Total height of Beam

25.00 inch

Effective Frange width


16t+bw
L/4*12
c/c distance)

beffective

T Beam Check
For negative moment this Beam will not act as
So we will check omly for positive moment
Mu
90.00 kip-ft

So T Beam analysis is requred.The Beam sct a

Alfa
0.85

M moment
188.18 kip-ft
Reinforcement Design
M
90.00 kip-ft
1080.00 kip-inch

Bar No
#4
#5
#6
#7
#8
#9
#10
#11

Provide
reinforcement desing for top B
Mu
188.18 kip-ft
2258.16 kip-inch
SLAB THIKNESS 6 Inch
HATCH AREA 266 ft^2

LOAD FROM SLAB


FF 25 psf
PW 30 psf
SW 39900 psf
Total DL 39955 psf
39.96 kip

LL 45 psf

Width bw frange Dipth of web (hw) DL WEB Total DL Beam lnth


12 inch 6 inch 19 inch 5937.5 45.89 kip 20 ft
5.94 kip

Effective Frange width


412 inch
60 inch
144 inch

60 inch

T Beam Check
ve moment this Beam will not act as a T Beam
check omly for positive moment Mu 90.00 kip-ft
M Fct(fiy) fy fc' d a or hf clear cover
0.9 60 ksi 3 ksi 22.50 inch 6 2.50
60000 psi 3000 psi

m analysis is requred.The Beam sct as areactangular Beam (p)max=alfa*beta*


d Check
Beta Sum of( uc) Sum of (uy) row(p)max
0.85 0.003 0.005 0.013546875

1-0.59*(p)*(fy/fc’ dreq Design ok M=M Fct(fiy)*(P)*fy*bd^


0.840146875 17.50 inch 1
`

Reinforcement Design for Bottom Bar


a As
0.5 0.898876404494382 a=(As*fy)/(.85fc’b)
1.76250275391055 0.925122926804412 As=M/(fiy)*fy*(d-(a/2))
1.81396652314591 0.926225373799108
1.81612818391982 0.926271737984953 As (min) = 3*sqrtfc’/fybwd≥200bw
1.81621909408814 0.926273687965196
1.81622291757882 0.926273769977448 As(min) 0.73942545
1.81622307838715 0.926273773426719 So, As(min) 0.90 inch^2
so,As 0.93 inch^2

Take maximum value


So,As(req) 0.93 inch^2

Steel Dia Bar Area Number of Steel Req Top bar


12mm 0.20 inch^2 4.6313688671336 5 Nos 10.1993987
16mm 0.31 inch^2 2.98797991427974 3 Nos 6.58025724
20mm 0.50 inch^2 1.85254754685344 2 Nos 4.07975949
22mm 0.60 inch^2 1.54378962237787 2 Nos 3.39979957
25mm 0.79 inch^2 1.17249844737559 2 Nos 2.58212626
30mm 1.10 inch^2 0.842067066751563 1 Nos 1.85443613
32mm 1.29 inch^2 0.718041684826914 1 Nos 1.58130213
35mm 1.54 inch^2 0.601476476251116 1 Nos 1.32459724

2- #6 Use in Bottom Bar Provide


reinforcement desing for top Bar
a As
0.5 1.8794506866417
3.68519742478764 2.02434842580452
3.96931063883239 2.03836583927128
3.99679576327702 2.03973218953095
3.99947488143323 2.03986547278834
3.99973622115361 2.03987847509182
3.99976171586631 2.03987974352629
So,As 2.04 inch^2

As(req) 2.04 inch^2


A=0.5(L1+L2)*h
UP
L2 20 ft AREA
L1 9 ft 116 ft
Land h1 8 ft
DOWN tan 45=perpandicular/Land
L2 25 ft AREA
L1 5 ft 150 ft
Land h2 10 ft

UDL DL LL LL udl Wu
2.29 kip-ft 11.97 kip 0.60 kip-ft 4.23 kip-ft

(-ve) moment Upper in two side of Bea


(+ve) moment lower side on Beam
(+ve) moment lower side on Beam(midd

As=Mu/(M Fct*fy(d-(a/2))

a=As*fy/(.85fc'b)

b As Check a Check a< hf


12 1.03 inch^2 2.01 inch^2 1

(p)max=alfa*beta*(fc’/fy) * sum uc/(sumuc+sumuy)

M=M Fct(fiy)*(P)*fy*bd^2*(1-0.59*(p)*(fy/fc’))
in) = 3*sqrtfc’/fybwd≥200bwd/fy

≥ 0.9

Top bar
11 Nos
7 Nos
5 Nos
4 Nos
3 Nos
2 Nos
2 Nos
2 Nos

5- #6 Use in Top Bar

Top Bar
5 Nos #6

2 Nos #6 Bottom Bar


tan 45=perpandicular/Land

moment
ment Upper in two side of Beam = 1/12 =..08WuL^2 WuL^2/8
ment lower side on Beam = 1/14 =.07 WuL^2 WuL^2/10
ment lower side on Beam(middle Beam)=1/16=.06 WuL^2 WuL^2/12

Max Moment
(-ve) (+ve)
ct*fy(d-(a/2)) 141.00 kip-ft 120.86 kip-ft