SHEET No.
1 Jose G. Cayao Jr. 1 8 2 Joel Gimena 1 8 TOTAL HRS: 8 3 Dumptruck HOWO A7371 EQ-001 1 6
2 Jusan Santisima 1 8 3 TEMPERATURE: Low: __ °C High: __ °C 4 Dumptruck HOWO A7371 EQ-223 1 6
D DRIVERS/OPERATORS 5 30 4 12
1 Jerry Cortez 1 6 5 13
2 Mario Espares 1 6 6 14
3 Jesson Rodrigo 1 6 7
9 Nestor Villaranda 0 0
10 Saldivar 0 0
11 Romeo Roce 0 0
TOTAL INDIRECT: 9 62
No. CATEGORY Qty. Unit No. CATEGORY Qty. Unit
1 1
DIRECT MANPOWER: 2 2
A FOREMAN 6 48 3 3
1 Genie Merdegia 0 0 4 4
2 5 5
1 Teriso Sampaga 1 8
2 Renato Luba 1 8
3 Aquilino Ramirez 0 0
2 Jusan Santisima 1 8 3
3 4
B. WAREHOUSEMAN 1 8
1 Gerald Eras 1 8
C WATCHMAN 1 8
1 Joselino Columna 1 8
D DRIVERS/OPERATORS 4 24
1 Jerry Cortez 1 6
2 Mario Espares 0 0
3 Jesson Rodrigo 1 6
4 Roy Balendres 1 6
5 Fernando Lee 1 6
6 Dante Arupo 0 0
7 Solitaire Bermudo 0 0
9 Nestor Villaranda 0 0
10 Noel Badillo 0 0
11 Romeo Roce 0 0
TOTAL INDIRECT: 8 56
DIRECT MANPOWER:
A FOREMAN 1 8
1 Genie Merdegia 1 8
VISITORS DESCRIPTION OF
No. NAME CO. No. WO
1 1 Construction of headwall at station 57+694
2 2 Concreting of line canal.
3 3 Subgrade preparation.
4 4 Batching at PID 152
5 5
6 6
7 7
8 8
9 9
10 10
11 11
Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
ning - Secondary Roads,
56 + 851 - K0059 +400 DAILY SITE REPORT
PID No: 139
DAY: _______
TUESDAY DATE: 25-May-21
Nos. Hrs.
2 16 WEATHER: Sunny Cloudy Rainy Windy Stormy
1 8 X
1 8 TOTAL HRS: 8
TEMPERATURE: Low: __ °C High: __ °C
0 0 8
10
6 48
13
14
TOOLS
3 3
4 4
5 5
6 6
TOTAL:
Prepared by:
Engr. Jose G. Cayao Jr. Signature:
Submitted by:
Signature:
TPM-PF-01
CONTRACTOR: REF. No.
SHEET No.
1 of 1
NT RECORD
CATEGORY Nos. Hrs.
6 43
Signature:
Signature:
EMPLOYER: PROJECT Name:
2 Jusan Santisima 1 8 3
3 4
B. WAREHOUSEMAN 1 8
1 Gerald Eras 1 8
C WATCHMAN 1 8
1 Joselino Columna 1 8
D DRIVERS/OPERATORS 6 36
1 Jerry Cortez 1 6
2 Mario Espares 0 0
3 Jesson Rodrigo 1 6
4 Roy Balendres 1 6 0
5 Fernando Lee 1 6
6 Dante Arupo 1 6
7 Solitaire Bermudo 1 6
9 Nestor Villaranda 0 0
10 Noel Badillo 0 0
11 Romeo Roce 0 0
TOTAL INDIRECT: 10 68
DIRECT MANPOWER:
A FOREMAN 1 8
1 Genie Merdegia 1 8
VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Construction of headwall.
2 2 Excavation for line canal.
3 3 Subgrade preparation.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :
econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE
139
DAY: _______
WEDNESDAY DATE: 26-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1
8 X 2
8 TOTAL HRS: 8 3
2 10
3 11
4 12
5 13
6 14
10
No.
1
48 TOTAL:
Prepared by:
Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:
Grader EQ-348 0 0
TOOLS
CATEGORY Qty. Unit No. CATEGORY
1
TOTAL:
Prepared by:
Engr. Jose G. Cayao Jr. Signature:
Submitted by:
Signature:
TPM-PF-01
REF. No.
SHEET No.
1 of 1
Nos. Hrs.
6 36
Qty. Unit
0
EMPLOYER: PROJECT Name:
2 Jusan Santisima 1 8 3
3 4
B. WAREHOUSEMAN 1 8
1 Gerald Eras 1 8
C WATCHMAN 1 8
1 Joselino Columna 1 8
D DRIVERS/OPERATORS 7 44
1 Jerry Cortez 1 6
2 Arnel 1 6
3 Jesson Rodrigo 1 6
4 Roy Balendres 1 6 0
5 Fernando Lee 1 6
6 Dante Arupo 1 8
7 Solitaire Bermudo 1 6
9 Nestor Villaranda 0 0
10 Noel Badillo 0 0
11 Romeo Roce 0 0
TOTAL INDIRECT: 11 76
DIRECT MANPOWER:
A FOREMAN 1 8
1 Genie Merdegia 1 8
VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Construction of headwall.
2 2 Subgrade preparation.
3 3 Concreting of line canal.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :
econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE
139
DAY: _______
THURSDAY DATE: 27-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1
8 X 2
8 TOTAL HRS: 8 3
1 9
2 10
3 11
4 12
5 13
6 14
10
11
12
13
14
15
No.
1
56 TOTAL:
Prepared by:
Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:
Grader EQ-348
TOOLS
CATEGORY Qty. Unit No. CATEGORY
1
TOTAL:
Prepared by:
Engr. Jose G. Cayao Jr. Signature:
Submitted by:
Signature:
TPM-PF-01
REF. No.
SHEET No.
1 of 1
Nos. Hrs.
7 44
Qty. Unit
0
EMPLOYER: PROJECT Name:
2 Jusan Santisima 1 8 3
3 4
B. WAREHOUSEMAN 1 8
1 Gerald Eras 1 8
C WATCHMAN 1 8
1 Joselino Columna 1 8
D DRIVERS/OPERATORS 7 44
1 Jerry Cortez 1 6
2 Arnel 1 6
3 Jesson Rodrigo 1 6
4 Roy Balendres 1 6 0
5 Fernando Lee 1 6
6 Dante Arupo 1 8
7 Solitaire Bermudo 1 6
9 Nestor Villaranda 0 0
10 Saldivar 0 0
11 Romeo Roce 0 0
TOTAL INDIRECT: 11 76
DIRECT MANPOWER:
A FOREMAN 1 8
1 Genie Merdegia 1 8
VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Excavation for line canal.
2 2 Construction of headwall.
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :
econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE
139
DAY: _______
FRIDAY DATE: 28-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1
8 X X 2
8 TOTAL HRS: 7 1 3
1 9
2 10
3 11
4 12
5 13
6 14
10
No.
1
56 TOTAL:
Prepared by:
Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:
Grader EQ-348
TOOLS
CATEGORY Qty. Unit No. CATEGORY
1
TOTAL:
Prepared by:
Engr. Jose G. Cayao Jr. Signature:
Submitted by:
Signature:
TPM-PF-01
REF. No.
SHEET No.
1 of 1
Nos. Hrs.
7 44
Qty. Unit
0
EMPLOYER: PROJECT Name:
2 Jusan Santisima 1 8 3
3 4
B. WAREHOUSEMAN 1 8
1 Gerald Eras 1 8
C WATCHMAN 1 8
1 Joselino Columna 1 8
D DRIVERS/OPERATORS 6 30
1 Jerry Cortez 1 4
2 Arnel 1 6
3 Jesson Rodrigo 1 4
4 Roy Balendres 1 4 0
5 Fernando Lee 0 0
6 Dante Arupo 1 8
7 Solitaire Bermudo 1 4
9 Nestor Villaranda 0 0
10 Noel Badillo 0 0
11 Romeo Roce 0 0
TOTAL INDIRECT: 10 58
DIRECT MANPOWER:
A FOREMAN 1 8
1 Genie Merdegia 1 8
VISITORS DESCRIPTION OF W
No. NAME CO. No. WORK
1 1 Excavation for line canal.
2 2 Subgrade preparation.
3 3 Construction of head wall.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
Distribution: REMARKS:
Original to contractor
Client
Project Manager
Consultant
Other
PROJECT MANAGER :
econdary Roads,
1 - K0059 +400 DAILY SITE REPORT ENGR. JOE
139
DAY: _______
SATURDAY DATE: 29-May-21
Hrs. No.
16 WEATHER: Sunny Cloudy Rainy Windy Stormy 1
8 X 2
8 TOTAL HRS: 8 3
1 9
2 10
3 11
4 12
5 13
6 14
10
No.
1
56 TOTAL:
Prepared by:
Submitted by:
PROJECT MANAGER : CONSULTANT: CONTRACTOR:
Grader EQ-348 0 0
TOOLS
CATEGORY Qty. Unit No. CATEGORY
1
TOTAL:
Prepared by:
Engr. Jose G. Cayao Jr. Signature:
Submitted by:
Signature:
TPM-PF-01
REF. No.
SHEET No.
1 of 1
Nos. Hrs.
6 30
Qty. Unit