A Preliminary Study on Text Mining-Based Human Resource Allocation in a Construction


Project

Thausif Ul Alam (Roll : 1623033 )


Building Engineering & Construction Management
Major: Construction Management

INTRODUCTION ‘matching’, and ‘showing result’.


This study is conducted to ascertain the
eligibility and efficiency of applying the text- RESULTS AND DISCUSSION
mining method to long descriptive résumés to Six résumés of different candidates who were
resolve the problems occurred during the willing to be assigned a construction manager
allocation of human resources (HR) in construction manager (CMr) position were
construction organizations. Most HR collected. Match is determined based on no. of
management (HRM) systems only allow HR distance and its weight. Two important indices
managers to search for appropriate engineers or were extracted for assessment, one was the
managers for a new project based on previous number of matched strings and the other was
team names or the names of project that the the distance between each string. The distance
engineers/managers worked on, job titles, indicated the accuracy of two matched
durations of each project, etc whereas how keywords; for instance, ‘0’ was perfectly
candidates perform on a new project greatly coincidental and ‘1’ showed a small, but
differs depending on the specific tasks that each ignorable difference
candidate performed for previous projects and Score = W0 ⅹ n(D0) + W1 ⅹ n(D1),
the experience and skills that they gained where
through these tasks. This study has developed D0(Distance 0) has weight W0 = 1,
an improved HR solution for finding the best D1(Distance 1) has weight W1 = 0.9, n(D0):
person for a job and for maintaining the records number of DO, and n(D1): number of D1.
of project staff by collecting and analyzing long Table 1: Text mining result.
sentence-based job descriptions related to the
construction industry using a text-mining Candidate Main
Match Result Score
method sample Experience
A QM 3D0xW0+0D1XW1=3.0
B RM 2D0xW0+2D1xW1=3.8
OBJECTIVES
C QM & CM 2D0xW0+3D1xW1=4.7
The objectives of this study are as follows: D CM 3D0xW0+2D1xW1=4.8
 The main objective is to use text mining to E CM 4D0xW0+1D1xW1=4.9
use text mining to efficiently and effectively F CM 6D0xW0+2D1xW1=7.8
analyze CV of candidates for allocating In terms of the validation rule we pick F who
positions. was also picked by HR manually taking much
 Using long descriptive CV for more more time.So,we can conclude that textmining
accuracy. is a very helpful tool for HRM in construction
 Minimization of time consumption. projects in a shorter time.

RESEARCH METHODOLOGY REFERENCES


The text-mining tool employed for this study [1]A. Ekholm, S. Fridqvist, A conceptual
was KNIME. 9 functional nodes were used. framework for classification of construction
Basic requirements for the position are to be works, Electronic Journal of Information
set. Data divided into two categories i.e. In- Technology in Construction, 1 (1996) 1-25.
house & External. The natural languages [5]S. Strohmeier, F. Piazza, Domain driven
consists of long descriptive sentences of CV are data mining in HRM: A review of current
modified and refined by the flow, such as research, Expert Systems with Applications,
‘input’ , ‘phrasing’ , ‘filtering’ , ‘collecting’ , 40 (2013) 2410-2420.