TPM-PF-01

EMPLOYER: PROJECT Name: PROJECT MANAGER : CONSULTANT: CONTRACTOR: REF. No.

Network Development - Road Widening - Secondary Roads,


Buenavista - Kawayan Road, K0056 + 851 - K0059 +400 DAILY SITE REPORT ENGR. JOEY JAVIER

SHEET No.

Contract Package No. : 20FJ0012 PID No: 139 1 of 1

ON SITE STAFF & LABOUR RECORD DAY: _______


MONDAY DATE: 24-May-21 ON SITE PLANT & EQUIPMENT RECORD
Item TRADE Nos. Hrs. Item TRADE Nos. Hrs. No. CATEGORY Nos. Hrs. No. CATEGORY Nos. Hrs.
INDIRECT MANPOWER: LABORER 2 16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1 Backhoe Hyundai R140W-95 0967 EQ-245 1 6

A. Mgt & Supervision 2 16 1 Romeo Cos 1 8 X 2 Backhoe Lonking CDM6150 EQ-288 1 6

1 Jose G. Cayao Jr. 1 8 2 Joel Gimena 1 8 TOTAL HRS: 8 3 Dumptruck HOWO A7371 EQ-001 1 6
2 Jusan Santisima 1 8 3 TEMPERATURE: Low: __ °C High: __ °C 4 Dumptruck HOWO A7371 EQ-223 1 6

3 4 5 Sinutruck 6wheeler EQ-852 1 6

5 6 Vibratory Roller EQ- 875 0 0

B. WAREHOUSEMAN 1 8 MATERIALS DELIVERED TO WORK SITE 7 Backhoe EQ- 903 0 0

1 Gerald Eras 1 8 No. MATERIAL Qty. Unit 8 Grader EQ-348

C WATCHMAN 1 8 1 9 Truck Mixer EQ-872 0 0


1 Joselino Columna 1 8 2 10 Truck Mixer EQ-228 0 0
3 11 Truck Mixer EQ-051 0 0

D DRIVERS/OPERATORS 5 30 4 12

1 Jerry Cortez 1 6 5 13

2 Mario Espares 1 6 6 14

3 Jesson Rodrigo 1 6 7

4 Roy Balendres 1 6 0 0 8 TOTAL PLANT & EQUIPMENT IN GOOD CONDITION: 5 30


5 Fernando Lee 1 6 9

6 Dante Arupo 0 0 10 TOOLS


7 Solitaire Bermudo 0 0

9 Nestor Villaranda 0 0

10 Saldivar 0 0

11 Romeo Roce 0 0

TOTAL INDIRECT: 9 62
No. CATEGORY Qty. Unit No. CATEGORY Qty. Unit
1 1

DIRECT MANPOWER: 2 2

A FOREMAN 6 48 3 3

1 Genie Merdegia 0 0 4 4

2 5 5

B MASON AND CARPENTER 3 24 6 6

1 Teriso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 0 0

4 Roger Serafin 1 8 TOTAL DIRECT: 11 88 TOTAL: 0

VISITORS DESCRIPTION OF WORKS ACCOMPLISHED ISSUES & CONCERNS


No. NAME CO. No. WORKS Qty. Unit No. Description
1 1 Construction of headwall at station 57+694 1
2 2 Concreting of line canal. 2 WAITING FOR TREE CUTTING PERMIT
3 3 Subgrade preparation. 3
4 4 Batching at PID 152 4
5 5 5
6 6 6
7 7 7
8 8 8
9 9 9
10 10 10
11 11 11

Distribution: REMARKS: Prepared by:


Original to contractor Engr. Jose G. Cayao Jr. Signature:
Client
Project Manager Submitted by:
Consultant Signature:
Other
EMPLOYER: PROJECT Name:

Network Development - Road Widening - Secondary Roads


Buenavista - Kawayan Road, K0056 + 851 - K0059 +400

Contract Package No. : 20FJ0012


ON SITE STAFF & LABOUR RECORD
Item TRADE Nos. Hrs. Item TRADE
INDIRECT MANPOWER: C LABORER

A. Mgt & Supervision 2 16 1 Romeo Cos

1 Jose G. Cayao Jr. 1 8 2 Joel Gimena

2 Jusan Santisima 1 8 3

3 4

B. WAREHOUSEMAN 1 8

1 Gerald Eras 1 8

C WATCHMAN 1 8

1 Joselino Columna 1 8

D DRIVERS/OPERATORS 4 24

1 Jerry Cortez 1 6

2 Mario Espares 0 0

3 Jesson Rodrigo 1 6

4 Roy Balendres 1 6

5 Fernando Lee 1 6

6 Dante Arupo 0 0

7 Solitaire Bermudo 0 0

9 Nestor Villaranda 0 0

10 Noel Badillo 0 0

11 Romeo Roce 0 0

TOTAL INDIRECT: 8 56
DIRECT MANPOWER:

A FOREMAN 1 8

1 Genie Merdegia 1 8

B MASON AND CARPENTER 3 24


1 Teriso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 1 8

4 Roger Serafin 0 0 TOTAL DIRECT:

VISITORS DESCRIPTION OF
No. NAME CO. No. WO
1 1 Construction of headwall at station 57+694
2 2 Concreting of line canal.
3 3 Subgrade preparation.
4 4 Batching at PID 152
5 5
6 6
7 7
8 8
9 9
10 10
11 11

Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
ning - Secondary Roads,
56 + 851 - K0059 +400 DAILY SITE REPORT
PID No: 139

DAY: _______
TUESDAY DATE: 25-May-21
Nos. Hrs.
2 16 WEATHER: Sunny Cloudy Rainy Windy Stormy

1 8 X
1 8 TOTAL HRS: 8
TEMPERATURE: Low: __ °C High: __ °C

MATERIALS DELIVERED TO WORK SITE


No. MATERIAL Qty. Unit
1

0 0 8

10
6 48

DESCRIPTION OF WORKS ACCOMPLISHED


WORKS Qty. Unit No.
all at station 57+694 1
l. 2
3 GRADER IS AT PID 140
4 EQ903 BATCHING FOR
5
6
7
8
9
10
11
PROJECT MANAGER : CONSULTANT:

ENGR. JOEY JAVIER

ON SITE PLANT & EQUIPMENT RECORD


No. CATEGORY Nos. Hrs. No.
1 Backhoe Hyundai R140W-95 0967 EQ-245 1 6
2 Backhoe Lonking CDM6150 EQ-288 0 0
3 Dumptruck HOWO A7371 EQ-001 1 7
4 Dumptruck HOWO A7371 EQ-223 1 7
5 Sinutruck 6wheeler EQ-852 1 7
6 Vibratory Roller EQ- 875 1 8
7 Backhoe EQ- 903 1 8
8 Grader EQ-348
9 Truck Mixer EQ-872 0 0
10 Truck Mixer EQ-228 0 0
11 Truck Mixer EQ-051 0 0
12

13

14

TOTAL PLANT & EQUIPMENT IN GOOD CONDITION:

TOOLS

No. CATEGORY Qty. Unit No.


1 1
2 2

3 3

4 4

5 5

6 6

TOTAL:

ISSUES & CONCERNS


Description
NO WORKERS FOR PCCP (MR. AREVALO, SUBCON) WAITING FOR THE RELEASE OF HIS BILLING NO. 1.
WAITING FOR TREE CUTTING PERMIT
GRADER IS AT PID 140
EQ903 BATCHING FOR PID 152

Prepared by:
Engr. Jose G. Cayao Jr. Signature:

Submitted by:
Signature:
TPM-PF-01
CONTRACTOR: REF. No.

SHEET No.
1 of 1

NT RECORD
CATEGORY Nos. Hrs.

6 43

CATEGORY Qty. Unit


0

F HIS BILLING NO. 1.

Signature:

Signature:
EMPLOYER: PROJECT Name:

Network Development - Road Widening - Secondary Roads,


Buenavista - Kawayan Road, K0056 + 851 - K0059 +400

Contract Package No. : 20FJ0012 PID No:

ON SITE STAFF & LABOUR RECORD


Item TRADE Nos. Hrs. Item TRADE Nos.
INDIRECT MANPOWER: C LABORER 2

A. Mgt & Supervision 2 16 1 Romeo Cos 1

1 Jose G. Cayao Jr. 1 8 2 Joel Gimena 1

2 Jusan Santisima 1 8 3

3 4

B. WAREHOUSEMAN 1 8

1 Gerald Eras 1 8

C WATCHMAN 1 8

1 Joselino Columna 1 8

D DRIVERS/OPERATORS 6 36

1 Jerry Cortez 1 6

2 Mario Espares 0 0

3 Jesson Rodrigo 1 6

4 Roy Balendres 1 6 0

5 Fernando Lee 1 6

6 Dante Arupo 1 6

7 Solitaire Bermudo 1 6

9 Nestor Villaranda 0 0

10 Noel Badillo 0 0

11 Romeo Roce 0 0

TOTAL INDIRECT: 10 68
DIRECT MANPOWER:

A FOREMAN 1 8

1 Genie Merdegia 1 8

B MASON AND CARPENTER 3 24


1 Teriso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 1 8

4 Roger Serafin 0 0 TOTAL DIRECT: 6

VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Construction of headwall.
2 2 Excavation for line canal.
3 3 Subgrade preparation.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11

Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :

econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE

139

DAY: _______
WEDNESDAY DATE: 26-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1

8 X 2

8 TOTAL HRS: 8 3

TEMPERATURE: Low: __ °C High: __ °C 4

MATERIALS DELIVERED TO WORK SITE 7

No. MATERIAL Qty. Unit 8

1 Electric drill 1 set 9

2 10

3 11

4 12

5 13

6 14

0 8 TOTAL PLANT & EQUIPMENT

10
No.
1

48 TOTAL:

ESCRIPTION OF WORKS ACCOMPLISHED


WORKS Qty. Unit No.
1 WAITING FOR TREE CUTTING PE
2
3
4
5
6
7
8
9
10
11

Prepared by:

Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:

ENGR. JOEY JAVIER

ON SITE PLANT & EQUIPMENT RECORD


CATEGORY Nos. Hrs. No. CATEGORY
Backhoe Hyundai R140W-95 0967 EQ-245 1 6

Backhoe Lonking CDM6150 EQ-288 0 0

Dumptruck HOWO A7371 EQ-001 1 6

Dumptruck HOWO A7371 EQ-223 1 6

Sinutruck 6wheeler EQ-852 1 6

Vibratory Roller EQ- 875 1 6

Backhoe EQ- 903 1 6

Grader EQ-348 0 0

Truck Mixer EQ-051 0 0

Truck Mixer EQ-228 0 0

Truck Mixer EQ-872 0 0

TOTAL PLANT & EQUIPMENT IN GOOD CONDITION:

TOOLS
CATEGORY Qty. Unit No. CATEGORY
1

TOTAL:

ISSUES & CONCERNS


Description
WAITING FOR TREE CUTTING PERMIT

Prepared by:
Engr. Jose G. Cayao Jr. Signature:

Submitted by:
Signature:
TPM-PF-01
REF. No.

SHEET No.
1 of 1

Nos. Hrs.

6 36
Qty. Unit

0
EMPLOYER: PROJECT Name:

Network Development - Road Widening - Secondary Roads,


Buenavista - Kawayan Road, K0056 + 851 - K0059 +400

Contract Package No. : 20FJ0012 PID No:

ON SITE STAFF & LABOUR RECORD


Item TRADE Nos. Hrs. Item TRADE Nos.
INDIRECT MANPOWER: C LABORER 2

A. Mgt & Supervision 2 16 1 Romeo Cos 1

1 Jose G. Cayao Jr. 1 8 2 Joel Gimena 1

2 Jusan Santisima 1 8 3

3 4

B. WAREHOUSEMAN 1 8

1 Gerald Eras 1 8

C WATCHMAN 1 8

1 Joselino Columna 1 8

D DRIVERS/OPERATORS 7 44

1 Jerry Cortez 1 6

2 Arnel 1 6

3 Jesson Rodrigo 1 6

4 Roy Balendres 1 6 0

5 Fernando Lee 1 6

6 Dante Arupo 1 8

7 Solitaire Bermudo 1 6

9 Nestor Villaranda 0 0

10 Noel Badillo 0 0

11 Romeo Roce 0 0

TOTAL INDIRECT: 11 76
DIRECT MANPOWER:

A FOREMAN 1 8

1 Genie Merdegia 1 8

B MASON AND CARPENTER 4 32


1 Tereso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 1 8

4 Roger Serafin 1 8 TOTAL DIRECT: 7

VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Construction of headwall.
2 2 Subgrade preparation.
3 3 Concreting of line canal.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11

Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :

econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE

139

DAY: _______
THURSDAY DATE: 27-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1

8 X 2

8 TOTAL HRS: 8 3

TEMPERATURE: Low: __ °C High: __ °C 4

MATERIALS DELIVERED TO WORK SITE 7

No. MATERIAL Qty. Unit 8

1 9

2 10

3 11

4 12

5 13

6 14

0 8 TOTAL PLANT & EQUIPMENT

10

11

12

13

14

15
No.
1

56 TOTAL:

ESCRIPTION OF WORKS ACCOMPLISHED


WORKS Qty. Unit No.
1
2 WAITING FOR TREE CUTTING PE
3
4
5
6
7
8
9
10
11

Prepared by:

Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:

ENGR. JOEY JAVIER

ON SITE PLANT & EQUIPMENT RECORD


CATEGORY Nos. Hrs. No. CATEGORY
Backhoe Hyundai R140W-95 0967 EQ-245 1 6

Backhoe Lonking CDM6150 EQ-288 1 6

Dumptruck HOWO A7371 EQ-001 1 6

Dumptruck HOWO A7371 EQ-223 1 6

Sinutruck 6wheeler EQ-852 1 6

Vibratory Roller EQ- 875 1 8

Backhoe EQ- 903 1 6

Grader EQ-348

Truck Mixer EQ-051 0 0

Truck Mixer EQ-228 0 0

Truck Mixer EQ-872 0 0

TOTAL PLANT & EQUIPMENT IN GOOD CONDITION:

TOOLS
CATEGORY Qty. Unit No. CATEGORY
1

TOTAL:

ISSUES & CONCERNS


Description

WAITING FOR TREE CUTTING PERMIT

Prepared by:
Engr. Jose G. Cayao Jr. Signature:

Submitted by:
Signature:
TPM-PF-01
REF. No.

SHEET No.
1 of 1

Nos. Hrs.

7 44
Qty. Unit

0
EMPLOYER: PROJECT Name:

Network Development - Road Widening - Secondary Roads,


Buenavista - Kawayan Road, K0056 + 851 - K0059 +400

Contract Package No. : 20FJ0012 PID No:

ON SITE STAFF & LABOUR RECORD


Item TRADE Nos. Hrs. Item TRADE Nos.
INDIRECT MANPOWER: C LABORER 2

A. Mgt & Supervision 2 16 1 Romeo Cos 1

1 Jose G. Cayao Jr. 1 8 2 Joel Gimena 1

2 Jusan Santisima 1 8 3

3 4

B. WAREHOUSEMAN 1 8

1 Gerald Eras 1 8

C WATCHMAN 1 8

1 Joselino Columna 1 8

D DRIVERS/OPERATORS 7 44

1 Jerry Cortez 1 6

2 Arnel 1 6

3 Jesson Rodrigo 1 6

4 Roy Balendres 1 6 0

5 Fernando Lee 1 6

6 Dante Arupo 1 8

7 Solitaire Bermudo 1 6

9 Nestor Villaranda 0 0

10 Saldivar 0 0

11 Romeo Roce 0 0

TOTAL INDIRECT: 11 76
DIRECT MANPOWER:

A FOREMAN 1 8

1 Genie Merdegia 1 8

B MASON AND CARPENTER 4 32


1 Teriso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 1 8

4 Roger Serafin 1 8 TOTAL DIRECT: 7

VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Excavation for line canal.
2 2 Construction of headwall.
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11

Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :

econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE

139

DAY: _______
FRIDAY DATE: 28-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1

8 X X 2

8 TOTAL HRS: 7 1 3

TEMPERATURE: Low: __ °C High: __ °C 4

MATERIALS DELIVERED TO WORK SITE 7

No. MATERIAL Qty. Unit 8

1 9

2 10

3 11

4 12

5 13

6 14

0 8 TOTAL PLANT & EQUIPMENT

10
No.
1

56 TOTAL:

ESCRIPTION OF WORKS ACCOMPLISHED


WORKS Qty. Unit No.
1
2 WAITING FOR TREE CUTTING PE
3
4
5
6
7
8
9
10
11

Prepared by:

Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:

ENGR. JOEY JAVIER

ON SITE PLANT & EQUIPMENT RECORD


CATEGORY Nos. Hrs. No. CATEGORY
Backhoe Hyundai R140W-95 0967 EQ-245 1 6

Backhoe Lonking CDM6150 EQ-288 1 6

Dumptruck HOWO A7371 EQ-001 1 6

Dumptruck HOWO A7371 EQ-223 1 6

Sinutruck 6wheeler EQ-852 1 6

Vibratory Roller EQ- 875 1 8

Backhoe EQ- 903 1 6

Grader EQ-348

Truck Mixer EQ-051 0 0

Truck Mixer EQ-228 0 0

Truck Mixer EQ-872 0 0

TOTAL PLANT & EQUIPMENT IN GOOD CONDITION:

TOOLS
CATEGORY Qty. Unit No. CATEGORY
1

TOTAL:

ISSUES & CONCERNS


Description

WAITING FOR TREE CUTTING PERMIT

Prepared by:
Engr. Jose G. Cayao Jr. Signature:

Submitted by:
Signature:
TPM-PF-01
REF. No.

SHEET No.
1 of 1

Nos. Hrs.

7 44
Qty. Unit

0
EMPLOYER: PROJECT Name:

Network Development - Road Widening - Secondary Roads,


Buenavista - Kawayan Road, K0056 + 851 - K0059 +400

Contract Package No. : 20FJ0012 PID No:

ON SITE STAFF & LABOUR RECORD


Item TRADE Nos. Hrs. Item TRADE Nos.
INDIRECT MANPOWER: C LABORER 2

A. Mgt & Supervision 2 12 1 Romeo Cos 1

1 Jose G. Cayao Jr. 1 4 2 Joel Gimena 1

2 Jusan Santisima 1 8 3

3 4

B. WAREHOUSEMAN 1 8

1 Gerald Eras 1 8

C WATCHMAN 1 8

1 Joselino Columna 1 8

D DRIVERS/OPERATORS 6 30

1 Jerry Cortez 1 4

2 Arnel 1 6

3 Jesson Rodrigo 1 4

4 Roy Balendres 1 4 0

5 Fernando Lee 0 0

6 Dante Arupo 1 8

7 Solitaire Bermudo 1 4

9 Nestor Villaranda 0 0

10 Noel Badillo 0 0

11 Romeo Roce 0 0

TOTAL INDIRECT: 10 58
DIRECT MANPOWER:

A FOREMAN 1 8

1 Genie Merdegia 1 8

B MASON AND CARPENTER 4 32


1 Tereso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 1 8

4 Roger Serafin 1 8 TOTAL DIRECT: 7

VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Excavation for line canal.
2 2 Subgrade preparation.
3 3 Construction of head wall.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11

Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :

econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE

139

DAY: _______
SATURDAY DATE: 29-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1

8 X 2

8 TOTAL HRS: 8 3

TEMPERATURE: Low: __ °C High: __ °C 4

MATERIALS DELIVERED TO WORK SITE 7

No. MATERIAL Qty. Unit 8

1 9

2 10

3 11

4 12

5 13

6 14

0 8 TOTAL PLANT & EQUIPMENT

10
No.
1

56 TOTAL:

ESCRIPTION OF WORKS ACCOMPLISHED


WORKS Qty. Unit No.
1
2 WAITING FOR TREE CUTTING PE
3
4
5
6
7
8
9
10
11

Prepared by:

Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:

ENGR. JOEY JAVIER

ON SITE PLANT & EQUIPMENT RECORD


CATEGORY Nos. Hrs. No. CATEGORY
Backhoe Hyundai R140W-95 0967 EQ-245 1 4

Backhoe Lonking CDM6150 EQ-288 1 6

Dumptruck HOWO A7371 EQ-001 1 4

Dumptruck HOWO A7371 EQ-223 1 4

Sinutruck 6wheeler EQ-852 0 0

Vibratory Roller EQ- 875 1 8

Backhoe EQ- 903 1 4

Grader EQ-348 0 0

Truck Mixer EQ-051 0 0

Truck Mixer EQ-228 0 0

Truck Mixer EQ-872 0 0

TOTAL PLANT & EQUIPMENT IN GOOD CONDITION:

TOOLS
CATEGORY Qty. Unit No. CATEGORY
1

TOTAL:

ISSUES & CONCERNS


Description

WAITING FOR TREE CUTTING PERMIT

Prepared by:
Engr. Jose G. Cayao Jr. Signature:

Submitted by:
Signature:
TPM-PF-01
REF. No.

SHEET No.
1 of 1

Nos. Hrs.