Project : Jointing FO PLTU Suralaya

Lokasi : Suralaya
Subject : Pengajuan Harga

No Pekerjaan Jumlah Satuan Unit Rate Total

A JASA
1 Survey jalur kabel (incl. Spotting GPS untuk FOC) - LOT -
2 Penarikan FOC ADSS Short Span - M -
3 Galian Penarikan Jalur Tanah Taman (Inc. Patok/Tanda, Perbaikan Tanaman/Aspal/Trotoar, Perapihan Lokasi) - M

4 Galian Penarikan Jalur Rojok Alur (Inc. Patok/Tanda, Perbaikan Tanaman/Aspal/Trotoar, Perapihan Lokasi) - M
5 Handhole 40x40x40 cm (Permanen) - LOT
6 Manhole 80x80x100 cm (Permanen) - LOT
7 Jointing per core (incl. labeling Joint Box) 76 AU 45,000 3,420,000
8 Tracing core (incl. labeling Joint Box) 48 AU 10,000 480,000
9 OTDR per core 48 AU 33,714 1,618,272
10 Labeling Joint Box - U -
11 Labeling Kabel (1 pole 2 label, khusus perapihan label) - U -
12 Labeling In Site Plan (labeling patch cord, labeling perangkat POP dan User) - LOT
13 Instalasi FOT MC (POP-CPE) - AU
14 Instalasi Splitter GPON / ODP / box - AU
15 Perapihan dan Pemasangan Kawat Selling + I-ring per Meter - M
16 Penarikan FOC under 1.000 m (include Jasa Penarikan, Aksesoris, Jointing, OTDR, dan Perijinan diluar Sitac) - LOT

17 Pembongkaran kabel ADSS Short Span - M -


18 Galian Penarikan Jalur Boring (Inc. Patok/Tanda, Perbaikan Tanaman/Aspal/Trotoar, Perapihan Lokasi) - M
19 Penarikan FOC ADSS Long Span (inc. dokumentasi) - M
20 Instalasi material dan aksesoris ADSS LS - AU
21 Jointing ADSS LS per core - AU
22 Redruming kabel eksisting ADSS LS - M
23 Instalasi CCTV (termasuk survey, instalasi, dan dokumentasi hasil pekerjaan serta material UTP max 50m) - AU

24 Instalasi Access Point (termasuk survey, instalasi, dan dokumentasi hasil pekerjaan serta material UTP max 50m) - AU

25 Instalasi VMS (Video Management System), termasuk survey,instalasi dan dokumentasi hasil pekerjaan - AU
26 Instalasi Drop Wire (termasuk Jasa Penarikan, Aksesoris, Jointing, OTDR) - LOT
27 Instalasi Rack dan Power Supply (rectifier, battery, AC/DCPDB, integrasi, testcomm) - AU
Jumlah Jasa 5,518,272
B MATERIAL
1 Fitting Deadend, 6 - 48 core (Inc. Fitting Deadend, Strain clamp, Stop Link, Steel Band, Labeling) - U -
2 Fitting Suspension, 6-48 core (Inc. Stop Link, Steel Band) - U -
3 Fitting Deadend, 96 - 144 core (Inc. Fitting Deadend, Strain clamp, Stop Link, Steel Band, Labeling) - U
4 Fitting Suspension, 96-144 core (Inc. Stop Link, Steel Band) - U
5 Bracket Deadend (incl. Steel Band, Stop Link) - U -
6 Bracket Suspension (incl. Steel Band, Stop Link) - U -
22 Joint Box 48 Core U -
23 Joint Box 96 Core - U
24 Joint Box 144 Core U -
25 ODF Rack Mounted 6 Core (tipe SC upc) - U
26 ODF Wall Mounted 6 Core (tipe SC upc) - U
27 ODF Rack Mounted 12 Core (tipe SC upc) - U
28 ODF Rack Mounted 24 Core (tipe SC upc) - U
29 ODF Rack Mounted 48 Core (tipe SC upc) (Setara Litech / 3M) - U
30 ODF Rack Mounted 96 core (tipe SC upc) (Setara Litech / 3M) - U
31 ODF Rack Mounted 144 core (tipe SC upc) (Setara Litech / 3M) - U
32 Rack Wall Mounted 12 U - U
33 Pipa Galvanis 3/4" (2 meter) - BTG
34 Pipa Galvanis 1/4" (2 meter) - BTG
35 Pipa PVC 3/4" (3 meter) - BTG
36 Subduct HDPE outer Ø 50 mm, inner Ø 42 mm - M
37 Subduct HDPE untuk Crossing (bisa memuat minimal 3 kabel FA kapasitas 96/144 core) - M
38 Tiang Besi 7 m (incl Jasa Pasang, Cat, Izin) - BTG
Jumlah Material -
C AKOMODASI (Melampirkan dokumen pendukung) -
Transportasi Luar Kota untuk minimal 2 Drum atau 150KM (dari kota pengambilan ke lokasi penarikan), untuk
1 - LOT -
penarikan ADSS SS
2 Transportasi tim mitra antar regional (Pergi-Pulang) / orang 1 LOT 1,000,000 1,000,000
Transportasi kabel, tim, dan material untuk jarak >150Km (kabel dihitung per 4 drum, dari gudang pengambilan segmen
3 -
kabel ke lokasi penarikan), untuk penarikan ADSS LS lokasi
Jumlah Akomodasi 1,000,000
Grand Total 6,518,272

Suralaya, 25-November -2019

Diajukan Disetujui

(Mamas Sanjaya) (Feri Setiawan)