Lumber requirements 2,000 board feet 2,000 board feet 200,000 board feet
2. The tasks shown in the following table are to be assigned to workstations. Management has designed an
output rate of 60 units per day. Assume 480 minutes are available per day.
i) Draw precedence diagram
ii) Compute the cycle time: (CT) =
iii) Compute the total time: (t) =
iv) Determine the minimum number of required workstation: (Nmin) =
v) Compute the idle time and production line efficiency:
620,000