Chapter II

Review of Related Literature and Studies

This chapter presents the relevant literature and study that researcher

considered in strengthening the importance and advantage of presents study. The

proponent present the literature reviews based on article, or any kind of resources

that can give guides on addition of knowledge and information and fully

understand the research for better comprehension study.

Scheduling systems are used by organizations to allocate and manage their

various resources adequately. These types of software are used to manage both

internal and external activity planning such as book events, schedule employees,

reserve rooms, coordinate the daily activities, and calendar.

https://www.rsgmedia.com/term/p/program-scheduling-system/

The Faculty Load System provides the ability to analyze and report faculty

loads against contract requirements. Faculty loads are defined in terms of Equated

Load Units (ELUs) which are the "units" faculty earn for teaching courses and for

performing non-instructional activities such as department chair and research.

https://inside.sou.edu/it/banner/fac-load-system.html
FOREIGN STUDY

According to Dr. Dibon (2010)

The study on a report on the Impact of Workload on Teachers and Student’s stated that

Teacher’s expressed concern that higher level of frustration and stress due to a lack of

assigned time to prepare classes can negatively impact on their interactions with

students. The lack of preparation time can also result in classes that are not

planned/prepared as well as they could be.

Further, when a teacher doesn’t have time to properly assess student work, in a timely

fashion, and has little time to provide tutorial classes, remedial work for students who

need extra help is often compromised. Having adequate preparation time is a critical

factor to a teacher satisfaction. In this Study, the proponents aim to develop an “E

Faculty Loading” that will help organize the teachers work load. When teachers

are satisfied with the amount of time they had for preparation they were much more

positive about their work and profession in general.


https://www.academia.edu/9162628/Chapter_2_Review_of_Related_Literature_and_Studies

Foreign literature

According to John Hop kin’s University (2011-2012) Homewood (John Hop

kin’s University S.Y. 2011]-2012) prioritize the schedule system resource to be used as

fully efficient as possible. The schedule system provides equitable access to a variety of
rooms, time management and faculty information, as well as to provide the students to

search more information on their own.

https://www.rsgmedia.com/term/p/program-scheduling-system/

Based on C. F. Niederriter (April 1997, physics. edu) says for the past several

years, the Dean's office and the Faculty Senate have struggled with defining teaching

loads at Gustavus for the purposes of determining overload situations and staffing

allocations. Several ad hoc committees have looked into the matter, without resolution.

At least since the 1992-1993 school years, the Registrar has tabulated “Faculty Load”

data by department, including number of sections (or contact hours) taught full time load

(as determined by the department), enrollment, and enrollment per faculty.

Chapter 2 | PDF | System | Academic Term (scribd.com)

Local study

According to Aquino (2011

Importance of computer application is increasing day by day. In the latest decades of

the millennium winning organization are those which are willing to integrate business

strategy and computer information technology in plying their respective trades. The use

of computer information technology results for them to be able to develop products fast

and make decisions fast, ability to have fluid organizations structures, able to cope with

the demanding work force and external environment by the rapid development of
innovative approaches and lastly using information system confirms the company’s

mission vision. The school use the information systems in the way of implementing a

scheduling system. This results for them to search more accurately and easy.

http://www.slideshare.net/EzhrihmCradan/chapter-2-28073663

 Based on Bohol island State University(2012-2013) In related to current system study

.Study tested the functionality of Automated class scheduling system in terms of speed,

data handling , security , Scheduling , stability and adaptability in making class

schedules. This study was conducted in Bohol Island state University Main Campus,

Tagbilaran City during the second semester of school year 2012

 2013. The respondents of this study were the 6 expert instructors in the field of

computer programming. They tested and evaluated the functionality of the program in

terms of its design, and accuracy, data handling security, stability and adaptability of the

software. Separate set of questioners were given to two groups of respondents. The

study concluded that the manual and the automated system is more functional because

of its extra features which solve primary problems in creating class schedules

https://www.academia.edu/9162628/Chapter_2_Review_of_Related_Literature_and_Studies