CONSTRUCTION - EVENT REPORT (NEAR MISS) - 10

Date: 03.03.2022 Time: 15 45 Hrs


Contractor: Afcons Civil Works Area Afcons Camp
Person
Mr. Hayatul Mondal Occupation who observed: Site Supervisor
Reporting
Incident Details
At risk Unsafe Safe Safe Risk Evaluation
behavior Condition Behavior Condition V-Low Low Medium High Extreme
 
Description

On 03.03.2022 at about 15 20 hrs, crew of four personnel’s naming respectively Mr. Abhraham Kollie (Steel Bender), Mr
Archie Perry (Steel Bender), Mr. Enoch Freeman (Steel Bender) and Mr. Benedict (Steel Bender) have started manual
unloading of “loose bundled U shape steel bars (8mm thickness with 12meters in length)” from the trailer to the
designated location on instruction from site supervisor Mr. Hayatul Mondal due to unavailability of crane (which
supposed to be get used for mechanical unloading).

While unloading the steel from the trailer at about 15 45 Hrs; due to misjudgment among the crew, one of the steel bars
got slipped on ground from one steel bender’s hand and due to sudden jerk (due to vibratory motion) to the steel bar,
one end of the steel got swing back and moved just near to the face of Mr, Benedict.

Same near miss has been witnessed & reported by site supervisor. No injury/property damage reported.

Root Cause:
 Mechanical lifting/unloading has not been opted by the site supervisor.
 Lack of communication between the crew while doing manual unloading of the material.

Note: This near miss has a potential of high potential body injury.
Coaching Performed
Corrective Coaching  Development Coaching  Safe Behavior Re-enforcement 
1. Refresher training has been conducted for the involved crew. Closed Out
Responsible Person Target Date
2. Benefit of mechanical loading-unloading method has been Yes No

explained. Mr. R.P. Singh


3. Precautions to be taken while doing manual handling of the
material has been discussed with the team. 04/03/2022 
Mr. Jaishankar R
4. Same near miss has been discussed during TBT & lesson
earned has been shared.
Observers: Mr. Hayatul Mondal Designation: Site Supervisor

Debriefed and Action Plan Completed: Signature: Date: 04/03/2022

Please Mark with X Applicable Activator, Barrier and General Agency


Failed Defense Factors Activator Barrier General Agency
Rescue System Procedure Absent minded x Job rushing Barricading
Emergency Systems or Procedures Improper motivation Procedures not followed x Building/Structure
Training Procedure Inadequate communication x Sub-standard housekeeping Burning and Scalding
Barricades Lack of commitment Taking chances x Compressed Air
Blasting Procedure Lack of knowledge Communication x Electrical equipment
Safe Work Procedures x Lack of skill Accessibility Fire Protection
Ventilation Lack of training Self-discipline Hand Tools
Strata Control Judgment x Fear Housekeeping
Road Surfaces Production pressure Lack training Inspections
High Walls and Berms Time saving Risk perception x Ladder/Stairs
PPE Inattentiveness Work pressure Lifting Equipment
Hazard Identification x Abuse or misuse Tools not available Lifting Machinery
Uncontrolled Water Taking chances x Equipment not available x Machinery
Support Systems Habit Inadequate Space Manual Handling x
Protection Systems or Procedures Risk perception x Rough terrain Material/Goods
Warning Systems or Procedures Accessibility Slippery Road Motor Vehicles
Recovery Systems or Procedures Supervision x Sub-Standard equipment Overhead work
Escape System or Procedures Instructions ignored Poor Hygiene facilities Power Tools
Guards or Barriers Planning Spillages PPE
Detection Systems or Procedures Limited space Safe access and egress
Waste Management Convenience Safe work area
Attitude to safety Working at Heights
Ill Health Scaffolding
Inadequate machinery Stacking and storage
Environmental Conditions Mobile Machinery
Work environment Transport
Inadequate Tools Safe Work Procedures x
Unprotected Height Haulage
Violation by supervisor Wild Animals
Acts of Nature Uneven Surfaces
Spillages Dust
Gas Cylinders
Hygiene Facilities
Reinforcing

Loose bundled U shape steel rebar

Refresher training for involved crew has been conducted