Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SVS SCHOOL OF ARCHITECTURE

COIMBATORE – 642109
Area Requirements - AD IV Date : 09-08-2019
Area Statement
Site Requirements
S.No Name Area (sq.m) Notes
1 Total Site Area 15783
2 Ground Coverage(40%) 6313 Max. Coverage
3 OSR (10%) 1578
3 FSI/FAR 3.25
4 Total Built up area 20518
5 Max. Height of the Building Upto 18m
S.No Space Area Required (Sq.m)
Administration
1 Lobby 50
2 Office 30
3 Meeting 20
4 Archives 30 Storage space for Documents
5 Restrooms
6 Cubicles + 4 Urinals + 2 Wash basins
Men 35 1 Cubicle size - 1.5m X 2m

4 Cubicles + 2 Wash basins


Women 25
1 Cubicle size - 1.5m X 2m
Programme
Space Size can be varied, as per design
requirements and seater number i.e
1 Conference Room 65
12 Seater or 16 Seater to be justified
accordingly.
2 Printing / Photo-copying 40
3 Meeting Area 50
4 Group Activities Area 160
5 Technical Support Office 30
6 Technical Room 20
7 Training Room 75
8 Stationery 15
9 Gym/Recreation 100
10 Rest lounge 12 2 Rooms per floor.

Co-Working space includes the


hotdesks, private cabin etc. user ratio
is not predetermined

Types of Users:
1. Architect = 6.5 sq.m
11 Co-Working Spaces 12000 2.Interior Designer = 4.5 sq.m
3.UI/UX Designer = 3 sq.m
4.Fashion Designer = 8 sq.m
5.Product Designer = 5.6 sq.m
6.Graphic designer = 3 sq.m

Above mentioned area is for per user.

12 Party Hall/Multi-purpose Area 450


per floor, as per proper Design
13 Restrooms(Common for All spaces/floors)
justification

Men 50 6 Cubicles + 8 Urinals + 2 Wash basins


1 Cubicle size - 1.5m X 2m

8 Cubicles + 2 Wash basins


Women 50
1 Cubicle size - 1.5m X 2m
Services
1 Server Room 6 per floor
2 Phone Booth 4 per floor
3 Locker Room 15 to be designed as per standards
4 AHU Room 15 to be designed as per standards
5 Electrical Room 15 to be designed as per standards
6 CCTV/Surveilance 20 to be designed as per standards
7 Mechanical Room 15 to be designed as per standards
8 Sump Capacity to be designed as per standards
9 Panel Room 15 to be designed as per standards
1000000 litres, average consumption
10 Water tank
of 350 lires per person.
11 Transformer 25 to be designed as per standards
12 Rain Water Harvesting tank to be designed as per standards
Co-Production Spaces
1 Wood Workshop 90
2 Metal Workshop 110
3 Fabrication lab 60
4 Art Workshop 80
5 Pottery/Sculpture 75
6 Gallery 50
General area for Workshops, Student
Workshops 60 can choose any activity based on their
7 design.
Café + Dining
1 Kitchen 65
2 Dining Area 120
3 Serving Area 30
4 Waste collection 15
5 Wash Area 15
6 Storage 50 includes both dry and Cold Storage
7 Service Area 10 Loading and unloading deck
Library
1 Stacks 100 6000-8000 books
2 Readinfg Area 120
3 Informal reading area 100
4 Librarian 15
5 Photo copying 15
Parking

as per DCR,One car space for every 50


1 Total no. of Cars 126
square metres of floor area or part
thereof.
1 two-wheeler space for every
2 Total no. of Two wheelers 300
25sq.m of floor area or part thereof.
78
Note:
These given areas are the minimum requirements, these can vary based on the individuals with a proper
justification for the same.

You might also like