Kirby is providing steel structures for high-rise buildings as an alternative to concrete in select Indian cities. The document describes a project where Kirby constructed the superstructure for a 20-floor office building in Hyderabad using over 6,600 metric tons of steel. Some challenges included limited space at the construction site and noise restrictions. Kirby overcame these through techniques like lifting tools, noise reducing machines, and surveying equipment to ensure precision during assembly. The steel structure provides benefits like speed of construction, quality, and lower costs compared to concrete.
Kirby is providing steel structures for high-rise buildings as an alternative to concrete in select Indian cities. The document describes a project where Kirby constructed the superstructure for a 20-floor office building in Hyderabad using over 6,600 metric tons of steel. Some challenges included limited space at the construction site and noise restrictions. Kirby overcame these through techniques like lifting tools, noise reducing machines, and surveying equipment to ensure precision during assembly. The steel structure provides benefits like speed of construction, quality, and lower costs compared to concrete.
Kirby is providing steel structures for high-rise buildings as an alternative to concrete in select Indian cities. The document describes a project where Kirby constructed the superstructure for a 20-floor office building in Hyderabad using over 6,600 metric tons of steel. Some challenges included limited space at the construction site and noise restrictions. Kirby overcame these through techniques like lifting tools, noise reducing machines, and surveying equipment to ensure precision during assembly. The steel structure provides benefits like speed of construction, quality, and lower costs compared to concrete.
Kirby is providing steel structures for high-rise buildings as an alternative to concrete in select Indian cities. The document describes a project where Kirby constructed the superstructure for a 20-floor office building in Hyderabad using over 6,600 metric tons of steel. Some challenges included limited space at the construction site and noise restrictions. Kirby overcame these through techniques like lifting tools, noise reducing machines, and surveying equipment to ensure precision during assembly. The steel structure provides benefits like speed of construction, quality, and lower costs compared to concrete.
STEEL STRUCTURES Steel as a construction The industr y has witnessed change in Facts Sheet material for high rises adaptation of steel in high rises over Client Name: Phoenix Infocity, Hyderabad the last 5-6 years mainly because of Project Name: Phoenix Avance H09 is being accepted by various advantages it offers such as off- Building customers but only site construction, speed, quality, timely Steel Solution Provider: in select cities as the completion, etc. Indian construction industry Kirby Building Systems & Structures India building segment is still is fast evolving with increasing acceptance of Building Usage: High Rise Office Building dominated by concrete modern construction technologies with Steel Steel Tonnage: 6,600 MT (Approx.) or RCC. Kirby has taken Structures being one of them. Kirby is providing Status: Completed these steel structures with more innovative Location: Hyderabad this opportunity and is parameters such as design flexibility, easily extensively promoting accommodating aesthetic or architectural area covering the structure and development steel as an alternate features, factory controlled fabrication which of 12.37 lacs square feet – 20 floor Structure construction material for mitigates quality, transport and labour issues, consisting of Ground Podium and above 18 all high-rise buildings for green building features, longer life span, floors are Steel Structure. various applications either ease of maintenance, lower project cost, Over 6,600 MT of steel involved in construction environmental friendly and many more. with 5,600 MT of the built-up sections and 980 in the form of only steel or MT of deck sheeting. Most of the raw material in composite form. Role in the project such as plate sections etc. used in fabrication Kirby Building Systems & Structures India Pvt Ltd for this project is procured from JSW Steel, is involved in Connection Design, Detailing, Tata Steel, etc. and Deck Sheeting from JSW Manufacture, Supply and Construction of this Structural Metal Decking Ltd. High Rise Building using Structural Steel works Three sides of compound is shared with covering the superstructure part of the building. residential area and fourth side with another high rise IT facility. This jobsite is in Salient Features a very confined space with challenges of This Office Building located in the Hitech City neighborhood residential building, site logistics – IT hub of Hyderabad is being developed to and interfaces with various construction cater the requirements of IT companies within activities such as earthworks/excavation, RCC 2.65 acres allocated land area with 2 acres works and Structural Steel works.
28 CONSTRUCTION OPPORTUNITIES|FEBRUARY 2022
COVER STORY REPORT
elements within the highly congested area with vary narrow
road to the project site. • Use of special lifting tools to increase the execution such as remote ground release shackles, site developed multiple beams lifting tools, high speed bolting tools to achieve specified torque values. • Use of noise reduction bolting torque machines to reduce the noise to 40 db without compromising on the bolting speed. • Use of surveying tools like total stations and lasers for measurement accuracy and importantly the verticality of the structure to achieve the stability.
Challenges faced during the erection
• Tower Cranes inside the building - The constrained project space area and adjacent residential area challenged the The building has car parking facility up to 6th stilt level and above 12 aerial area for movement of the Tower Crane, which forced floors as Office Space. Total Height of the Structure above ground to install both the Tower Cranes inside the building. level is 71.962 meters with floor plate of 6,450 square meters. • Use of Noise reduction tools and tackles - Control on The project is designed as Composite Steel Structure with Grid of noise pollution called for use of Low Noise Bolt Tightening 11 m x 9 m, concrete infilled box columns with optimized size i.e. equipment’s deployment, without compromising the speed up to Stilt Parking Area 1100 mm x 950 mm and above office floors of construction activity. columns of size 600 mm x 600 mm to maximise the floor carpet • Logistics – Transportation of the steel structure elements within area. the city area and live IT campus. The floor to floor height for parking area is 3300 mm and office • Dimensional accuracy of the Structure – the proper planned area is 4150 mm. Fire proof paint used for columns is Vermiculite structure erection works with regular level dimensional checks Coating and Intumescent Paint. to achieve the specified size and verticality of the structure. Over 2.6 lacs safe man hours achieved with deployment of an The entire building above stilt levels i.e. office floors are having average 60-65 workmen crews daily. façade with dimensional accuracy to be maintained. The building stability calls for stringent verticality measurements, Description about the structural elements with help of the Total Station and site developed tools used to All the Columns are Box Columns with concrete infilled and Beams achieve the verticality within 6 mm. are I-Sections. Deck Sheeting is TR 60 with composite action. Safety Initiatives Uniqueness about the structure • Safety of Crew during Construction works – Induction of The Composite Steel Structure is developed for vertical spaces. new crews with health checkups for the vertigo test. Daily Tool The box columns with concrete infilled are highly optimized Box meeting with construction crew and orientation of daily and sectional element thickness, built-up “I” Section Columns activities prior to start of the work. connecting with RCC central core and peripheral four corner RCC • Stringent protocols follow-up for sanitation and hygiene of the shear wall staircases, cantilever of 2400 mm on periphery with labour colony. planter boxes. • TPI’s of all the lifting equipment and tools and tackles. All the elements of the building are double side welded as per • Used special equipment for safe erection with speed such the AWS standards with high end electrodes to have the highest as Tower Cranes, Deck Riders over the slabs at every level to precision, consistency and efficiency during welding. access the height members in above floors, use of the beam Grade of Steel used is Fe450 roller crawlers for anchoring the safety harness. • Heat stress management – Project passed through the severe Techniques used for erecting the structure heat weather and summer climate during which daily health • Total Project Management – Alignment of the Engineering, checkup of all the workmen. Production and Supply chain with site construction activity. • Covid-19 Safety of working crew – Regular sanitization of • Just in Time Philosophy – the production of the structural materials received at site and training and orientation to members were as per the construction plan and shipment of the crew including daily health monitoring. Labour colony the same with continual monitoring. sanitization and regular health checkups helped in retaining • QA/QC techniques – with meticulous and methodological the entire workforce during entire lockdown period of 45 days approach, quality checks were implemented at all the stages and started the construction as soon as the clearance was right from Raw Material to Finished Goods at plant with the given for commencement. client’s QA/QC team involvement at every level for smooth execution of the project. For more details visit: • Meticulous Logistics plan – Transportation of the steel structure www.kirbyinternational.com