Units Sale of
Energy Meter Reading generated Cosumption(Units) Electricity(Units) Tax Payable Details
SI.No.
Sold
Opening Reading
transmission line
Remarks
Units generated
Closing Reading
Total
Energy meter
Consumption
Consumption
Through Grid
Through Grid
transmission
Dedicated
Dedicated
Constant
Through
Through
Auxilary
Auxilary
Captive
Captive
line
1 1,574.41 1,588.83 418181.82 6030180.0 1488890 167290 4374000 0 74444.5 16729 NA 0 91173.5
2 525 525 50 0 0 0 0 0 0 0 0 0 0
3 737.49 737.49 1 0 0 0 0 0 0 0 0 0 0
Total 91173.5
Note 1: In case of third Party sale the details of sale shall be furnished along with PPA agreement and OM copy from the concerned ESCOM.
Note 2: Supply and consumption as provisionally determined by the inspecting officer.
For Sathavahana Ispat Ltd
HOD(ELE)
Energy Meter Reading
SI.No.
Opening Reading
Closing Reading
Energy meter
Constant
March 19 to
31
April
May