Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Format for furnishing the details by the States/ UTs: Annexure

Committed Liability Details of PMKVY CSSM (2016-2020) as on 28.02.2022

Total Revised Total Funds Total Funds Spent Total Committed Balance Additional Funds required
Sanctioned Received for for CSSM-PMKVY Liability for CSSM- unutilized/ for implementation of
Amount for CSSM-PMKVY 2.0 2.0 (2016-20) PMKVY 2.0 (2016- unspent funds of PMKVY 3.0 (2020-21)
CSSM-PMKVY 2.0 (2016-20) from (till 28.02.2022) 20) CSSM-PMKVY 2.0 (F)
(2016-20) as per MSDE (C) (till 28.02.2022) (2016-20) with
MSDE’s circular (B) (D) the State/UT
no. B- after adjusting all
12011/01/2016- the remaining
SDE dated committed
27.05.2019 liability for the
(A) training under
CSSM-PMKVY 2.0
(2016-20), which
can be utilized
under PMKVY 3.0
(2020-21)
[E=B – (C+D)]
133,16,26,842.00 38,04,64,812.00 17,54,02,155.69 27,84,11,619.89 -7,33,48,963.58 5,93,90,701.00 (STT)
-7.33 (Appx.) 5.94 CR (Appx.)

You might also like