Professional Documents
Culture Documents
Client Design and Build Contractor: Liquid Limit (Cone Penotrometer) and Plastic Limit
Client Design and Build Contractor: Liquid Limit (Cone Penotrometer) and Plastic Limit
PROJECT: #REF!
ATTERBERG LIMITS
Liquid limit (cone penotrometer) and plastic limit
Test Reference No.: Lab. Reference No.: Technician: Lab Team
Location #REF! Sample Date #REF!
Test method BS 1377: Part 2, 1990:4.3/4.4 Test Date 24/May/2018
Soil description #REF!
0 37 0 20
Plasticity Index (%) 12.0
37 37 20 20
Linear shrinkage
Trough No. K
L.shringage = 1
% L.shrinkage = 6.4
Remarks:
PROJECT MANAGER'S
CONTRACTOR REPRESENTATIVE
_____________________ _________________
Lab Technician Lab Technician
________________________ __________________
Materials Engineer. Materials Engineer.
Project Manager's Representative CLIENT Design and Build Contractor
ATTERBERG LIMITS
Liquid limit (cone penotrometer) and plastic limit
Test Reference No.: Lab. Reference No.: Technician: Lab Team
Location #REF! Sample Date #REF!
Test method BS 1377: Part 2, 1990:4.3/4.4 Test Date 24/May/2018
Soil description Neat Material
0 37 0 20
Plasticity Index (%) 11.9
37 37 20 20
Linear shrinkage
Trough No. K
L.shringage = 1
% L.shrinkage = 5.7
Remarks:
PROJECT MANAGER'S
CONTRACTOR REPRESENTATIVE
_____________________ _________________
Lab Technician Lab Technician
________________________ __________________
Materials Engineer. Materials Engineer.