Posorja Multipurpose Terminal Terminal Works: Contractor Engineer
Posorja Multipurpose Terminal Terminal Works: Contractor Engineer
Posorja Multipurpose Terminal Terminal Works: Contractor Engineer
TERMINAL WORKS
CONTRACTOR ENGINEER
Doc No.
PMPT-ITP-006-04
REVISIONS RECORD
Rev. No. Date Issued by Approved by Description
Date: 27/04/2018
INSPECTION & TEST PLAN
Page: 2 of 6
DYNAMIC COMPACTION CONSTRUCTION
Gravels (such as
5.3 GC\GM\GP\GW etc.)
UNIFIED SOIL ES-132.003-301-06-003 rev 5 100,000 m3
with fine (particle size Site Engineer/ QA/QC Test report/
CLASSIFICATION SYSTEM ASTM D2487 H H
less than 0.075 m m) Lab asistant Engineer PMPT-MAS
(USCS)
content <15%
Less than 1.2 times of
its plastic limit or
Water content should
5.4 ES-132.003-301-06-003 rev 5
be -2%<x<+4%,
ASTM D2216 100,000 m3 Site Engineer/ QA/QC Test report/
WATER CONTENT Assume x is its H H
Lab asistant Engineer PMPT-MAS
optimum moisture
content
ES-132.003-301-06-003 rev 5
5.6 COMPACTION TEST 93 % of compaction 2,000 m2 Site Engineer/ QA/QC Test report/
ASTM D1557 H H
Lab asistant Engineer PMPT-MAS
According to the
ES-132.003-301-06-003 rev 5 Gardner Standard Before start Site Engineer/ QA/QC Test report/
6. Clearing Top Layer H H
ASTM C40 color chart 5, 8, 11, works Lab asistant Engineer PMPT-MAS
14, 16
7 Backfilling and site leveling According to approved Before start Site & survey QA/QC H H Record inpection
ES-132.003-301-06-003 rev 5 drawing tolerance +- works Engineer Engineer & survey ITP-
5cms CL06-2
9 Trial area for dynamic D-132.003-301-06-005 rev 0 The average of last Record inpection
Compaction 8000Kn two sink down is less Each area Site Engineer QA/QC H H & survey ITP-
than 200 mm (8000Kn) Engineer CL06-1
ES-132.003-301-06-003 rev 5
14 Rolling and compacting 93 % of compaction 2000 m2 Site Engineer/ QA/QC Test report/
ASTM D1557 H H
Lab asistant Engineer PMPT-MAS
TEST
SOURCE OF SAMPLE
SPECIFIC
FILLING NAME
ATION
WET MOISTURE
DRY DENSITY ODD(kg/m3)
MEASURE DENSITY CONTENT Degree of
MEASURE
LOCATION 3 Compaction (%)
(kg/m )
(kg/m3) (%)
POINT
ate: Date: