MS C A Roofed Skeleton BOQ
MS C A Roofed Skeleton BOQ
BILL No.1
KITENDE UGANDA BLDG
1.0: SUBSTRUCTURE
ELEMENT N0. 1
Disposal
Backfill and compacte selected excavated or imported materials
1.09 C.M. 453.59 16,000.00 7,257,360.00
around foundations.
11,612,373.00
11,612,373.00
Damp-proof membrane
Supply and apply 800 Gauge polythene sheeting laid over
1.15 murram with 300 mm side and end laps (measured nett-no S.M. 302.39 3,800.00 1,149,082.00
allowance for laps).
-
Concrete work
Mass concrete class 15/20 aggregate as described in:
1.20 Supply and fix 50 mm Thick blinding under :
116,140,422
ELEMENT No. 2
R. C. SUPERSTRUCTURE
In situ vibrated Reinforced concrete class 25/20 aggregate as
described in:-
207,186,891
207,186,891