Cable Termination Inspection Report: General Visual Checking
Cable Termination Inspection Report: General Visual Checking
Cable Termination Inspection Report: General Visual Checking
COASTAL GUJARAT
PROJECT : COASTAL GUJARAT POWER LIMITED - 4000 MW POWER LIMITED
STERLING & WILSON (800 MW X 5) THERMAL POWER PROJECT, MUNDRA, KUTCH
PVT. LIMITED DOCUMENT NO: SW-CGPL-HVAC-QCP-23
REPORT NO. : S & W ORDER No.: DATE:
PAGE: 1 OF 1
System No.
System Description
Subsystem No.
DRAWING NO. Area / Location
Equipment Tag No.
General Visual Checking
Results
Item No. Description
Accepted N/A Rejected
1 Cable are ready for termination
2 Cable glands are as per hazardous area classifications.
3 Cable stripping method is correct.
4 Cable glands are assembled correctly
5 Glands are tightened as specified.
6 Cable routing inside the panel is correct.
8 Crimped lugs are installed correctly and of correct size and type.
Remarks :
Signature
Name
Date