TABLE OF CONTENTS
1. Visual inspections.
2. Contact resistance measurements.
3. Insulation Resistance Test of primary parts at 5kv DC.
4. Insulation resistance test of all low voltage wiring and cabling at 500 V.
5. High- Pot Test.
6. Functional check of trip free and anti pump circuits.
7. Functional checks of breaker operation counter.
8. Check correct operation of all auxiliary contacts (for breaker open/closed positions).
9. Timing test using an electronic oscillograph.
10. Check the correct functioning of interlocks and limits switches.
1. Visual Inspections.
• Check nameplate information for correctness.
• Check tightness of all bolted connections (torque wrench method).
• Check all wiring is correct according to approved drawings terminal connections are secured.
• Check quality of paintwork.
• Check that all grounding cables are securely connected.
• Check breakers, truck, rails, for proper alignment and smooth movement.
• Check operation of all mechanical interlocks with associated disconnects, grounding switches,
racking truck mechanism, cubicle doors, etc.
• Check for correct breaker position indication (breaker open/closed).
• Check manual spring charge operation.
• Verify correct spring status indication (spring charge d/discharged).
• Verify that correct Dispatch Numbers have been installed.
MICRO OHM
METER R Y B
4. Insulation Resistance Test Of All Low Voltage Wiring And Cabling at 500 V DC.
• Connect all low voltage wires together and apply the test voltage between the wires and ground.
• Record the corresponding resistance readings.
5. High-Pot Test
♦ AC high- pot test shall be carried out in accordance with IEC standard at site.
♦ The test will carry out at test voltage 38 KV fore 60 second.
Page No. 2 of 4 Prepared by: RamadanCLASSIFICATION:
Mohamed NaguibCONFIDENTIAL MVTC-CB-ITP
MV SYSTEMS
♦ If the test have been done at factory at 38 kV it will be done at site at 80% of the last time.
At the CB Closed
Connect the phases Y, B to ground and apply the test voltage between phase R and ground.
Connect the phases B, R to ground and apply the test voltage between phase Y and ground.
Connect the phases R, Y to ground and apply the test voltage between phase B and ground.
Record the corresponding leakage current readings.
CB MAIN CONTACTS
HIGH POT
TESTER R Y B
At the CB Open
♦ Connect the phases R, Y, B Cable side to the ground.
♦ Connect the phases R, Y, B Bus side to the test set.
♦ Record the corresponding leakage current readings.
CB MAIN CONTACTS
HIGH POT
TESTER R Y B
8. Check Correct Operation Of All Auxiliary Contacts (For Breaker Open/Closed Positions).
CB MAIN CONTACTS
CH. 1
R Y B
CH. 2
CH. 3
CLOSING
CB CLOSING TERMINALS
ORDER
TRIPPING
CB TRIPPING TERMINALS
ORDER
DC SUPPLY +