Nivel de Mantenimiento

Año Horas de paro programado


Anual (Hrs) Media Vida (Hrs) Overhaul (hrs)
1 144
2 312
3 144
4 608
5 144
6 312
7 144
8 800
Subtotal 576 624 1408
Total en Ciclo Mtto 2608
Promedio Anual 326

Costo promedio de hora de Mant. Prog. (USD) $2,830


Costo de Mtto. por hora operada (USD) $115

Tren Horas operadas OP.T (10^6) N.F.


C PK-191 27,024 0.0270 28
C PK-191 31,392 0.0314 31
C PK-191 31,392 0.0314 31
C PK-171 31,392 0.0314 36
C PK-172 31,392 0.0314 20
C PK-173 31,392 0.0314 27
Tasa de falla promedio

OP.T (10^6) N.F.

Oreda 1.2.2 0.2292 482


(Gas Turbines Industrial)

Parametro 1 Parametro 2 Parametro 1


Mean Loc Mean
C PK-XXX 1060.44538706257 0
Oreda 1.2.2
(Gas Turbines 461.22 0 32
Industrial)
Nivel de Mantenimiento
Costo de paro programado
Anual (USD) Media Vida (USD) Overhaul (USD)
$337,909
$679,431
$337,909
$2,335,278
$337,909
$679,431
$337,909
$2,335,278
$1,351,636 $1,358,862 $4,670,556
$7,381,054.00
$922,631.75

Tasa de falla Horas Mant


1,036
988
988
1,147
637
860
943

Tasa de falla Mean Max

2168.15 32 456

Parametro 2
Loc
0

0
Precio
1xGE10-2
estimado [2]

Borescope Inspection: Contractor will provide Field Engineer, borescope equipment for
Planned Maintenance $19,218
Combustion Inspection: Contractor will provide Field Engineers, Craft Labor, toolings, repairs
and wear parts, mobile crane & crane operators for Planned Maintenance $318,691
HGP Inspection: Contractor will provide Field Engineers, Craft Labor, toolings, repairs and
wear parts, mobile crane & crane operators for Planned Maintenance $660,213
Combustion Inspection: Contractor will provide Field Engineers, Craft Labor, toolings, repairs
and wear parts, mobile crane & crane operators for Planned Maintenance $318,691
Major Inspection: Contractor will provide Field Engineers, Craft Labor, toolings, repairs,
wearparts, mobile crane & crane operators for Planned Maintenance $2,316,060
Combustion Inspection: Contractor will provide Field Engineers, Craft Labor, toolings,
repairs, wear parts, mobile crane & crane operators for Planned Maintenance $318,691
HGP Inspection: Contractor will provide Field Engineers, Craft Labor, toolings, repairs, wear
parts, mobile crane & crane operators for Planned Maintenance $660,213
Combustion Inspection:Contractor will provide Field Engineers, Craft Labor, toolings, repairs,
wear parts, mobile crane & crane operators for Planned Maintenance $318,691
Major Inspection:Contractor (extend scope LP) will provide Field Engineers, Craft Labor,
toolings, repairs, wear parts, mobile crane & crane operators for Planned Maintenance 2,316,060
Frequenciade
Tiempo fuera
ejecucion [hrs
de servicio
equivalentes Año BI QTY CI QTY HGPI QTY MI QTY
para mtto
de operation]
[hrs][3]
[1]

56 Yearly

144 1 1 1
8000
312 2 1 1
16000
144 3 1 1
24000
608 4 1
32000
144 5 1 1
40000
312 6 1 1
48000
144 7 1 1
56000
800 8 1
64000