Professional Documents
Culture Documents
Kalselteng 2 CFSPP (2 X 100Mw) : Pt. Tekniko HEC Pt. PLN
Kalselteng 2 CFSPP (2 X 100Mw) : Pt. Tekniko HEC Pt. PLN
Kalselteng 2 CFSPP (2 X 100Mw) : Pt. Tekniko HEC Pt. PLN
REVIEW
LOG DATE ELECT
IN COMM NO I&C
A APPROVED SUPPORT
B APPROVED AS NOTE CONTRACTOR
C NOT APPROVED RECORD
D INFORMATION WORKING DOCUMENT
DISTRIBUTION
APPROVAL DOES NOT RELIEVE APPROVED BY
CONTRACTOR FROM RESPONSIBLE
FOR ERROR OR DEVIATIONS FROM
CONTRACT REQUIREMENTS
( )
BY : DATE :
LOG DATE
OUT COMM NO.
OWNER :
PT. PLN ( PERSERO )
Jl. Trunojoyo Blok M I/135, Kebayoran Baru Jakarta 12610
Phone : +62-21-7261875,7261122,7262234, Fax : +62-21-7221330
e-mail : webmaster@pln.co.id
Contract Agreement No. 1594.PJ/DAN.02.01/DIR/2016
PROJECT :
KALSELTENG 2 CFSPP (2 X 100MW)
PLN DOC NO 1 0 1 1 8 3 - 0 0 - A - 1 3 - Y Y B - 1 8 9 - 1 1 - 0 0
CONTRACTOR :
CONSORTIUM OF
PT TRUBA JAYA ENGINEERING - HYUNDAI ENGINEERING CO.,LTD. - ITOCHU CORPORATION
REV.
SUBCONT/VENDOR DOC. NO. 0
TABLE OF CONTENTS
1. TABLE OF CONTENT…..............................................................................................................
1
2. INSPECTION TEST PLAN…........................................................................................................
2
3. MATERIAL INSPECTION REPORT BACKFILL MATERIAL…....................................................... 3
4. BACKFILL INSPECTION & TEST PLAN…................................................................................... 4
5. ATTACHMENT….......................................................................................................................
5
5.1. CALIBRATION CERTIFICATE SPEEDY TESTER GAUGE
5.2. CALIBRATION CERTIFICATE DIGITAL SCALE
5.2. TRAINER CERTIFICATE
PT TEKNIKO INDONESIA
INSPECTION AND TEST PLAN BACKFILLING
AT ALL AREA
Contract doc No : IKCP0-YYB-G-05-189 Subcon: TEKNIKO
DESCRIPTION PLTU CFSPP ( 2 x 100 MW ) PAGE : 2
PROJECT ASAM ASAM KASELTENG 2 REV : 0
Inspection Activity
Inspection
NO Item Activity Referance Document Verifying Document CONTRAC- Owner Remarks
Location SUBCON
TOR PLN
Technical Specification & Procedure
Review all technical specifications, drawing, procedures & work instructions
1.1
1.1.1 All Tech. Spec., Drawings, Proc. are latest revision
Management System Manual, Standard Operating
All tech. spec., drawing, procedures, work instruction shall be clarified, Approved General Instruction, Technical Specification & P/R R/A R/A
1.0. 1.2 Procedure, Document Contract Agreement, -
understood and implemented accordingly Procedures, drawings, etc.
Standard & Code
1.3 Finalise deviation, generate new procedure and work instruction
if required
1.4 Handover work area document W W R
Surface Preparation
2.1 Site clearance condition (Clearing, Grubbing And Stripping)
Clearing includes removal and disposal of trees and downed timber, bush, hedges, bushes
2.2 and other vegetation or organic materials; and rubbish, debris or other foreign or
objectionable materials at grade, except the removal of topsoil.
Grubbing includes removal and disposal of stumps, large roots, buried logs and other
2.3 Applicable Specification, Official Certificate & Material Inspection Subcontractor
2.0 objectionable materials to 1,000 mm below ground surface. Tech. Spec., Drawing, Proc., Gen. Instruction H W RW
Report Workshop
2.4 Measurement of existing ground profile before excavation
2.5 Routing of dewatering discharge lines
Removing of all rubbish , humus, vegetable matter and all or part of the organic topsoil in
2.6
the respective areas, which can be removed by simple excavation methods.
All materials excavated during clearing, grubbing and stripping operations shall be wasted
2.7
in disposal areas
Excavation
Excavation including construction of temporary diversion ditches, culverts, temporary
3.1
access road etc.
3.2 Coordinate and leveling must be check with refer to benchmark Tech. Spec., Drawing, , Proc., Gen. Instruction, Applicable Specification Approved Drawing, Applicable FIELD (ON
3.0 H W RW
3.3 Bottoms of all excavations must be trimmed to line and grade. Standard & Code. Specification & Report Fabrication SITE)
Protection and Support shall be arranged for minimum interference with Electrical,
3.4
mechanical, Piping etc if any.
3.5 Minimum excavation from pipelines, conduits, and the side of trench.
Fill / Backfill Material
General fill material shall be well graded, no more than 15 % passing
4.1
4.0 No. 200 screen, maximum particle size 75 mm
4.2 Type structural fill material
4.3 Optimum moisture content
4.4 Trench Fill material Sand material
Tech. Spec., Drawing, , Proc., Gen. Instruction, Applicable Specification Approved Drawing, Applicable FIELD (ON
4.5 Field Compacted around Structures H W W
Standard & Code. Specification & Report Fabrication SITE)
4.6 Field Compacted Backfill around pipe trench
4.7 Field Compacted Backfill around Fiberglass Reinforced Pipe (FRP)
4.8 Height of backfill
4.9 Maximum size of stone in the backfill material
4.10 Lab test for General backfill materials with gradations / Sieve analisys Test
4.11 Heavy Equipment compacted rolling around structure
Fill/Back Fill Test Frequency Tech. Spec., Drawing, , Proc., Gen. Instruction, Applicable Specification Approved Drawing, Applicable FIELD (ON
5,0
5.1 Bearing test interval frequency Standard & Code. Specification SITE) H W W
Documentation
6.1 Summary monitoring or Quality Inspection report activity R&A R&A
Approved Drawing ,Applicable Specification,All Quality Document
6,0 6.2 Calibration Certificate of equipment test Contract, Tech. Spec., Proc. R
as per Contract (Inspection Reports, NCR, MDR,Warranty, Punch
6.3 QAQC review of site generated document R R
List, Etc.)
6.4 Mill certificate material & manufacture certificate
Legend : P = Preparation, W = Witness, SW = Spot Witness, RW = Random Witness, R = Document Review, H = Hold Points, A=Approved
Standard and code : ASTM Mechanical Test : Destructive Test
: DIN : Non Destructive Test
: AS/NZS
KALSELTENG 2 CFSPP (2 X 100MW)
OWNER : PT PLN (PERSERO)
CONTRACTOR :
CONSORTIUM OF
PT TRUBA JAYA ENGINEERING - HYUNDAI ENGINEERING CO.,LTD. - ITOCHU
CORPORATION
TITLE :INSPECTION AND TEST PLAN AT BUILDING BACKFILLING AT ALL AREA Subcon: TEKNIKO
Contract Doc No : IKCP0-YYB-G-05-189 PAGE : 3
INSPECTION AND TEST REPORT FOR EXCAVATION / GRADING
Sub-Cont : No. Report :
Subject : Date :
Check
No Description Acceptance Criteria Remark
Acc. Rej. N/A
EXCAVATION
1.1 The work site is cleared Visual
1.2 All the grasses, weeds & roots are stripped and removed Visual
slope is not less than 1
1.3 Excavation is performed to the lines, grades and slopes vertical to 2 horizontal
1 or method statement
1.4 Excavation is kept free from water all the time Visual
1.5 Soil condition at the bottom of excavation Visual
1.6 Surface drainage and slope of excavation is safe Visual
1.7 Soil is contaminated ? (Y/N) Visual
GRADING (LEVELING & DRESSING)
2.1 Position check (Width, length shown on approved
Drawing
drawing)
Accepted Rejected
* Note
TITLE :INSPECTION AND TEST PLAN AT BUILDING BACKFILLING AT ALL AREA Subcon: TEKNIKO
Contract Doc No : IKCP0-YYB-G-05-189 PAGE : 4
INSPECTION AND TEST REPORT FOR FILLING / BACKFILLING
Sub-Cont : No. Report :
Subject : Date :
Check
No Description Acceptance Criteria Remark
Acc. Rej. N/A
Backfilling area is cleaned and all obstructions/ waste
1 Visual
materials removed?
Bedding
Underground Utility and Installation Refer to Interface each
2
Embedded items: Pipe, Cables etc. Pressure/Leakage dicipline
Test
No of layers required N/A
3 As per method
Maximum Thickness of each Layer
statement
Accepted Rejected
* Note
TITLE :INSPECTION AND TEST PLAN AT BUILDING BACKFILLING AT ALL AREA Subcon: TEKNIKO
Contract Doc No : IKCP0-YYB-G-05-189 PAGE : 5
INSPECTION AND TEST REPORT FOR FILLING / BACKFILLING
Sub-Cont : No. Report :
Subject : Date :
Layer No.:
Ƴdry lab (gr/cc) =
Optimum Moisture Content (speedy test) =
Ƴsand (gr/cc) =
Accepted Rejected
* Note