Professional Documents
Culture Documents
Introduction Fischer A - C - T: The Key To Modern Facade Aesthetics
Introduction Fischer A - C - T: The Key To Modern Facade Aesthetics
◼ Anchoring Principle
Contents
◼ Types of Anchors
◼ Product Comparison
◼ Framework substructure
◼ Process Flow
◼ Projects Reference
> 2
A│C│T
> 3
A│C│T
◼ Approx. 1.500.000m² of façades are built with FZP anchors per year
> 4
A│C│T
FZP II-T PA
Stress-free fixing:
Undercut hole in panel material
external forces
cause
internal reaction forces
> 6
A│C│T
❖ FZP-II 13 x 15 M8 / SO / 15 A4
FZP 2nd
Generation
Drill Hole Diameter
Anchorage Depth
Bolt Size
Stand Off
> 7
A│C│T
Approvals
Ceramic, HPL
> 8
A│C│T
FZP II
> 9
A│C│T
FZP-II
Nature Stone
Anchor Size M6 / M8
> 10
A│C│T
FZP-II
Ceramic
Panel
FZP-II 11x6 M6/T/9 FZP-II 11x8 M6/T/10 FZP-II 11x9 M6/T/9
Designation
D40 PA D40 PA D40 PA
Installation depth
6 8 9
[mm]
Colour of yellow
red blue
shim washer
> 11
A│C│T
◼ Engineering Esthetics;
> 12
A│C│T
> 13
A│C│T
Rearview Rearview
> 14
A│C│T
Metamorphic rock
> 15
A│C│T
Which leads to
> 16
A│C│T
SBN 502
für natural stone, artificial steone, ceramic, etc.
> 18
A│C│T
The Machine
drilling baseline
is always
referred from the
top of the panel
surface
const.
> 19 Zeitverzögerer
A│C│T
Zeitverzögerer
> 20
A│C│T
Subframe
> 21
A│C│T
Overview
> 22
A│C│T
Overview
Rivet
Vertical Profile
Horizontal Profile
Adjustable Clasp
> 23
A│C│T
> 24
A│C│T
Installation Procedures
➢ Mark out the wall holder location based on drawing prior installation;
> 25
A│C│T
Installation Procedures
same
surface
> 26
A│C│T
Installation Procedures
Helping
Hand
> 27
A│C│T
Installation Procedures
> 28
A│C│T
Installation Procedures
> 29
A│C│T
Installation Procedures
◼ Panel Cladding
> 30
A│C│T
Installation Procedures
◼ Panel Cladding
M6 screw
> 31
A│C│T
Installation Procedures
> 32
A│C│T
Section View
40% Remaining
Thickness
> 33
A│C│T
Section View
FZP + Stone
Wall-holder HP + Clasp
Possible Distances Vertical profile FZP II 13x26…
(Fix point/Sliding point) ATK 103-P20
(30mm – 33 mm panel)
113mm – 143mm L 40x150 T 40/52-2 23 38
> 34
A│C│T
Subframe FZP II
Machinery
Systems Anchors
Material Installation
Engineering Training
Testing
> 35
A│C│T
Process Flow
Design
Testing
Pre-
calculation Site
Demo
> 36
A│C│T
Design
◼ Design is full
responsible by
the Designer;
◼ Designer should
give us all the
relevant
information
> 37
A│C│T
Pre-calculation
◼ Based on the given parameters
from consultant, which are:
– Density;
– Panel Size;
– Flexural Strength;
– Thickness;
– Wind load;
◼ Pre-calculation is based on
engineering assumption, need
actual test to justify
> 38
A│C│T
> 39
A│C│T
Tension Test
Types of Failure
• Cone Failure;
• Panel Splitting Failure;
• Steel Failure
> 40
A│C│T
Shear Test
Types of Failure
> 41
A│C│T
Bending Test
> 42
A│C│T
> 43
A│C│T Full Esthetics: FZP Panel Anchors
Testing
> 44
A│C│T Full Esthetics: FZP Panel Anchors
Site Demo
◼ Fischer provide Site Training to all the installers, as well as
the project supervision teams
> 45
A│C│T
> 46
A│C│T
> 47
A│C│T
> 48
A│C│T Full Esthetics: FZP Panel Anchors
> 49
A│C│T
> 50
A│C│T
> 54
A│C│T
Überschrift
◼ Text/Aufzählung:
Überschrift
◼ Text/Aufzählung:
> 60
A│C│T
Überschrift
◼ Text/Aufzählung:
> 61
A│C│T
> 62
A│C│T
Library
Guangzhou / China
Companies
◼ Investor: Guangzhou Municipal Bureau of Culture
Design Institute(CN)
Object data
◼ Façade type: rainscreen cladding or unitized façade
◼ Area: 25000m²
> 63
A│C│T
Überschrift
◼ Text/Aufzählung:
Importeur)
York
Object data
◼ Governor´s Island, Brooklyn, New York
> 65
A│C│T
University of Chicago
Chicago, USA
> 66
A│C│T
> 67
A│C│T
> 68
A│C│T
> 69
A│C│T
> 70
A│C│T
> 71
Quick-Info:
A│C│T
→cast glass facade
Summary
◼ Why fischer?
> 73
Introduc�on fischer A|C|T
…the key to modern facade aesthe�cs