Perancangan Perkerasan Jalan: Metoda Aashto 93
Perancangan Perkerasan Jalan: Metoda Aashto 93
PERKERASAN JALAN
METODA AASHTO ‘93
Struktur Perkerasan
Lentur
Struktur Perkerasan
Kaku
BEBERAPA METODE DESAIN PERKERASAN
LENTUR
METODE MEKANISTIK-EMPIRIS
• Metode AASHTO - 1972
• Metode Analisa Komponen (MAK) - 1987
• Metode AASHTO - 1993
• Metode Austroads - 2011
• Metode Bina Marga - 2017
METODE MEKANISTIK-ANALITIS
• Metode Nottingham - U.K
• Metode Asphalt Institute - U.S
• Metode SHELL - Netherlands
METODA ANALISA KOMPONEN
METODA ASHTO 1993
Parameter Desain AASHTO 1993
• TIME CONSTRAINT
• TRAFFIC (W18)
• RELIABILITY (ZR ; So)
• SERVICEABILITY (PSI)
• MATERIAL PROPERTIES (MR ; a ; SN)
• DRAINAGE (m)
Time Constraint
Traffic(W18) - 1
• Distribusi Arah (DD)
50 50
DD = 0,5
DL = 50%
Jenis Kendaraan
Sumbu Kendaraan
Sumbu Kendaraan
Traffic(W18) - 2
Traffic(W18) - 3
Angka Ekivalen Beban Sumbu Kendaraan (E)
GOL. Gol 2-5a 5b 6A 6B 7A 7B 7C
Waktu
Jenis Kendaraan Kendaraan Ringan Bis Besar Truk 3 sumbu Truk Gandeng S-Tandem-Tridem
1,1 1,2 1,1 1,2 1.2.2 1.2-2.2 1.22-222
Waktu
Truk 2 sumbu (4 Truk 2 sumbu
roda) (6 roda)
Jenis Kendaraan Kendaraan Ringan Bis Besar Truk 3 sumbu Truk Gandeng S-Tandem-Tridem
1,1 1,2 1,1 1,2 1.2.2 1.2-2.2 1.22-222
• Data Material :
Asphalt Surface Layer ; EAC : 400,000 psi
Granular Base Layer ; EBS : 30,000 psi
Granular Subbase Layer ; ESB : 11,000 psi
TERIMA KASIH