TEST REPORT

Feeder No : P-A3101B-P1B-MO Substation : SS-02


Make : PB CT Ratio : 30/1 A FLC : 20 A
Model No : Micromotor Serial No : 76447

METERING CHECKS:

INJECTED CURRENT (A) MEASURED CURRENT (A)


R Y B R Y B
1A 1A 1A 30.4 30.2 29.4

THERMAL OVERLOAD PROTECTION:

Settings: Itherm>: T6 X FLC, Time- 6 Sec.

Phase Injected Trip Timing


Current(A) (Sec)
Itherm>: 4.1 6.056

UN BALANCE PROTECTION:

Settings: I2>: 0.150 A, Time= 10 Sec

Phase Set Pick Up Trip Timing


Current(A) (A) (Sec)
I2> 0.150 0.159 10.055

EARTH FAULT PROTECTION:

Settings: I= 0.05 x In, T=3 Sec

E/F Set Pick Up(A) Tripping Time (Sec)


Current(A)
Ief 0.05 0.057 3.051

CONTRACTOR ENGINEER OWNER

Signature: ________________ Signature: ________________

Name : SIVANANDHAM M Name :


SHORT CIRCUIT PROTECTION:

Settings: I: 10x FLC

Phase Set Injected Trip Timing


Current(A) Current (A) (Sec)
3 Phase 6.6 6.7 0.054

OVER CURRENT PROTECTION:

Settings: I: 1.5 x FLC Time- 3 Sec

Phase Set Pick Up Trip Timing


Current(A) (A) (Sec)
3 Phase 1.0 1.2 3.065

OPERATIONAL CHECKS:

i) Protection Healthy Indication - OK


ii) Trip indication - OK
iii) Alarm LED indication - OK

REMARKS:
RELAY FOUND HEALTHY ON ALL ASPECTS.

Test Kit Involved:

Make: Omicron CMC 356

S.No: JH572S

CONTRACTOR ENGINEER OWNER

Signature: ________________ Signature: ________________

Name : SIVANANDHAM M Name :