HM All Unit 2021
HM All Unit 2021
GREDER 511A
DATE
REMARKS
I TOTAL I TOTAL LTR/HM
START STOP TOTAL HM LITER LITER
1 1,298.30 1,305.20 6.90 6.90 - - - MAINTENANCE CORIDOR ACES UNTIL GERGAJI RIVER
2 1,305.20 1,313.10 7.90 7.90 170.00 170.00 21.52 LAND CLEARING DISPOSAL (PAK PETRUS)
3 1,313.10 1,318.20 5.10 5.10 190.00 190.00 37.25 MAINTANENCE ROAD DISPOSAL AND LAND CLEARING DISPOSAL (PAK PETRUS)
4 1,318.20 1,318.20 - - - - #DIV/0! NO FUEL
5 1,318.20 1,318.20 - - - - #DIV/0! NO FUEL
6 1,318.20 1,325.00 6.80 6.80 360.00 360.00 52.94 LAND CLEARING DISPOSAL (PAK PETRUS)RAIN 09.00-10.25
7 1,325.00 1,329.60 4.60 4.60 - - #VALUE! LAND CLEARING DISPOSAL
8 1,329.60 1,329.60 - - - - #VALUE! NO FUEL
9 1,329.60 1,335.80 6.20 6.20 352.00 352.00 56.77 LAND CLEARING AND MAINTENANCE DISPOSAL
10 1,335.80 1,335.80 - - - - #DIV/0! NO ACTIVITY (RAIN)
11 1,335.80 1,341.90 6.10 6.10 - - - MAINTENANCE ACES TO DISPOSAL (PAK PETUS)
12 1,341.90 1,341.90 - - - - #DIV/0! NO FUEL
13 1,341.90 1,341.90 - - - - #DIV/0! NO FUEL
14 1,341.90 1,349.00 7.10 7.10 200.00 200.00 28.17 MAINTENANCE ROAD DISPOSAL AND MAKE TPK 3
15 1,349.00 1,349.00 - - - - #DIV/0! NO FUEL
16 1,349.00 1,349.00 - - - - #DIV/0! NO FUEL & PERBAIKAN DOZER (GANTI IDLER) KENDALA: NO TOOLS FOR INSTALL IDLER
17 1,349.00 1,349.00 - - - - #DIV/0! WAITING TOOLSFOR INSTALL IDLER
18 1,349.00 1,350.40 1.40 1.40 - - - TRAVELING TO DISPOSAL AND HELP TO INSTALL PIN JOIN ARM EXCA PC 200
19 1,350.40 1,350.40 - - - - #DIV/0! NO ACTIVITIES (NO FUEL)
20 1,350.40 1,350.40 - - - - #DIV/0! NO ACTIVITIES (NO FUEL)
21 1,350.40 1,359.10 8.70 8.70 370.00 370.00 42.53 LAND CLEARING PIT AREA (PAK PETRUS)
22 1,359.10 1,359.10 - - - - #DIV/0! NO ACTIVITY (ACARA ADAT DAYAK/TUHING)
23 1,359.10 1,359.10 - - - - #DIV/0! NO ACTIVITY (ACARA ADAT DAYAK/TUHING)
24 1,359.10 1,368.30 9.20 9.20 250.00 250.00 27.17 CLEARING AREA PIT & MAINTENANCE (PETRUS)
25 1,368.30 1,376.60 8.30 8.30 200.00 200.00 24.10 REPAIR ACES TO PIT AREA (PAK PETRUS)
26 1,376.60 1,384.00 7.40 7.40 300.00 300.00 40.54 MAKE ROAD ACES FROM DISPOSAL TO SET CASE AREA
27 1,384.00 1,391.00 7.00 7.00 380.00 380.00 54.29 MAINTENANCE ACES AND CLEARING AREA PIT
28 1,391.00 1,394.80 3.80 3.80 380.00 380.00 100.00 DOZING IN AREA INFRASTRUKTUR
29 1,394.80 1,397.30 2.50 2.50 110.00 110.00 44.00 DOZING IN AREA INFRASTRUKTUR AND THEN LOW POWER (FUEL NOT GOOD)
30 1,397.30 1,397.30 - - - - #DIV/0! BREAK DOWN/LOW POWER
TOTAL 99.00 99.00 3,262 3,262.00 32.95
HOUR METER BULDOZER D85SS _MBL & ACTIVITY MEI
D85SS
HOUR METER FUEL
DATE
I TOTAL I TOTAL
LTR/HM
START STOP TOTAL HM LITER LITER
1 1,397.30 1,397.60 0.30 0.30 - - 0
2 1,397.60 1,402.00 4.40 4.40 50.00 50.00 11
3 1,402.00 1,410.40 8.40 8.40 280.00 280.00 33
4 1,410.40 1,418.30 7.90 7.90 370.00 370.00 47
5 1,418.30 1,426.30 8.00 8.00 - - 0
6 1,426.30 1,427.00 0.70 0.70 400.00 400.00 571
7 1,427.00 1,427.00 - - - - 0
8 1,427.00 1,435.00 8.00 8.00 - 0
9 1,435.00 1,442.00 7.00 7.00 400.00 400.00 57
10 1,442.00 1,445.60 3.60 3.60 200.00 200.00 56
11 - - - - - - 0
12 - - - - - - 0
13 - - - - - - 0
14 - - - - - - 0
15 - - - - - - 0
16 - - - - - - 0
17 - - - - - - 0
18 - - - - - - 0
19 - - - - - - 0
20 - - - - - - 0
21 - - - - - - 0
22 - - - - - - 0
23 - - - - - - 0
24 - - - - - - 0
25 1499.3 1499.3 - - - - 0
26 1,499.30 1,509.50 10.20 10.20 450.00 450.00 44
27 1,509.50 1,518.20 8.70 8.70 - - 0
28 1,518.20 1,521.30 3.10 3.10 350.00 350.00 113
29 1,521.30 1,522.00 0.70 0.70 - - 0
30 1,522.00 1,522.00 - - - 0
31 1,522.00 1,522.00 - - - - 0
TOTAL 71.00 71.00 2,500 2,500.00 35
TER BULDOZER D85SS _MBL & ACTIVITY MEI
REMARKS
I
START STOP TOTAL HM
1 1690.2 1690.2 0
2 1690.2 1690.2 0
3 1690.2 1693.8 3.6
4 1693.8 1693.8 0
5 1693.8 1693.8 0
6 1693.8 1693.8 0
7 1693.8 1696.8 3
8 1696.7 1699.6 2.9
9 1699.6 1702.9 3.3
10
11
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31 0
TOTAL 12.80
Mine Pit, APRIL 2021
PT. Manoor Bulatn Lestari
EDY RANTE
MINE PLANING
D85SS _MBL & ACTIVITY JULI HOUR METER P
EXCAVATOR KOMATSU PC.200-01
HOUR METER
REMARKS
I
START STOP
standby, No Operator 1 11356 11360
standby, No Operator 2 11360 11360
make hauling road (operator: Rudy) 3 11360 11364
standby, No Operator 4 11364 11364
standby, No Operator 5 11364 11364
standby, No Car for deliver operator to camp putih 6 11364 11364
block by philips/ Local people (Standby) 7 11364 11367
make hauling road and then rain at 11.30 8 11367 11367
make hauling road 9 11367 11373
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
WESLY SIREGAR
KTT
HOUR METER PC-200 & ACTIVITY Juli
KOMATSU PC.200-01
OUR METER
remark
I
TOTAL HM
4 Clearing and set case the right side and left of hauling road ( total completed (7800 m)
0 Standby, No operator
4 setcase and clearing hauling road
0 No car for deliver operator to camp puth
0 No car for deliver operator to camp puth
0 No car for deliver operator to camp puth
3 block by philips/ Local people (Standby)
0 satndby problem low power
6 make hauling road
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
17.0
HOUR METER PC-400 & ACTIVITY Juli
EXCAVATOR KOMATSU PC.400-01
HOUR METER
DATE
I
START STOP TOTAL
1 11307 11313 6
2 11313 11319 6
3 11319 11327 8
4 11327 11332 5
5 11332 11340 8
6 11340 11347 7
7 11347 11356 9
8 11356 11361 5
9 11361 11365 4
10
11
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31 0.0
TOTAL 58.0
UR METER PC-400 & ACTIVITY Juli
REMARK
DATE
I
START STOP TOTAL
1 7581.4 7592.1 10.7
2 7592.1 7599.6 7.5
3 7599.6 7608.8 9.2
4 7608.8 7616.9 8.1
5 7616.9 7625.3 8.4
6 7625.3 7633.5 8.2
7 7633.5 7640.6 7.1
8 7640.6 7645.9 5.3
9 7645.9 7651.6 5.7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31 0
TOTAL 70.20
BULDOZER CAT D17 _HAJI ACONG & ACTIVITY JULI
REMARKS
I
START STOP TOTAL
1 1141 1141 0
2 1141 1141 0
3 1141 1141 0
4 1141 1141 0
5 1141 1141 0
6 1141 1141 0
7 1141 1141 0
8 1141 1141 0
9 1141 1141 0
10
11
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31 0
TOTAL 0.00
TICULATED DT-03 & ACTIVITY JULI HOUR ME
EXCAVATOR PC
HOUR ME
DATE
REMARKS
I
START
BREAKDOWN MUFFLER AND BATTERY 1 8582
BREAKDOWN MUFFLER AND BATTERY 2 8582
BREAKDOWN MUFFLER AND BATTERY 3 8585
BREAKDOWN MUFFLER AND BATTERY 4 8591
BREAKDOWN MUFFLER AND BATTERY 5 8594
BREAKDOWN MUFFLER AND BATTERY 6 8594
BREAKDOWN MUFFLER AND BATTERY 7 8602
BREAKDOWN MUFFLER AND BATTERY 8 8610
BREAKDOWN MUFFLER AND BATTERY 9 8614
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
REMARKS
LTR/HM
#REF!
HOUR METER PC 200 (RENTAL) BUDI & ACTIVITY JULI
EXCAVATOR PC 200 RENTAL
HOUR METER
REMARKS
I
STOP TOTAL
8582 0 STANDBY (NO OPERATOR)
8585 3 LAND CLEARING PIT AREA
8591 6 LAND CLEARING PIT AREA
8594 3 LAND CLEARING PIT AREA
8594 0 BREAKDOWN CELENOID
8602 8 LAND CLEARING PIT AREA AND THEN BREAKDOWN AGAIN (CELENOID)
8610 8 LAND CLEARING AREA SETLING POND
8614 4 LAND CLEARING AREA SETLING POND (BREAK DOWN HOSE HYDRAULIC)
8614 0 BREAKDOWN HOSE HIDRAULIC
0
20
MAINTENANCE ACCESS ROAD
HOUR METER BULDOZER CAT D18 _HAJI ACONG &
D85SS
HOUR METER
DATE
I
START STOP TOTAL
1 9635.0 9635.0 0
2 9635 9639.3 4.3
3 9639.3 9648.5 9.2
4 9648.5 9655.6 7.1
5 9655.6 9662.5 6.9
6 9662.5 9662.5 0
7 9662.5 9662.5 0
8 9662.5 9662.5 0
9 9662.5 9662.5 0
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL 0.00
BULDOZER CAT D18 _HAJI ACONG & ACTIVITY JULI
REMARKS
BREAKDOWN
DOZING LOADING POINT AFTER REPAIR BY MECHANIC
DOZING LOADING POINT AND MAINTENANCE ACCESS ROAD
DOZING LOADING POINT AND MAINTENANCE ACCESS ROAD
DOZING LOADING POINT AND MAINTENANCE ACCESS ROAD
BREAKDOWN, NOZZLE PIPE LEAK
BREAKDOWN, NOZZLE PIPE LEAK
BREAKDOWN, NOZZLE PIPE LEAK
BREAKDOWN, NOZZLE PIPE LEAK
FUEL
FUEL ISUED
Liter
HOUR METER ARTICULATED DT-01 & ACTIVITY JUL
ARTICULATED DT-01
HOUR METER
DATE
I
START STOP TOTAL
1 1089 1095.5 6.5
2 1095.5 1099.2 3.7
3 1099.2 1105.5 6.3
4 1105.5 1110 4.5
5 1110 1116.2 6.2
6 1115.2 1122.2 7
7 1122.2 1130.3 8.1
8 1130.3 1133.3 3
9 1133.3 1136.3 3
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL 48.30
KETERANGAN
FUEL USEFUEL
WHOLE
REMAINING
DAY AT END OF
Ltr/HM
THE DAY
LATED DT-01 & ACTIVITY JULI HOUR METER ARTI
ARTICULATED DT-02
HOUR METER
DATE
REMARKS
I
START STOP
HAULING OB FROM PIT AREA 1 1055.8 1062.4
HAULING OB FROM PIT AREA 2 1062.4 1067.2
HAULING OB FROM PIT AREA 3 1067.2 1075.3
HAULING OB FROM PIT AREA 4 1075.3 1079.7
HAULING OB FROM PIT AREA 5 1079.7 1079.7
HAULING OB FROM PIT AREA 6 1079.7 1079.7
HAULING OB FROM PIT AREA 7 1079.7 1079.7
HAULING OB FROM PIT AREA 8 1079.7 1079.7
HAULING OB FROM PIT AREA 9 1079.7 1079.7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
0.0
DATE
I FUEL ISUED
START STOP TOTAL LITER
1 9635.0 9635.0 0.0
2 9635.0 9639.3 4.3
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL 4.30 0
4.30
UR METER ARTICULATED DT-02 & ACTIVITY JULI
ULATED DT-02
OUR METER
REMARKS
I
TOTAL
6.6 HAULING OB FROM PIT AREA
4.8 HAULING OB FROM PIT AREA
8.1 HAULING OB FROM PIT AREA
4.4 HAULING OB FROM PIT AREA
0 BREAKDOWN, MUFFLER
0 BREAKDOWN, MUFFLER
0 BREAKDOWN, MUFFLER
0 BREAKDOWN, MUFFLER
0 BREAKDOWN, MUFFLER
23.90
0 - #REF!
HOUR METER BULDOZER D85SS _MBL02 & ACTIV
D85SS-02
HOUR METER
DATE
I
START STOP TOTAL HM
1 2859.1 2868.4 9.3
2 0 2874.2 2874.2
3 2874.2 2880.8 6.6
4 2880.8 2885.1 4.3
5 2885.1 2891.6 6.5
6 2887.6 2889.7 2.1
7 2889.7 2898.8 9.1
8 2898.8 2899.8 1
9 2899.8 2903.2 3.4
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL 2916.50
REMARKS
REMARKS
ER D85SS _MBL02 & ACTIVITY JULI
REMARKS