Letter No.43

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
Yongma Engineering Co,Ltd... sciation with consultants (p) Ite ‘TL Office: Mayu Il, Dist-Dibang Valley Roing Arunachal Pradesh,Pin-792110 Email ID: -oing@sterlingindotech.com Head Office:301-302 Times Centre,Sector-54 Gurugram-122003 Haryana, INDIA Phone: 0124-4746202; Email ID: anilverma@ymeng.in Branch Office: 601, Sunny Mart, New Aatish Market, Jaipur-302020; INDIA; Phone: 0141-3301800; Email ID: - ho@sterlingindotech.com YECL-SIPL/NH-313/R-H/F-04/2018/ 042, Dated: 10/07/2018 To, M/s DRA-ITL (JV) 401, “The Grand Mall” Opp-State Bank Zonal Office, ‘SM. Road, Ambawadi, Ahmedabad 380015 Sub: “Construction of 2-Lane Road with paved shoulders from KM 16.00 of Roing-Hunli Section to KM 21.500 of Hunli-Anini Road (GREENFIELD ALIGNMENT) (NH-313) (TOTAL LENGTH = 74.863 KM) in Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE on Engineering Procurement and Construction(EPC) Basis Ref: Your letter No. DRA-ITL/NH-313/R-H/2018/09 dated: 12/06/2018 Dear Sir, With reference to the subject cited above, details of hydro electric power project as per your letter under reference is being attached for further necessary action. Please acknowledge. Thanking you, Yours faithfully, For YECL in Association with SICPL. foe [C.P.GAUR] ‘TEAM LEADER GREENFIELD PROJECT ENEL: AS ALOVE Pye toBe cc : The Executive Director (P), NHIDCL , Guwahati ‘The General Manager (Tech), NHIDCL, HQ, New Delhi- For info please. The General Manager(P), NHIDCL, Mayu-lI, Roing (AP) feaier ag-seehta oftatsar Dibang Multipurpose Project ‘Mayu Sector, P.O: Roing District- Lower Dibang Valley (A.P.) No. NH/DMP/CE/ "7 | 4 Date -4.7.2018 To, ‘The General Manager (Projects) wipe $80-Roing Sub.: Regarding your requirement for imation/details of Project control points an et: Your letter no, NHIDCL/H-A/0-74/AE/80-ROING/2017-18/35 d 2 si, ‘AS per your requirement a5 mentioned in the letter under reference dated 26.06.2018 the following are the information/details. (i) Location of Hydel Project Latitude:28°20'7", Longitude: 95°46'38", Dam site: 1.4 km U/S of Ashupant nala with Dibang river Dist: Lower Dibang Valley, ‘Arunachal Pradesh (il) Submergence level- $30.300m {ii)Location and values of permanent Benchmarks of the Hydel project: S1.No. | Easinggny | Nontingtmy ] EUay D TRemaris—] 7 saa020 S59 3I3.79__| Rope way UBank | Near Fanging bridge, Munli z 365722 Baa BIBHG | Rope way BARK Village {iv)Key plan of the Hydel Project- Enclosed (v}Contact person- 1, Sh. Tage Lomdak, Manager(Civil)- 9436894145 2. Sh. Swapan Kumar Kundu (ASO)- 8170011411 . Thanking you 013 nates ro che de er (civil) Dibang Multipurpose Projet Se od Fenn i Se Regd Office: NHPC Office Complex, Sector-33, Faridabad; Haryana es Pron: Roig 3803 222002223009 (Fan) Pasigha- 0368-2224734, 2225883 (raya? Email: denn nhac uahan ma

You might also like