NOTES
1. ALL DIMENSIONS ARE IN mm & LEVELS ARE IN m.
2.DIMENSION MENTIONED IN THE DRAWINGS SHALL ONLY BE USED.(ONLY
WRITTEN DIMENSIONS SHALL BE FOLLOWED). DO NOT SCALE DRAWINGS.
3.CLEARANCE FOR THE BOLT HOLES SHALL CONFIRM TO IS800-2007
BOLT HOLE SIZE SHALL BE 2mm LARGER THAN THE BOLT DIAMETER UPTO
24mm AND 3mm LARGER THAN THE BOLT DIAMETER FOR GREATER
THAN 24mm.
A 4.ALL PRIMARY BOLTS SHALL BE OF GRADE 8.8 ELECTRO GALVANIZ.ED A
5.ALL SECONDARY BOLTS SHALL BE OF GRADE 4.6 ELECTRO GALVANIZED.
6.FOR WELD DETAILS REFER DRAWING O20350-C-FB-01-GA-0124
7.PAINTING SPECIFICATION: SHALL BE FOLLOWED AS PER
DOCUMENT NO.O20350-C-FB-00-DB-0001
LEGEND
TYP. - TYPICAL
WTS - WIRE TO SHIP
DET. - DETAIL

MINIMUM WELD SIZE UNO IN THIS DWG.


THICKNESS OF THICKER MINIMUM SIZES
PLATE (SINGLE PASS)
B B
UP TO 6 MM 3 MM
6 TO 12 MM 5 MM
12 TO 20 MM 6 MM
ABOVE 20 MM 8 MM

REFERENCE DRAWINGS
25 80 25

C C

30
55
wh_03-bp-39 2 - Ø 14 HOLES
FOR M 12 BOLTS 2 O20350-C-FB-02-GA-0101 TO 0108 R1
1 O20350-C-FB-02-GA-0109 TO 0123 R0
SL NO DRAWING NUMBER REV NO INT / EXT

BPL245*55*8 x 130
REVISIONS
25 80 25
D D
4 - Ø 14 HOLES

25
FOR M 12 BOLTS

0 ISSUED FOR FABRICATION 21.12.2021


wh_03-bp-39 REV NO DESCRIPTION DATE

CLIENT
100
LARSEN AND TOUBRO,LIMITED, CONSTRUCTION,
BUILDINGS AND FACTORIES
245

CONCEPT ARCHITECT
C.R. NARAYANA RAO
E (CONSULTANTS) PRIVATE LIMITED E
CONSULTANTS
120

STEEL INFRA SOLUTIONS PRIVATE LIMITED

PROJECT
DESIGN & BUILD MUMBAI FREE TRADE WAREHOUSING
ZONE AT JNPT, MUMBAI

F F
DRAWING TITLE

DETAIL OF ASSEMBLY - WH_03-PC-102

G. A ASSEMBLY SUB ASSLY ELEMENTS

ISSUED FOR FABRICATION

DRAWN BY: BAS DATE: 21-12-21

G CHECKED BY: SSA DATE: 21-12-21 G


APPROVED BY: DRJ DATE: 21-12-21

DESIGNED BY: VG/SKR SCALE: 1:2.5

FILE NAME: S-21- WH_03-PC-102


DRAWING NUMBER: REV
S-21-WH_03-PC-102
0
These drawings are under copyright and are the property of Steel Infra Solutions Pvt.Ltd
None of the drawings and related documents can be reproduced, copied in whole or in
part whithout prior expressed written consent of Steel Infra Solutions Pvt. Ltd.
These drawings cannot be handed over to a third party or used for any purpose, other
than that for which it has been loaned.

H STEEL INFRA SOLUTIONS PVT. LTD.


6TH FLOOR,
‘ CITY CENTRE ’ 79/2,
H
HENNUR BELLARY OUTER RING ROAD,
MATERIAL LIST FOR ASSEMBLY MK'D WH_03-PC-102 8 No. Required HEBBAL, BANGALORE 560024.
Weight WWW.SISCOL.IN
8 - PURLIN CLEATS - REQ'D. AS DRAWN MK'D.WH_03-PC-102 Mark Profile Material Qty Length Area (Kg)
wh_03-bp-39 BPL245*55*8 E350BR 1 129 0.08 2.38 806, KAILASH BUILDING,

ORIGINAL SIZE Total Per Assembly 0.08 2.38 26 K.G. MARG,


Tekla Structures

NEW DELHI- 110001


A1 Total all Assembly 0.66 19.07 PHONE : +011 140234814/17

1 2 3 4 5 6 7 10 11 12 13 14 15 16