Procedure 3.5 - Project Start-Up and Closedown
Procedure 3.5 - Project Start-Up and Closedown
Field Manual
07/22/2016
Procedure 3.5: Project Start-up and Closedown Revision Number:2.0
3. Reference Information:
Project Start-up Project Closedown
Policy 3.0 Governing Policy on Project Startup Policy 8.0 Governing Policy on Project
Closedown
Procedure 3.1 Pre-award Preparations Procedure 8.1 Contractual Closeout
Procedure 3.2 Pre-departure Actions Procedure 8.2 Financial Management in
Closedown
Procedure 3.3 Post-departure Actions Procedure 8.3 Personnel Management in
Closedown
Procedure 3.4 Contracts in Startup Procedure 8.4 Inventory Management at
Closedown
Procedure 3.5 Finance in Startup Procedure 8.5 IT Closeout
Procedure 3.6 Personnel in Startup Procedure 8.6 File Retention & Shipping
Procedure 3.7 IT in Startup Procedure 8.7 Technical Activity Finalization
Proprietary and confidential information for use by DAI and project staff only. Not for outside distribution.
The electronic version of the manual on a project's TAMIS is the official version and takes precedence over any other copy.
Page 1 of 3
Procedure 3.8 Procurement in Startup Procedure 8.8 Grant Program Closeout
Procedure 3.9 Security in Start -up Work Instruction 8.1 Closing Project Bank
Accounts
Procedure 3.10 Establishing Project Bank Work Instruction 8.2 Coding Costs Incurred
Accounts after Project End Date
Work Instruction 3.1 Startup Team
Composition
Work Instruction 3.2 Project Registration
Work Instruction 3.3 COP Orientation
Work Instruction 3.4 How to Choose an ISP
Work Instruction 3.5 Tips for Rapid
Deployment
Work Instruction 3.6 Field Operations Manual
Customization
Work Instruction 3.7 Handling Immediate
Cash Needs
Work Instruction 3.8 Temporary Bank Account
Considerations
Work Instruction 3.9 Convenient Card
Management
4. Recordkeeping:
The records that must be maintained during start -up and closedown are
detailed within the respective documents listed in the table above ; they are not
outlined in detail in this procedure .
5. Guidance:
Proprietary and confidential information for use by DAI and project staff only. Not for outside distribution.
The electronic version of the manual on a project's TAMIS is the official version and takes precedence over any other copy.
Page 2 of 3
Inherited UID From the draft: DB003DB6CF
Section Name: Project Compliance
Proprietary and confidential information for use by DAI and project staff only. Not for outside distribution.
The electronic version of the manual on a project's TAMIS is the official version and takes precedence over any other copy.