) Switches and ppts are to be adjusted to be the same level as wall 18.03.10 ATHSB
tiling (shift up)
Kantin 3) Trunking in ceiling void not earthed 18.03.10 ATHSB
4) Trunking through wall opening not properly sealed 18.03.10 ATHSB
Bangunan Electrical/ICT 1) Trunking tee off from main trunking not earthed 18.03.10 ATHSB/GTSB
ATHSB/
Batalion 2) Trunking through walls/beams openings not sealed 18.03.10 GTSB
Ground Floor
Corridor
Substation SS5 Electrical 1) Genset and AMF Board not installed 18.03.10 ATHSB
2) Trenches not cleaned up 18.03.10 CEES
3) Trenches not filled with sand 18.03.10 CEES
4) Checker Plate cover not installed at trenches 18.03.10 CEES
Water Tower Lightning 1) Lightning Protection (Non Conventional) at Water Tower not 18.03.10 ATHSB
installed
Protection 2) Conduits from Water Tower Pump room are not installed with G.I., 18.03.10
instead with PVC
Balai Polis Electrical 1) All lighting fittings are to be installed with wire to prevent sagging 18.03.10 ATHSB
Trafik Electrical/ICT/ELV 1) Trunking tee off from main trunking not earthed 18.03.10 ATHSB/GTSB
ATHSB/
General 2) Trunking through walls/beams openings not sealed 18.03.10 GTSB
Comments
Balai Polis Builder 1) Louver installed at Server Room (Airconditioned Room) 18.03.10 Builder
Trafik
Server Room
Balai Polis Builder 1) Ceiling suspended from M&E Services 18.03.10 Builder
Trafik
PGA MIRI Perunding Timur Sdn Bhd
All Floors
Project: Cadangan Merekabentuk, Membina, Menyiapkan Dan Menguji Tauliah Projek Pembangunan
Semula Kem Batalion 12, Pasukan Gerak Am (Pga) Miri Dan Balai Polis Trafik Miri,
Di Atas Lot 633, 2363, 141 Dan 314 Miri Concession Land, Miri Sarawak
1) 13A Metal Clad ppt not installed at Black Maria Entrance (for Roller
Balai Polis Electrical 18.03.10 ATHSB
Shutter)
Trafik
Black Maria
Subsation Electrical 1) Supporting Bracket at MSB not installed (Trench) 18.03.10 ATHSB
SSTrafik 2) Trenches not cleaned up 18.03.10 CEES
3) Trenches not filled with sand 18.03.10 CEES
4) Checker Plate cover not installed at trenches 18.03.10 CEES
Dewan Makan Electrical 1) Switches and ppts not the same level 18.03.10 ATHSB
Kantin 2) All lighting fittings are to be installed with wire to prevent sagging 18.03.10 ATHSB
Kuarters Kelas Telephone 1) Trunking from SDF Room to Telephone Riser not installed 18.03.10 ATHSB
F 19A
Plant room
(Ground Floor)
External St Lighting 1) Verticality of street lighting poles are not adjusted 18.03.10 CEES
Ext. Telephone 1) JC9C at Pengangkutan Drop off porch not level to road level 18.03.10 CEES
Subsation Electrical 1) Supporting Bracket at MSB not installed (Trench) 24.03.10 ATHSB
SSTrafik 2) Trenches not cleaned up 24.03.10 CEES
3) Trenches not filled with sand 24.03.10 CEES
4) Checker Plate cover not installed at trenches 24.03.10 CEES
5) Lighting not installed 24.03.10 ATHSB
6) MCB at DB not installed 24.03.10 ATHSB
7) Switches and PPT not installed 24.03.10 ATHSB
8) Genset and AMF Board not installed 24.03.10 ATHSB
Substation SS5 Electrical 1) Genset and AMF Board not installed 24.03.10 ATHSB
2) Trenches not cleaned up and dewatered 24.03.10 CEES
3) Trenches not filled with sand 24.03.10 CEES
PGA MIRI Perunding Timur Sdn Bhd
Project: Cadangan Merekabentuk, Membina, Menyiapkan Dan Menguji Tauliah Projek Pembangunan
Semula Kem Batalion 12, Pasukan Gerak Am (Pga) Miri Dan Balai Polis Trafik Miri,
Di Atas Lot 633, 2363, 141 Dan 314 Miri Concession Land, Miri Sarawak
Stesen PMP Builder 1) No space to install light fitting due to omission of ceiling boards 24.03.10 Builder
(2 no.s of 2x2 Recessed light fittings outside of Pejabat)
Cawangan Builder 1) Shift of Ceiling grid caused lighting to be off centered 24.03.10 Builder
Pengangkutan
Lobby