Download as pdf
Download as pdf
You are on page 1of 1
THE CONSORTIUM OF GS / KOGAS / DEC ~ ; (GF GS Engineering & Construction 0 KOREA Gas corPoraTION Daewoo Engineering DOCUMENT TRANSMITTAL Response Required PROJECT: Jetty Development and LNG Receiving Terminal Project DATE : December 28, 2012 To : PTTLNG Company Limited TR. NO. 7802-GCT-FLT-12-1-207 ATTN. :Mr. Natt Uttarothai/ Acting Vie President Engineering Page soft and Maintenance Department, PTTLNG ce Capt. Dulapol Anussom-Nitisara / Acting Project Director FROM ‘THE CONSORTIUM OF GS/ KOGAS / DEC CONTRACT NO. PTTLNG/2/001/2008 Mr. thn-Koo Kang / Project Manager REFERENCE THE FOLLOWING TD orawines Bi vocumenrs Ty procepure [1 venoor prints [] Reauismion 10 sPeciricanion [ARE TRANSMITTED [J ForinrorMation [] FoR REVIEW IE FoR APPROVAL HEREWITH Ore Ow 1 For FINAL THESE DOCUMENTS ARE [OTHER L catecory x: Bi catecony DRAWINGS OR DOCUMENT N REV.NO. NOLOFCOPIES DES n 17892-06011-CO-TP-.541 ° 2c Method Statement for GRE Pipe Modification {ORV-D) AASTITEM. : PTTLNG in Thailand PMC in Thailand 4T : PTTLNG/PMC in Seoul Office ‘SIGNED e. * KOGAS in Seoul Office, if required PO neko Kana DEC in Seoul Office, if required Project Manager KOGAS-Tech in Seoul Office, if required For and on behalf of the Consortium of GS/KOGAS/DEC NOTE TE PLeAse RETURN ONE COPY OF ABOVE WITH YOUR COMMENTS ANDIOR APPROVAL IME PLEASE RETURN DUPLICATE COPY OF TRANSMITTAL WITH SIGNATURE ‘THE ABOVE DOCUMENT WAS RECEIVED BY ‘SIGNATURE TITLE DATE

You might also like