Operation modes
• Operation modes
• Start in mains parallel operation
• Start in island operation
• Load sharing
• Start in island operation (Blackstart)
• Changeover mains parallel into island operation
• Start medium voltage power plant / grounding genset in island operation
Operation modes
Operation modes
• Island operation
• The auxiliaries have to be power supplied before starting the genset (except Blackstart)
• One genset is running and power supply customer loads at site
• The CG load steps has to be followed
• Transformers has to be charged during genset start
• If the genset stops no more power supply at site (except of emergency gensets)
Alternator breaker
Open / Close HAS NH__ Fuse
Auxiliary panel supply
___A / 5A CT
for alternator protection HAS Auxiliary cabinet
___kVA
G1 MWM Genset
___kVA; ___kV; ___A FUS Radiator cabinet
power supply via HAS
Alternator star point
earthed
Page 5 | CATERPILLARCONFIDENTIAL: YELLOW | Training Center Sales, 2014
One powerful future.
Operation modes
Operation modes
Operation modes
Blackstart
• Other components which have to run before genset start has to be power supplied
external (for e.g. emergency diesel)
• Only 24VDC power necessary to power supply the TEM system and the multifunction
relay as well as the alternator breaker
• Pumps and other auxiliaries will start immediately after the genset is running
Operation modes
Utilitybank
Load import / export control
The
If thepower
utility over the utility
fails and the grid breaker will
measured and to ~ 0 kW
breaker will opened, the overload regulated
will be taken from the load bank.
Customer load
Switching on load according CG load
steps (The engaging power of the
load is relevant)
Start load via VFD (Variable
Frequency Drive)
Start load via softstarter
Multiple gensets
Operation modes
Operation modes Start the emergency diesel Power supply the low voltage distribution
Start one genset and synchronize to the dead bus bar
Start Energize the unloaded transformer
medium voltage Switchover from emergency diesel to genset Stop the emergency diesel
Start customer load and after next genset / Start genset and after customer load
power plant
Load sharing between the running gensets
If utility available synchronize to the utility
Summary