Check for Line,level,alignment,plumb,supports and mould release Oil
12 etc. of Shuttering
Position of Construction Joints,Embedment plates,Pipe inserts,if
13 any,etc.as per Drawing
Check for availability of Batching Plant,Transit Mixers,Placer
Pump,Vibrators, approved Curing arrangements (Hessian cloth, 14 polyethelene sheet, approved curing compound), air Compressor, calibrated thermometer,Slump Cone and Cube Moulds etc. before start of Concreting
Check for MEP works provisions as per drawing and clearance
15 obtained from MEP Enginner
Check for provisions of Railway systems as per drawing and clearance