THE CONSORTIUM OF GS / KOGAS / DEC
~ ;
(GF GS Engineering & Construction 0 KOREA Gas corPoraTION Daewoo Engineering
DOCUMENT TRANSMITTAL
Response Required
PROJECT: Jetty Development and LNG Receiving Terminal Project DATE : December 28, 2012
To : PTTLNG Company Limited TR. NO. 7802-GCT-FLT-12-1-207
ATTN. :Mr. Natt Uttarothai/ Acting Vie President Engineering Page soft
and Maintenance Department, PTTLNG
ce Capt. Dulapol Anussom-Nitisara / Acting Project Director
FROM ‘THE CONSORTIUM OF GS/ KOGAS / DEC CONTRACT NO. PTTLNG/2/001/2008
Mr. thn-Koo Kang / Project Manager REFERENCE
THE FOLLOWING TD orawines Bi vocumenrs Ty procepure
[1 venoor prints [] Reauismion 10 sPeciricanion
[ARE TRANSMITTED [J ForinrorMation [] FoR REVIEW IE FoR APPROVAL
HEREWITH Ore Ow 1 For FINAL
THESE DOCUMENTS ARE [OTHER L catecory x: Bi catecony
DRAWINGS OR DOCUMENT N REV.NO. NOLOFCOPIES DES n
17892-06011-CO-TP-.541 ° 2c Method Statement for GRE Pipe Modification
{ORV-D)
AASTITEM.
: PTTLNG in Thailand
PMC in Thailand
4T : PTTLNG/PMC in Seoul Office ‘SIGNED e. *
KOGAS in Seoul Office, if required PO neko Kana
DEC in Seoul Office, if required Project Manager
KOGAS-Tech in Seoul Office, if required For and on behalf of the Consortium of GS/KOGAS/DEC
NOTE
TE PLeAse RETURN ONE COPY OF ABOVE WITH YOUR COMMENTS ANDIOR APPROVAL
IME PLEASE RETURN DUPLICATE COPY OF TRANSMITTAL WITH SIGNATURE
‘THE ABOVE DOCUMENT WAS RECEIVED BY
‘SIGNATURE TITLE DATE