PROJECT: New Approach Road KKH To ACL Wah Plant

CLIENT & CONSULTANT: ACL CONTRACTOR: ATM NIAZI


PRIME COAT / TACK COAT

DESCRIPTION OF WORK __________________________________________________________ SHEET NO: ____________________

LOCATION: ________________________________________:_____________________ DATE: ____________________

RATE OF
Wt. Of Tray + SPRAY
Wt. Of Cut back Area SPECIFIED
Sr, No. Tray No. Wt. Of Tray (gm) Cut back material
material (gm) Cm2 RATE Ltr/M2
(gm) Kg/M2 Ltr/M2

Average
REMARKS:

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

CONTRACTOR CONSULTANTS

Name: ____________________ Name: ____________________

Signature: ____________________ Signature: ____________________