Yongma Engineering Co,Ltd... sciation with consultants (p) Ite
‘TL Office: Mayu Il, Dist-Dibang Valley Roing Arunachal Pradesh,Pin-792110 Email ID: -oing@sterlingindotech.com
Head Office:301-302 Times Centre,Sector-54 Gurugram-122003 Haryana, INDIA Phone: 0124-4746202; Email ID: anilverma@ymeng.in
Branch Office: 601, Sunny Mart, New Aatish Market, Jaipur-302020; INDIA; Phone: 0141-3301800; Email ID: - ho@sterlingindotech.com
YECL-SIPL/NH-313/R-H/F-04/2018/ 042, Dated: 10/07/2018
To,
M/s DRA-ITL (JV)
401, “The Grand Mall”
Opp-State Bank Zonal Office,
‘SM. Road, Ambawadi, Ahmedabad 380015
Sub: “Construction of 2-Lane Road with paved shoulders from KM 16.00 of Roing-Hunli
Section to KM 21.500 of Hunli-Anini Road (GREENFIELD ALIGNMENT) (NH-313)
(TOTAL LENGTH = 74.863 KM) in Arunachal Pradesh under Arunachal Pradesh
Package of SARDP-NE on Engineering Procurement and Construction(EPC) Basis
Ref: Your letter No. DRA-ITL/NH-313/R-H/2018/09 dated: 12/06/2018
Dear Sir,
With reference to the subject cited above, details of hydro electric power project as per
your letter under reference is being attached for further necessary action.
Please acknowledge.
Thanking you,
Yours faithfully,
For YECL in Association with SICPL.
foe
[C.P.GAUR]
‘TEAM LEADER
GREENFIELD PROJECT
ENEL: AS ALOVE Pye toBe
cc : The Executive Director (P), NHIDCL , Guwahati
‘The General Manager (Tech), NHIDCL, HQ, New Delhi- For info please.
The General Manager(P), NHIDCL, Mayu-lI, Roing (AP)feaier ag-seehta oftatsar
Dibang Multipurpose Project
‘Mayu Sector, P.O: Roing
District- Lower Dibang Valley (A.P.)
No. NH/DMP/CE/ "7 | 4 Date -4.7.2018
To,
‘The General Manager (Projects)
wipe
$80-Roing
Sub.: Regarding your requirement for imation/details of Project control points an
et: Your letter no, NHIDCL/H-A/0-74/AE/80-ROING/2017-18/35 d 2
si,
‘AS per your requirement a5 mentioned in the letter under reference dated 26.06.2018 the following are the information/details.
(i) Location of Hydel Project
Latitude:28°20'7", Longitude: 95°46'38",
Dam site: 1.4 km U/S of Ashupant nala with Dibang river
Dist: Lower Dibang Valley,
‘Arunachal Pradesh
(il) Submergence level- $30.300m
{ii)Location and values of permanent Benchmarks of the Hydel project:
S1.No. | Easinggny | Nontingtmy ] EUay D TRemaris—]
7 saa020 S59 3I3.79__| Rope way UBank | Near Fanging
bridge, Munli
z 365722 Baa BIBHG | Rope way BARK Village
{iv)Key plan of the Hydel Project- Enclosed
(v}Contact person- 1, Sh. Tage Lomdak, Manager(Civil)- 9436894145
2. Sh. Swapan Kumar Kundu (ASO)- 8170011411 .
Thanking you
013
nates ro
che de er (civil)
Dibang Multipurpose Projet
Se
od
Fenn i Se
Regd Office: NHPC Office Complex, Sector-33, Faridabad; Haryana es
Pron: Roig 3803 222002223009 (Fan) Pasigha- 0368-2224734, 2225883 (raya?
Email: denn nhac uahan ma