Download as pdf
Download as pdf
You are on page 1of 1
Im association with sterling indo tech YONGMA ENGINEERING CO.LTD donsultents (p) ltd TL office: Mayu-I1, Roing, Dist-Lower Dibang Valley, (A.P.) 792110 Email-troina@sterlingindstech.com YECL-SIPL/NH-313/R-H/2018/ F.z, Dated : 10/09/2018 ors To, M/s DRA-ITK JV) Mayu-II, Roing (AP) Sub: “Construction of 2-Lane Road with paved shoulders from KM 16.00 of Roing-Hunll Section to KM 21.500 of Hunli-Anini Road (GREENFIELD ALIGNMENT) (NH-313) (TOTAL LENGTH = 74.863 KM) in Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE on Engineering, Procurement and Construction(EPC) Basis” + Subs ion of Video Recording Dear Sir, With reference to the subject cited above, you are requested to submit the Video Recording of the stretches taken under trace cutting from KM 16.000 of existing Hunli-Anini Road (KM 0.000 to 7.000) of the Greenfield project in terms of the Article 11.16 of the Contract Agreement dated 31/3/2017 by 15" of Sep’2018. The fecording should consist of status of terrain (before and after trace cutting) in 3-4 hours compacted disc or digital videos. Please note that the same should be submitted within 15 days after the close of each quarter ie. by 15 of Oct, Jan, Apr and Jul every year. ‘Thanking you, Yours faithfully, FOR YECL in assn with SICPL cc: ‘The Executive Director (P), NHIDCL, Guwahati ‘The GM (Tech), NHIDCL, HQ, New Delhi - For information please. The GM (P), Mayu-II, Roing (AP)

You might also like