02 ITP - Structural
02 ITP - Structural
- Delivery Order
- Dimension - Packing List
- Material Identification - Purchase Order
3 Material Inspection H W H Material Acceptance Certificate (MAC)
- Material Grade & Size - Mill Cert
- Physical Condition - GRIN
- AFC Drawing
- Weld Parameter
- Weld Appearance
4 WPS/WPQT - AWS D1.1 H H H&R Approved PQR/WPS/WQT
- NDT / Mech Test Report
- Essential Variables
- NDT Report
- Visual - Welder Certificate
5 Welder Qualification Test (WQT) - NDT - AWS D1.1 H H H&R - Welder Pass
- Mechanical Testing - Approved WQT
- Mechanical Testing Report
7 Recording Consumable Batch No - Welding Consumable Cert - Welding Consumable Control Procedure H R/M M Consumable Control Record
- Quantity Issue/Return
Distribution, Issue Control and Return of
8 - Types of Consumable - Welding Consumable Control Procedure H M M/R Electrode Issuance Record
Welding Consumable
- Consumable Baking/Holding/Rebake
*Note:
1. A = Approve 3. W = Witness 5. R = Document Review
2. H = Holding Point 100% 4. M = Monitor Process
ENGINEERING, SUPPLY, DELIVERY, INTSTALLATION, TESTING, COMMISSIONING AND MONITORING OF SWORP
GRE PIPING VISCOUS DAMPER ONLINE INSTALLATION
- Dimension Check
- Heat Number
10 Marking, Cutting and Edge Preparation - AFC Drawing W W W
- Material Type/Grade/Size
- Piece Mark
- Electrode
12 Welding Work - Welding Process - Approved WPS W W W
- Welder Number
- MPI Procedure
- NDT Requirement - MPI Report
14 NDT Examination - Dye Penetration Procedure H H H
- NDT Personnel Certificate/Qualification - Dye Penetration Report
- PTS 11.15.02
- AFC Drawing
- As Built Drawing
- Material Verification Report
15 Final Documentation - Mill Cert for Material H W R
- Fit-up Report
- Visual Report
- NDT Report
*Note:
1. A = Approve 3. W = Witness 5. R = Document Review
2. H = Holding Point 100% 4. M = Monitor Process