THE CONSORTIUM OF GS / KOGAS / DEC
S GS Engineering & Construction 0 KOREA Gas conroRATION Daewoo Engineering
DOCUMENT TRANSMITTAL
Response Required
PROJECT: Jetty Development and LNG Receiving Terminal Project December 28, 2012
To PTT LNG Company Limited 7892-GCT-FLT-12-1-2806
ATIN Mr. Natt Uttarothal / Acting Vice President Engineering 1of1
‘and Maintenance Department, PTTLNG
co + Capt. Dulapol Anussom-Nitisara / Acting Project Director
: THE CONSORTIUM OF GS / KOGAS / DEC CONTRACT NO. — : PTTLNGI2/001/2008
Mr. Ihn-Koo Kang / Project Manager REFERENCE
THE FOLLOWING TI orawines Bi vocumens LD Proceoure
[1 venoor prints [] Reauismon LD sreciricanion
ARE TRANSMITTED C1 ForinrorMarion [] FoR Review IB FoR APPROVAL
WEREWITH Oe O wo CO For Finat
THESE DocumENTS Are —_[] OTHER [1 catecory x: Bh catecory z
DRAWINGS OR DOCUMENT NO. REV.NO. NO. OF COPIES DESCRIPTION OR TITLE
7892-06011-CO-TP-840 ° 2c Method Statement for Re-Calibration
of PSV-039
-LAST ITEM.
: PTTLNG in Thailand
PMC in Thailand
: PTTLNG/PMC in Seoul Office ‘SIGNED LY. ve
KOGAS in S00u Ofee, required AO Token Kang
DEC in Seoul Office, if required Project Manager
KOGAS-Tech in Seoul Office, if required For and on behalf of the Consortium of GS/KOGAS/DEC
7
NOTE
H)_PLEASE RETURN ONE COPY OF ABOVE WITH YOUR COMMENTS ANDIOR APPROVAL
IlE__PLEASE RETURN DUPLICATE COPY OF TRANSMITTAL WITH SIGNATURE
‘THE ABOVE DOCUMENT WAS RECEIVED BY
SIGNATURE TITLE DATE